Xuân Phương, Hanoi
hvac@hrt.vnContact us
HVAC GREEN – HVAC equipment, spare parts and solutions Sales hotline0995.895.555 Cart0

Articles by CEO Đoàn Văn Hoàng

306 articles

28/11/2026 · English

Controlling moisture loads with AHUs, FCUs and PAUs: six design decisions

26/11/2026 · English

Why do AHU filters clog so quickly? Six checks before replacing them again

26/11/2026 · English

Balancing airflow in concealed VRV units: five decisions before adjusting external static pressure

25/11/2026 · English

Water-cooled chiller acceptance testing: six HRT checkpoints

25/11/2026 · English

Chiller plant optimisation: five decisions before you invest

24/11/2026 · English

HRT Logo - HRT AIR CONDITIONING COMPANY LIMITED | Leading HVAC Contractor in Hanoi | HVAC Contractors

24/11/2026 · English

🌱 THE MEANING OF THE HRT – GREEN LOGO MUST BE PROVED BY ACTION!

24/11/2026 · English

5 COMMITMENTS TO HRT BUSINESS ETHICS – SAY IT, DO IT, TAKE RESPONSIBILITY TO THE END!

24/11/2026 · English

3 CORE VALUES HRT – NOT JUST TO SPEAK, BUT TO ACTION!

21/11/2026 · English

HVAC air leakage: six decisions to reduce waste

21/11/2026 · English

Poor cooling after cleaning an AHU coil? Seven things to check

19/11/2026 · English

Cleaning AHU coils: six decisions before sign-off

19/11/2026 · English

Air duct leakage: five issues to resolve before handover

17/11/2026 · English

HVAC air balancing: seven decisions before handover

16/11/2026 · English

Flushing chilled-water pipework: seven decisions to make

14/11/2026 · English

Building Ventilation: 7 Decisions to Avoid Waste

14/11/2026 · English

Chiller liquid-level sensor faults: seven troubleshooting decisions

13/11/2026 · English

Air Conditioning Duct Construction: 7 Important Decisions