Air Conditioning Duct Construction: 7 Important Decisions

Machine-translated from Vietnamese. Read the original in Vietnamese

Construction of air duct Air Conditioner: 7 Important Decisions

CEO Đoàn Văn Hoàng – HRT share 7 important decisions when constructing air conditioning duct, help limit errors, reduce costs and acceptance testing techniques.

Air Conditioning duct construction: 7 Decisions to Avoid Mishandling After Ceiling Closing

Construction air duct Air Conditioner

A project is entering the final stages of its construction. The air duct system has been installed, the gypsum ceiling is about to be closed and contractors are pushing ahead with the handover.

From the outside, everything looks ready.

But when checking, the technical team found some problems:

  • The air duct has been modified to avoid structural beams but not yet recalculated pressure drop.

  • Some flanges are not fully sealed.

  • The flexible tube that connects to the air terminal is folded.

  • Insulation layer at the rack position has not ensured the continuity of vapor barrier layer.

  • Balancing valve is obscured, which is not convenient for later adjustment.

If closed immediately, these shortcomings can become major repair costs when commissioning systems.

From the perspective of HRT operator, I do not evaluate the quality of air duct construction by the number of square meters of corrugated iron installed or the rate of completion of the volume.

I want the project team to answer three questions:

  1. Has the pipeline been constructed in accordance with the design requirements?

  2. Have the items about to be eclipsed been checked and confirmed for quality?

  3. When the system is in operation, are we eligible to measure and prove the flow rate?

Fast construction but having to remove the ceiling fixing is not effective.

Beautiful installation but flow rate is not reached nor can be considered as completed.

With HRT, the quality of ductwork system must be controlled throughout from drawing, machining, installation to commissioning and acceptance testing.

My point of view: Anything that can be checked before the ceiling is closed must be checked immediately. Do not convert construction risks into operational costs of customers.

1. Why can air duct system be installed in the right form but still operate wrong?

In HVAC systems, a ductwork is the network that transports and distributes air between process equipment, branch lines, and usage space.

For AHU, FCU connecting air duct, ventilation system or central air conditioner VRV/VRF concealed ceiling, pipe quality directly affects the operation results.

A deviation in construction can create many consequences:

Deviation at the site

Possible consequences

Narrowed pipe cross-section

Increase velocity, increase pressure drop

Non-sealed flanges

Air leakage, reduce distribution efficiency

Unreasonable layout, quail.

Increased pressure loss, uneven wind distribution

The mount is not strong

Hammock tube, vibration, stability effect

Insulation layer or vapor barrier is exposed

Condensation and ceiling permeability risks

Air terminal or damper misfitting

Difficult to control flow rate, direction of blowing

Do not perform air balancing

No grounds to confirm actual flow rate

 

These problems may appear individually or interplay.

For example, if a pipeline is scaled to avoid water pipelines, pressure drops can increase. At that time, the air terminal at the end of the line lacks flow rate even though the fan is still operating.

If the engineering team only adjusts the fan speed to compensate for the flow rate, the system may generate additional noise or higher power consumption.

So, you know, a manifestation must not be dealt with without assessing its effect on the entire air duct network.

The principles of design, manufacture, installation and acceptance testing must be compared with the project dossier and appropriate standards.

2. Decision 1: Close pipelines and sections before permitting construction

Construction of air duct

The first mistake I wanted to control was not the workmanship, but the difference between the approved drawings and the actual conditions at the site.

During the implementation, air duct system often has to coordinate with many items:

  • Beams, columns and structures.

  • Water supply and drainage pipes.

  • Fire sprinkler system.

  • Cable trays and power lines.

  • Architectural ceilings and lighting equipment.

  • Other electromechanical systems.

If the installation space is conflicting, the construction team can propose to change the gland direction, altitude or pipe size.

But a seemingly minor change can affect the entire system's aerodynamic characteristics.

2.1. Do not arbitrarily reduce the air duct cross section

Air flow rate through pipeline is expressed by relation:

\[ Q = 3600 \times A \times v \]

Where:

  • Q: Air flow rate, m3/h.

  • A: useful sectional area, m2.

  • v: average velocity of gas flow, m/s.

With the same flow rate, if the pipe cross section decreases, the velocity must increase.

This can increase pressure drop and noise, while changing the fan working point.

Therefore, it is not recommended to narrow the spool size to resolve spatial conflicts without additional calculations.

2.2. Co, quail and transitional segments must be evaluated

The positions to be controlled include:

  • Shrink folds with improper radius.

  • The cross sectional transition was too sudden.

  • The branch has no suitable flow rate distribution.

  • Many accessories cause pressure loss in succession.

  • The pipeline was changed direction but did not update the calculation.

