Building Ventilation: 7 Decisions to Avoid Waste

Machine-translated from Vietnamese. Read the original in Vietnamese

Building Ventilation: 7 Decisions to Avoid Waste
CEO Đoàn Văn Hoàng – HRT Share 7 ventilation building design decisions, help optimize flow rate, pressure control, save electricity and acceptance testing to the right technique.

Building Ventilation Design: 7 Decisions Before Choosing a Fan

Ventilation Buildings

An office building has just completed the central air conditioning system. The rooms are cool, the operation equipment is stable and the work is preparing for handover.

But when checking the conditions of use, the technical team detects problems that need clarification:

  • A crowded meeting room can feel stuffy.

  • The smell from the restroom area is at risk of spreading to the hallway.

  • Some areas receive insufficient outdoor air.

  • Ventilation fans run continuously even though the building uses only a fraction of its power.

  • Operations department does not have enough data to verify the flow rate design.

This is a hypothetical situation but reflects a real problem in HVAC design: Enough installation does not mean air quality can be controlled..

From an HRT executive perspective, I don't start the project with a question:

“How many fans does this project need?"

I'm asking the tech team to answer clearly:

  1. What areas should outdoor air be supplied to?

  2. Where do the sources of pollution have to be collected and discharged?

  3. How does the system work properly when usage density changes?

If you can't answer that, choosing a fan, calculating piping, and making an estimate are easy to make into an experience - based process of equipment selection rather than actual needs.

My point: Do not design ventilation according to the number of devices. Must design according to the capacity, air path and operation results to be achieved.

2. Why does the air conditioner run well but ventilation may still not reach?

This is the first thing project owners and operations units need to distinguish.

Air conditioning system has the function of handling the heat and humidity conditions of the air depending on the configuration of the equipment. Meanwhile, ventilation performs the task of bringing outdoor air in, organizing air flow and discharging air from the necessary areas.

An indoor VRV, VRF or FCU unit can circulate air in the room without directly replenishing outdoor air.

Therefore, it is not possible to take the circulating airflow rate of the indoor unit to confirm that the amount of outdoor air has met the requirements.

Four air currents must distinguish

Air flow

Functions

Outdoor air

Extra air from outside the building

Supply air

Bring air into the space in use, which can include outdoor air and circulating wind

Return air

Collects room air to treatment or circulation system

Exhaust air

Bringing air out of the building

 

A mechanical ventilation system can organize in series:

Outdoor air intake → Air purification and treatment → Feed fan → Network air duct → Room for use → Intake or forward route → Exhaust fan → Discharge position.

Depending on the construction, the equipment chain can be changed or combined with natural ventilation, ventilation heat recovery and central air conditioning system.

The important point is not how many devices are in the diagram but how controlled the airflow is.

3. Decision 1: Properly divide the ventilation area before calculation

The first mistake I want to avoid is using a general level - suction scheme for the entire building without considering the utility of each area.

A construction may simultaneously include:

  • Offices and meeting rooms.

  • Corridors, hallways and public spaces.

  • The toilets.

  • Technical dept.

  • Basement for parking.

  • Service or commercial areas.

  • Areas with specific heat sources and pollutants.

Each place has different number of users, operating time and operation conditions.

How HRT should be implemented

I require the ventilation partition table set up right from the base design stage.

Areas

Problems to control

Direction of evaluation

Meeting Room

Volatility density

Outdoor gas flow rate and demand-driven

Offices

Scheduled Use

Partition, adjust the flow rate

Toilet

Smell and moisture

Exhaust suction, air flow direction control

Basement Floor

Vehicle emissions

Mechanical ventilation and monitoring on request

Technical Department

Heat and equipment requirements

Ventilation or suitable dedicated cooling

Commercial area

Guest density varies

Regional and time control

 

For special rooms, specialized standards, technological requirements and separate regulations must be additionally examined.

HRT Decision

Do not switch to choose a fan if the function, use time, supply and suction needs of each area are not identified.

4. Decision 2: Determine flow rate by calculation basis, do not take a number for every room

One of the most important elements of ventilation design is determining flow rate.

But I don't want the engineer to just apply a formula and then be done with the design.

