Controlling moisture loads with AHUs, FCUs and PAUs: six design decisions

AHU, FCU and PAU: 6 moisture load control decisions

How do AHUs, FCUs and PAUs work together to control humidity and fresh air loads? CEO Doan Van Hoang  – HRT shares 6 decisions that help optimize HVAC design, operations and performance.

How do AHU, FCU and PAU coordinate? 6 decide to control humidity load and fresh air

In managing HVAC projects, I often pose a question to the technical team:

Why has the project installed enough AHUs, FCUs and PAUs, the room temperature meets the requirements but the humidity is still high, condensation appears and electricity costs are not well controlled?

This is a situation that needs to be evaluated from a system-wide perspective.

A device with appropriate cooling capacity does not necessarily ensure effective system operation if the division of heat load, moisture load and fresh air organization have not been properly designed.

AHUs, FCUs and PAUs have different functions but can coordinate to handle temperature, humidity, ventilation and air quality requirements.

From HRT's technical management perspective, I don't want to start with the question:

“What capacity should I choose AHU, FCU or PAU?”

I want to identify three issues first:

  • Which device is responsible for handling the current heat load?

  • Which equipment is responsible for handling moisture and fresh air loads?

  • How do devices coordinate without wasting energy?

Proper AHU, FCU and PAU coordination must start with the division of air handling responsibilities, not just with equipment capacity selection.

To do this, I recommend six important technical decisions before system design, construction, and acceptance.

1. Decide to divide AHU, FCU and PAU functions from the beginning

The mistake I want to avoid is selecting equipment before determining the responsibilities of each system.

An office building, hotel or factory can use many different HVAC configurations.

There is no suitable combination of AHU, FCU and PAU for all projects.

Determine device functionality

AHU – Air Handling Unit

Air handling equipment can be configured to filter, cool, dehumidify, and distribute air to one or more zones.

Depending on the design, the AHU can handle return air, fresh air or a mixture.

FCU – Fan Coil Unit

Terminal equipment typically uses fans and heat exchangers to condition the air in a room or area.

The FCU can handle some of the humidity load when the coil is operating under the right conditions, but the ability to independently control humidity is often limited.

PAU – Primary Air Unit

Primary air handling equipment, often serving the needs of filtering, heat treating and dehumidifying outdoor air before supplying it to the system or space used.

PAU plays a notable role in construction projects in Vietnam, where outdoor air often has high humidity.

No device does all tasks by default

For example, a facility that uses an FCU for each room may need a separate PAU system to handle fresh air.

But a properly designed AHU can still handle both return air and outdoor air.

Therefore, I want the technical team to clearly define:

Mission The device can take over
Air conditioning in each room FCU or suitable terminal
Centralized air treatment AHU
Handling outdoor wind PAU or AHU with suitable configuration
Dehumidify the air AHU, PAU or coil of terminal according to design
Air distribution AHU, PAU and duct system
Control by each area FCU or devices with zone control functions

 

This table is functionally oriented and does not replace design calculations.

Decisions to finalize: Which equipment is mainly responsible for the heat load, humidity load and fresh air of each area?

Output: Diagram of functional division of AHU – FCU – PAU according to area of use.

2. Decide to divide the sensible heat load and the latent heat load

This is a decision I pay special attention to when designing HVAC for projects in Vietnam.

A satisfactory room temperature does not mean that the humidity is controlled.

To solve the problem, it is necessary to distinguish two components of the cooling load.

What is the current heat load?

Heat load currently involves changing air temperature without directly changing humidity.

Current heat sources usually include:

  • Heat travels through walls, roofs and glass.

  • Solar radiation.

  • Lighting system.

  • Electrical equipment and machinery.

  • The heat appears from the user.

FCU is often used to meet the need for temperature regulation by area.

What is latent heat load?

Latent heat load refers to changes in the amount of water vapor in the air.

Moisture load sources to consider include:

  • Outdoor air is brought into the ventilation.

  • Moisture from the user.

  • Air enters through doors or gaps.

  • Production, cleaning and steam generating processes.

If only the explicit heat load is calculated and the latent load is ignored, the system may meet the temperature but not maintain the required humidity.

How much moisture load can the PAU handle?

In a separate outdoor air treatment option, the PAU can be designed to reduce the moisture content of the fresh air before it is introduced into the space.

Depending on configuration, PAU can also help handle part or most of the moisture load arising in the room.

However, it should not be assumed that PAU always handles the entire moisture load of the building.

Actual capacity depends on supply air status, fresh air flow, internal humidity load and design strategy.