HRT Decision

I asked the project team to finalize three pieces of content before mass production:

  1. Shop Drawing drawing is approved.

  2. MEP coordination and conflict resolution.

  3. Table of design changes and assessment affecting flow rate, pressure head.

Without approval for changes, do not arbitrarily construct other drawings.

3. Decision 2: Control the machining quality and airtightness before mounting to ceiling

 Air duct Air Conditioner

A pipeline that's already installed at a high level is harder to inspect in its entirety than it would be in the work area.

Therefore, HRT needs quality control from the beginning.

Problems that may arise

  • The suit is not proper.

  • Wrong machining size.

  • Flanges are curved or irregularly fitted.

  • Sealing gaskets are not suitable.

  • The graft lacks airtightness.

  • Link location does not meet the requirements.

  • Other machining accessories approved details.

These errors can cause the system to lose its flow rate before air reaches the room for use.

Controlling Way

At the workshop: Check the material, size, reinforcement structure, flanges and accessories.

At the construction site: Check the coupling quality, straightness, airtightness and equipment abutment position.

Before obscuration: Perform test or airtightness test according to the range, test pressure and acceptance criteria specified in the technical records.

The fabrication and evaluation of pipelines can be referred to TCVN 13580:2023 and SMACNA standards suited to the project requirements.

HRT Decision

Do not accept the conclusion “closed viewfinder” instead of the test record when the project requires leak testing.

Airtightness must be verified according to technical requirements, not just based on observation.

4. Decision 3: Test the rack, flexible hose and noise vibration control at the same time

A properly hung pipe may not be technically hung.

I'm asking the surveillance team to evaluate the suspension structure along with the operational characteristics of the tube.

4.1. The suspension rack must be suitable to the load

Need to consider:

  • Pipe size and material.

  • Pipe volume and insulation layer.

  • Accessories, valves and equipment installed on the line.

  • Distance between brackets.

  • Anchor point to the structure.

  • Vibration and displacement conditions.

It is forbidden to take a fixed mount distance to apply to all systems.

4.2. Control flexible air duct

Flexible air duct is often used at the connection site in accordance with the design, especially the connection to the air terminal.

However, if installed incorrectly, flexible hoses can become a major point of pressure loss.

Need to avoid:

  • Tubes are compressed or twisted.

  • The pipes are folded.

  • The bending radius is too small.

  • Longer flexible tubes are not necessary.

  • Connector is not sealed or missing fixing.

4.3. Distinguishing noise caused by fans and pipelines

Not all noise comes from fans.

The noise source may be related to gas flow velocity, dynamic jamming accessories, vibration transmitted through structures, or inappropriate air terminal.

The engineering team must identify the source before deciding to add a sound absorber, change the fan speed or renovate the pipeline.

HRT Decision

Simultaneous Testing Suspension structure – flexible hose – noise vibration source before handing over the area for finishing ceiling.

5. Decision 4: Do not acceptance testing thermal insulation if condensation risk has not been controlled

This is the item I pay special attention to the refrigeration air duct system at high humidity buildings.

A pipeline may have been formally fully insulated but condensation still occurred during operation.

Why does air duct suffer condensation?

When the temperature at the surface exposed to moist air is lower than the dew point of the medium, water vapor can condense into droplets.

The problem is not just the thickness of insulation.

The risks are easy to develop, including:

  • The joint between the insulation panels.

  • The angle of contraction and the transition.

  • Rack area.

  • Mounting damper and door visit position.

  • The connection between the air duct and the device.

  • Wall - piercing or floor - piercing.

Four Contents to Control

First – Thermal insulation thickness. Selected according to design conditions and technical requirements.

Second – the continuity of the vapor barrier layer. Don't let moisture get into the low - temperature area through the cracks.

Third – Handle details at the rack. Do not allow the suspension structure to create heat bridges beyond the permissible level.

Fourth – Actual temperature and humidity conditions. Evaluate according to the operation environment of each area.

HRT Decision

Before closing the ceiling, the construction team must complete inspection of joints and vapor barrier layer in hard-to-reach locations later.

Don't wait for a new stain to appear on the ceiling to look for thermal insulation.

6. Decision 5: Test damper and air terminal function, not only test mounting position

A beautiful, in line air terminal with architectural lights and ceilings does not prove the satisfactory air distribution design.

Confirmation of both position, function and adjustability is required.

6.1. For air terminals

The technical team must check:

  • Type of air terminal.

  • Actual size and location.

  • Blowing direction and air distribution zone.

  • Connect to the pipeline.

  • Conditions for assembly and cleaning.

  • Ability to measure flow rate after construction.