Check air status with data

I asked the technical team to determine:

Parameters Purpose
Dry temperature Evaluate thermal status
Relative humidity Monitor humidity conditions
Moisture content Assess the amount of water vapor in the air
Dew point Control the risk of condensation
Air flow Determine the amount of air processed
Air Enthalpy Supports calculation of total heat treatment load

 

For example, PAU can reduce outdoor air temperature, but if the post-treatment moisture content remains high, the system is unlikely to achieve its dehumidification goal.

Therefore, I do not want to validate the PAU with just one supply air temperature value.

Decisions to finalize: Has the system fully divided visible and hidden loads, and determined the necessary dehumidification capacity of each device?

Output: Balance table of explicit heat load - latent heat load and design air state parameters.

3. Decide to organize fresh air supply suitable for FCU and AHU systems

After dividing the load, the next question is:

Where will fresh air after treatment be supplied?

This is a decision that has a direct impact on air distribution, control and humidity control capabilities.

Option 1 – PAU supplies fresh air directly into the room

In this option, PAU processes outdoor air and distributes it through a separate duct system to the areas.

FCU mainly serves circulating air conditioning according to each room's needs.

The advantage to evaluate is the ability to separately manage fresh air flow and supply air conditions.

However, the system needs to be properly designed in terms of air vents, air distribution, noise and pressure conditions.

Option 2 – PAU supplies processed air to the terminal

In some configurations, air from the PAU is sent to the mixing area or suction line of the terminal.

The plan must be checked for its ability to receive outdoor air flow, air path and impact on fan operation.

Do not arbitrarily connect the PAU pipe to the FCU just because the installation location is convenient.

It is necessary to evaluate air mixing conditions and equipment limitations.

Option 3 – AHU handles mixed wind

For areas requiring centralized air handling, AHUs can be designed to handle outdoor air combined with return air.

At that time, it is necessary to control the fresh air ratio, filtration, heat exchange, dehumidification and appropriate control modes.

The choice must start from the project requirements

Construction conditions Evaluation direction
Many rooms are used independently FCU incorporates a suitable fresh air system
High traffic public area AHU or centralized air handling configuration
Significant fresh wind moisture load Consider PAU with dehumidifying capabilities
Projects have special pressure requirements Designed to synchronize supply, return and exhaust air
Limited ceiling space Evaluate equipment configuration and maintainability

 

Do not choose an option based solely on the initial equipment cost.

Decisions to finalize: In what configuration will fresh air be supplied directly into the room, mixed at the device, or centrally processed?

Output: Approved diagram of fresh air, return air and supply air distribution.

4. Decide to control dew point and risk of condensation

A building may be operating at the correct temperature but still have water on the ceiling, vents or pipe surfaces.

In that case, I would like the technician to find the cause instead of just increasing the set temperature or adding insulation.

Correct understanding of dew condensation conditions

Condensation can occur when the surface temperature is lower than the dew point temperature of the exposed air.

Therefore, it is necessary to evaluate simultaneously:

  • Air temperature.

  • Humidity and dew point.

  • Surface temperature.

  • Condition of insulation and vapor barrier.

  • Ventilation conditions of the ceiling space.

  • Unusual sources of moisture.

Don't confuse dew with water leaks

Water appearing at the ceiling may be related to condensation on cold surfaces.

But the water can also come from the condensate pan, drain line, cold water pipes, or another source.

It is necessary to determine the correct water source before deciding to repair.

Humidity control from PAU

If the PAU does not adequately handle the outdoor wind moisture load, the humidity in the area of use may increase.

When moist air comes into contact with cold surfaces, the risk of condensation may increase.

However, an effective dehumidifying PAU system still needs to be combined with appropriate insulation, vapor barrier and condensate drainage solutions.

Do not change the cold water set point arbitrarily

Increasing cold water temperature can change Chiller performance, but can also affect the dehumidifying capacity of AHU, PAU and FCU.

Conversely, lowering the cold water temperature too much can increase energy demands or create other risks.

Therefore, I require that any changes be evaluated system-wide.

Decisions to finalize: Have air conditions and surface temperatures been controlled to limit condensation within the design range?

Output: Report checking dew point, humidity and locations at risk of condensation.

5. Decided to build control logic to coordinate AHU, FCU and PAU

An HVAC system with many devices may not operate effectively if the devices are controlled independently without a coordinated strategy.

This is an issue that needs to be addressed right in the control design stage.

Distinguishing control goals

FCU: Usually adjusts room or area temperature according to usage needs.

PAU: Can be controlled according to supply air status, fresh air demand, humidity load or design-appropriate goals.

AHU: Can coordinate control of temperature, flow, pressure and humidity according to system functions.