Changes in air terminal locations for architectural purposes must be evaluated to affect air distribution, especially in meeting rooms, hotel bedrooms and areas with high facilities requirements.

6.2. For damper

Do not consider all damper to have the same function.

Need to distinguish:

Device Type

Functions to control

Balancing valve

Adjust and distribute flow rate

Open/close valve

Close or open air flow

Control Valve

Adjust to signal or control strategy

Fire Stop Valve

Perform fire safety function according to the design and certification applied

Smoke Valve

Serving smoke control function according to system design

For fire - preventing valves and smoke valves, they must be controlled strictly according to their types, locations, installation structures, inspection accessibility and fire prevention and fighting requirements of the works.

HRT Decision

Do not close the ceiling when the valve needs maintenance or calibration without proper access.

If the equipment is installed correctly but cannot be checked, adjusted or maintained, the construction plan is not complete.

7. Decision 6: Hygienic latching and maintenance capability before obscuring the system

Air Conditioner

One problem that is often overlooked during construction is cleaning the inside of pipes.

During construction, cement dust, metal mites, excess material and other dirt can enter through unshielded pipe ends.

If uncontrolled, contaminants may be introduced into the system when the fan is operating.

Things to do

  • Cover the end of the tube waiting to connect.

  • Check and remove excess supplies from the tube.

  • Clean accessible areas.

  • Quality control inside the tube before operation.

  • Confirm the door visit location for inspection and cleaning.

  • Save the image and test record for important paragraphs.

In particular, I asked the project team not to just ask:

“Is it possible to install this pipeline?"

But we have to ask:

“After three years of operation, can the maintenance team access the locations that need cleaning and inspection?”

HRT Decision

The dossier of hygiene inspection and maintenance conditions must be completed before the transfer of the ground for completion.

Do not accept saving several hours of construction to create many years of difficulty in maintenance.

8. Decision 7: Do not sign acceptance testing when the actual flow rate has not been confirmed

This is a final decision but has a huge impact on the quality of the handover.

I disagree with acceptance testing of piping systems only because the fan has run, the air terminal has had air blown out and the ceiling is complete.

What is TAB?

TAB stands for Testing, Adjusting and Balancing – Check, adjust and balance the system.

For wind systems, this process helps confirm and calibrate the air distribution to design specifications.

Content may include:

  1. Confirm the operation condition of the fan.

  2. Check the status of filter and damper.

  3. Measure your total flow rate.

  4. Measure flow rate at branches and air terminals.

  5. Adjustable balancing valve.

  6. Re-check affected sites after adjustment.

  7. Make a table of measurements against the design.

SMACNA documentation on Testing, Adjusting & Balancing emphasizes testing and balancing systems to meet design operation conditions.

Sample table acceptance testing flow rate

Locations

Design (m3/h)

Real measurement (m3/h)

Misalignment

Air terminal A

300

285

−5,0%

Air terminal B

400

380

−5,0%

Air terminal C

250

270

+8,0%

 

Figures illustrate calculation methods, not acceptance testing results of an actual project.

The deviation is calculated as:

\[ \text{Dislocation}=\frac{Q_\text{measuring}-Q_\text {design}}{Q_\ text{design}}\times100\% \]

The result is evaluated according to the tolerance, measurement conditions and acceptance testing criteria in the project dossier. A fixed rate shall not be applied to all systems.

HRT Decision

Handover shall be made only when the requirements for measurement, inspection and balance are within the scope of the contract completed and confirmed.

The finished construction is the completion of the volume. Measurement and inspection are the basis for quality proof operation.

9. Three quality checkpoints HRT before handover

I want every HVAC project to have clear checkpoints, avoiding error detection when the building is complete.

  1. Gate 1 – Before production and installation

    Confirm Shop Drawing, MEP coordination, pipeline size, materials, rack structure and construction plan.

  2. Gate 2 – Before Ceiling Closing

    Check splices, airtightness, mounts, thermal insulation, damper, door visits, hygiene and those that will be obscured.

  3. Port 3 – Before acceptance testing handover

    Confirm commissioning results, TAB, required parameters, as-built documentation and operation maintenance instructions.

Each verification checkpoint needs a person in charge, records of confirmation and list of existing to process.

If you don't qualify, don't move on to the next stage just to meet your progress.

10. Control panel 11 groups of errors in air duct construction

This table helps manage the site by inspection items rather than waiting for an incident to appear to find a cause.