Control according to actual needs

I propose to identify the main operating situations:

Situation Content needs control
The room reaches temperature but the humidity is high Check dehumidification requirements and PAU/AHU status
The cooling load in the room is reduced Adjust the terminal within suitable limits
The need for fresh air changes Evaluate flow control mode according to ventilation requirements
Abnormal sensor Confirm the reliability of measurements and actual conditions
PAU stopped working Determine system responses, alarms, and safe operating modes
The system operates overtime Apply approved operating schedule

 

The above situations need to be specified into operating procedures for each project.

Do not adjust the fresh air flow just to save electricity

If the system is designed to supply the necessary amount of fresh air for ventilation requirements, flow reduction must comply with design limits and applicable regulations.

Do not reduce fresh air arbitrarily, causing indoor air quality to decline.

Test BMS with actual response

A parameter displayed correctly on the BMS is not enough to confirm that the device is operating properly.

It is necessary to check the control signals, equipment status and actual results at the scene.

For example, the cold water valve shows an open command that is not enough to confirm the water flow through the coil meets the requirements.

Decisions to finalize: Does the control logic help the AHU, FCU and PAU properly coordinate heat load, moisture load and ventilation needs?

Output: Operation sequence table, I/O signal list and control function test plan.

6. Decide on acceptance based on the results of the entire system's operation

This is the final and most important decision in quality management.

I don't want to accept the AHU, FCU, and PAU systems just because each device booted up successfully.

Acceptance of individual devices does not automatically prove that the entire system is properly coordinated.

Evaluate air flow

It is necessary to confirm the flow rates within the design scope:

  • Fresh air flow.

  • Level flow.

  • Return flow.

  • Waste flow.

  • Traffic in areas that need separate control.

Measurement results must be compared with approved criteria.

Assess air condition

Depending on project requirements, it is necessary to measure:

Category Purpose
Outdoor temperature and humidity Record input conditions
Wind state after PAU Evaluate the ability to handle fresh air
Wind status after AHU Evaluate supply air conditions
Temperature and humidity in the room Confirm conditions of use
Air flow in each area Confirm delivery
Filter pressure differential Check filter status
Cold water flow and temperature Supports coil productivity assessment
Control mode Confirm device coordination

Evaluate cooling capacity properly

When analyzing the air side, the total heat treatment capacity can be determined from the dry air mass flow rate and enthalpy difference.

Q = ṁ × Δh

In which:

  • Q: Total heat treatment capacity, kW.

  • ṁ: Dry air mass flow rate, kg/s.

  • Δh: Air enthalpy difference, kJ/kg dry air.

The value must be determined from appropriate measurements at actual operating conditions.

Don't just use the dry temperature difference to conclude the full range of heat and moisture handling capabilities.

Power control

Energy efficiency assessment needs to clearly define the scope:

  • AHU fan power.

  • FCU fan power.

  • PAU electricity.

  • The energy part of the chilled water system or central refrigeration system involved.

  • Other auxiliary devices are within the scope of evaluation.

You should not make a commitment to save electricity just because of changing a set point or installing an additional inverter.

Three conditions before handover

Condition 1 – Performance meets requirements

Temperature, humidity, fresh air and environmental conditions meet applicable criteria.

Condition 2 – Safe operating system

No unresolved abnormal conditions arise regarding equipment, controls, condensate, noise or protective conditions.

Condition 3 – Verifiable records

There are measurement parameters, test conditions, comparison results and handling responsibilities that exist.

Decisions to finalize: Does the system meet overall operating requirements and have enough handover data?

Output: TAB minutes, test run reports, air status measurement records and handover records.

7. AHU – FCU – PAU coordination matrix according to project requirements

For managers to have a basis for decision-making, I propose a reference matrix:

Request Solution directions need to be considered Points need to be verified
Office with many small rooms FCU combined with PAU or suitable fresh air system Temperature of each room, fresh air, humidity
Crowded public area The AHU has a suitable fresh air configuration Flow, heat load, air quality
The project has a large moisture load PAU/AHU has the ability to dehumidify upon request Air state, humidity, dew point
Hotel FCU according to room, fresh air handled accordingly Comfort, noise, ventilation, humidity
Industrial factory AHU/PAU according to technological conditions Explicit load, implicit load, pressure and cleanliness
The project requires specific pressure Coordinated supply, return and discharge systems Room pressure differential and related flow

 

This table is not the default design option. The selection should be based on the functions, loads, standards and design data of each project.

8. Five mistakes when coordinating AHU, FCU and PAU

Mistake 1 – Only calculate cooling load and not moisture load

The system can reach temperature but humidity exceeds requirements.

Action: Analyze both visible and hidden loads before determining capacity.