STT

Control Items

Preferred time

1

The correct pipe size and cross section design

Before machining, when installing

2

Joints, flanges and airtightness

Before thermal insulation, obscuration

3

Suspension and support structure

In installation

4

Co, quail, transition and branch turns

Before machining, when installing

5

Straightness and bending of flexible hose

Previous Closed Ceiling

6

Thermal insulation, vapor barrier and condensation hazard

Previous Closed Ceiling

7

Air terminal location and function

When installing, commissioning

8

Valve type, dimensional mounting and maintenance approach

Previous Closed Ceiling

9

Vibration and noise

Khi commissioning

10

Pipeline cleaning

In construction, before commissioning

11

Measuring flow rate and air balancing

Previous acceptance testing

 

The control board must be adjusted according to the characteristics of works; not all pipelines have the same structure, working conditions or risk levels.

11. Checklist HRT before allowing ceiling closure

Pre-closed control of ceiling

0/14 items

Shop Drawing and Approved Changes
Size, altitude, direction profile line fitting
The co, quail, transition segments have been checked
Connectors, flanges, sealing materials meet requirements
Tested mounts, suspension tying, anchors and support structures
Flexible hose does not fold, twist or compress abnormally
Insulation layer and vapor barrier finished continuously
Damper right type, dimensionally fitted and accessible
Air terminal and connections according to drawing
Coordinated MEP, structure and fire protection requirements
Pipelines are cleaned and shielded as needed
Previous tests occultation completed according to the profile
There are scene photos, minutes and lists of existence
The person in charge has confirmed eligibility for ceiling closure
Reset Copy checklist

Checklist is a tool to support site control, not replace acceptance testing minutes, approved records and specific technical requirements of the project.

12. Standards to be compared when constructing ductwork

In Vietnam, three important criteria to be considered within the respective scope of application include:

  • TCVN 5687:2024: Ventilation and air conditioning – Design requirements.

  • TCVN 13580:2023: Ventilation and air conditioning – Requires pipeline fabrication.

  • TCVN 13581:2023: Ventilation and air conditioning – Requirements for piping installation and acceptance testing systems.

In addition, SMACNA documents on air duct fabrication, airtightness testing, quality monitoring and system balance can be compared when approved for use.

The point I want to note is that not using standards routinely. Each work needs to confirm the document version, scope of application, design requirements, mandatory regulations and acceptance testing criteria agreed.

13. Frequently asked questions about air conditioning duct construction

Air duct is installed but the room still lack refrigeration.

It may be due to lack of flow rate, large pressure drop, leakage, unbalanced damper, filter obstruction or air handling equipment has not met thermal load. Testing should be done before conclusion.

Why does the air duct retain water despite thermal insulation?

The cause may be related to insulation thickness, vapor barrier leakage, heat bridge or inappropriate temperature – humidity conditions.

Is it possible to reduce the pipe size to avoid beams?

Only after the assessment of aerodynamic effects, pressure drop, noise and approved design changes.

How much distance is the air duct mount correct?

Depends on the size, material, load, rack construction and applicable standards. There is no single gap suitable for all types of pipeline.

Is leak testing required for the whole air duct system?

The testing scope, method, pressure and evaluation criteria should be based on the technical dossiers and applicable standards. It is not recommended to set by themselves requirements for testing in its entirety or ignore testing when the dossiers have prescribed it.

When is the ceiling covering of the air duct allowed?

When the items to be inspected before concealing are satisfactory, the shortcomings have been handled and certified by the competent parties according to the project process.

Why air balancing after construction?

Since the actual flow rate may differ from the calculated value due to pressure loss, fan characteristics, valve status or installation changes. air balancing helps bring the system to the required condition within the adjustable range.

14. Conclusion: Don't let the ceiling closure become the end time of quality control

From the perspective of HRT operator, I consider the air duct system to be an important part of the operational quality of HVAC works.

What I need is not a report on how many square meters of air duct we've installed.

I need to know:

Is the design correct? Have the hidden parts been checked? Can maintenance be done? Have the measurements been checked?

Seven decisions to be made throughout the year include:

Designing fasteners → Machining control → Suspension test → Thermal insulation control → Valve and air terminal confirmation → Hygiene and maintenance assurance → Measurement acceptance testing.

Doing right from the start helps to limit dismantlement, reduce arising, control progress and create the basis for stable operation of the system after handover.

At HRT, we aim to:

No acceptance testing by induction. No obscuration when not tested. No handover when there is no quality proof.

HRT – Right from the beginning – Clear to the end – Sustainable Green.

HRT Contact Information

HRT Air Conditioning and Ventilation Company Limited

  • Hotline: 0909.326.888

  • Email: CEO@hrt.vn

  • Website: https://hrt.vn

  • Address: No. 4, Lane 6, Miao Nha Street, Xuan Phuong District, Hanoi.

HRT – Green Breath for All Buildings.

Source: Publisher’s English edition · Vietnamese original on doanvanhoang.com