Mistake 2 – Entrusting all dehumidification to the FCU

FCUs can dehumidify under the right conditions, but should not assume the ability to control all moisture loads that arise.

Action: Evaluate the role of PAU and AHU in the overall dehumidification strategy.

Mistake 3 – Design PAU only according to supply air temperature

Air that reaches the design temperature but the moisture content is still high may not meet the moisture load handling requirements.

Action: Determine full inlet and outlet air status.

Mistake 4 – Not coordinating control logic

Devices operating individually can lead to sub-optimal results in terms of temperature, humidity or power.

Action: Build and test control sequences according to load modes.

Mistake 5 – Accepting each device separately but ignoring the results of the entire system

One AHU, FCU or PAU operating normally is not enough to prove that the entire facility meets the requirements.

Action: Perform overall testing and compare design criteria.

9. Frequently asked questions about AHU, FCU and PAU coordination

9.1. Does FCU combined with PAU help control humidity better?

It is possible, if the PAU is designed and controlled to properly handle the outdoor wind moisture load or the indoor moisture load. Results must be verified under actual operating conditions.

9.2. Is PAU required to use the same FCU?

No. Fresh air handling needs can be met with a PAU or other solution appropriate to the HVAC configuration.

9.3. Can AHU completely replace PAU?

In some configurations, the AHU can handle fresh air and return air. However, the possibility of replacement depends on the designed function, capacity and control requirements.

9.4. Why does the room temperature reach but the humidity is still high?

It may be due to high moisture load, insufficient dehumidification ability, inadequate fresh air flow, air infiltration or control strategy that does not meet the requirements.

9.5. Can fresh air be reduced to save electricity?

Adjustments may only be considered within the allowable range of ventilation requirements, performance and applicable regulations. Do not arbitrarily reduce it below the necessary level.

9.6. When is it necessary to measure dew point?

When evaluating humidity control, condensation risk, supply air conditions or areas with special environmental requirements.

9.7. Does PAU reduce the load on FCU?

It is possible, depending on the air status after the PAU and how the load is divided. Efficiency must be determined by damp heat calculations and actual distribution configurations.

10. HRT – Design and operate HVAC with system-wide responsibility

In managing HVAC projects, I do not evaluate design quality by the number of installed equipment.

What I need is a system that properly addresses the project's requirements.

The AHU, FCU and PAU must be coordinated to control heat load, humidity load, air flow and operating conditions.

That is also how HRT aims at three core values.

GET IT RIGHT

Correctly determine fresh air demand, current heat load, humidity load and function of each device.

CLEARLY

Each item must have design specifications, boundaries of responsibility, acceptance criteria and test evidence.

DEDICATED

Monitor performance after handover, supporting operators in controlling air quality and long-term costs.

HRT provides HVAC general contractor solutions from design, construction to maintenance and renovation, including:

  • Design AHU, FCU and PAU systems.

  • Water Chiller System.

  • VRV/VRF system.

  • Fresh air, ventilation and energy recovery system.

  • Measure and balance wind and water.

  • Control and monitor BMS.

  • Renovate and optimize HVAC energy.

For projects that need to evaluate the ability to coordinate AHU, FCU and PAU, preparing design documents, load, fresh air diagram and operating data will help the survey process more accurately.

11. Conclusion: Don't just choose the right equipment, coordinate the right system

An HVAC system can use high quality equipment but still operate inefficiently if the task of handling heat load and moisture load is not clearly defined.

From a management perspective, I require six decisions to be made in sequence:

  1. Determine the function of each device.

  2. Divide visible and hidden loads.

  3. Organize suitable fresh air.

  4. Control dew point and risk of condensation.

  5. Build synchronous control logic.

  6. Acceptance using system-wide operating data.

Unknown load – don't rush to choose a machine.

Unknown function - don't rush to finalize configuration.

No data – no effective conclusions.

That's the HRT approach to every commercial and industrial HVAC project.

KS. Doan Van Hoang – CEO of HRT

HRT – Green Breath for Every Project

Right from the beginning – Clear to the end – Sustainable green.

HRT contact information

Website: https://hrt.vn

Email: ceo@hrt.vn

Hotline: 0909 326 888


Related articles

AHU, FCU and PAU: 7 criteria for selecting HVAC equipment

References

  • HRT – AHU, FCU and PAU: 7 criteria for selecting HVAC equipment.

  • ASHRAE Handbook – Dedicated Outdoor Air Systems.

  • ASHRAE Handbook – Air Handling and Distribution.

  • ASHRAE Handbook – Design and Application of Controls.

The content is technical management oriented. Equipment configuration, capacity, humidity limits, pressure conditions and acceptance criteria must be determined according to design documents, standards and requirements applicable to each project.