4.1. By number of persons

When the per capita method is suitable, a preliminary formula can be used:

\[ Q=N\times q \]

Where:

  • Q: Air flow rate, m3/h.

  • N: number of designers.

  • q: flow rate per person, m3/h.person.

Example illustration: A meeting room has 40 people and assumes the calculation rate is 25 m3/h. The flow rate according to the number of people is:

\[ Q=40\times25=1.000\ \text{m}^3/\text{h} \]

Value 25 m3/h.the user only illustrates the calculation, not the required design capacity for every meeting room. When actual design, also must determine the requirements of area, capacity, air quality and applicable standards.

4.2. Calculation by the number of air exchanges

For areas where ACH is appropriate:

\[ Q=V\times ACH \]

Where:

  • V: volume of space, m3.

  • ACH: number of air exchanges per hour, h−1.

In particular, it is necessary to distinguish the flow rate according to the number of gas exchanges from the outdoor air flow rate that needs to be supplied to the user.

These two quantities can serve different computational requirements.

4.3. Checking the flow rate balance

In addition to the level flow rate, it is necessary to consider:

  • Flow rate of suction and discharge.

  • The amount of air that passes between rooms.

  • Air compensates for local suction area.

  • desired differential pressure.

  • Affects air conditioning and moisture treatment.

HRT Decision

Each area must have the required calculation base table and flow rate confirmed before issuing the equipment selection dossier.

Without the right flow rate, selecting the right fan catalog may still be wrong design.

5. Decision 3: Determine the direction of air movement and pressure of each area

A ventilation system does not just need the right flow rate. The air must also move in the right direction.

Especially, in mixed-use buildings, if the level-to-suction relationship is not controlled, odors from the toilet, garbage or technical room may spread to the use space.

5.1. Control of positive pressure and negative pressure

I asked the design team to determine the desired pressure regime for each area.

Pressure Mode

Design objectives

Area example

Yang...

Restrict air from the ingress vicinity

Some rooms or areas to protect

Yin

Reduce odor and contaminants spread

Toilet, Garbage Room

Near Balance

Maintain gas exchange as required

Some commonly used areas

 

It is not possible to simply take the difference between the flow rate of the feed fan and the exhaust fan by default so that the room will reach the required pressure.

Differential pressure actually also depends on room airtightness, door opening, transition slot and relationship with adjacent areas.

5.2. Do not let supply air go off to the intake

If the feed door and inlet are not arranged properly, some air may leave the room without effective exchange with the use area.

So, we have to consider:

  • Position the feed door and inlet.

  • Blow direction.

  • Features of use of the room.

  • - Areas where people work and live.

  • Air relay.

  • Poor ventilation is possible.

5.3. Assess the air intake and exhaust position

Outdoor air intakes must be arranged appropriately, limiting the influence of sources such as vehicle exhaust gas, garbage gathering areas, kitchen waste suction or other exhaust mouths.

Do not let the air pollution that has just been discharged can easily return to the outdoor air supply system.

HRT Decision

Before issuing construction drawings, there must be an airflow organization diagram and a level-suction balance sheet for the relevant areas.

Not accept designs that only show the fan position without air movement orientation.

6. Decision 4: Choose the ventilation configuration that suits the building

I don't want the project team to assume that every building needs the same mechanical ventilation system.

The choice must stem from the conditions of use, architecture, climate and operation control capabilities.

Option 1 – natural ventilation

Use the impact of wind and temperature differences to create air exchange through designed ventilation doors and lines.

This can reduce the energy needs of your fan under favorable conditions.

However, the ability to control flow rates, dust, humidity and wind direction is highly dependent on the external environment.

Option 2 – mechanical ventilation

Use a feed fan, exhaust fan or a combination of the two.

The advantage is that it can actively organize flow rate, pressure and operation modes according to design requirements.

This is a plan that needs special evaluation for enclosed spaces, basements, technical rooms and areas difficult to organize natural ventilation.

Option 3 – mixed ventilation

Combines natural ventilation and mechanical ventilation, with well-defined conversion conditions.

However, it must be assessed whether the switching of mode affects humidity heat, pressure, and air quality.

Option 4 – ventilation with energy recovery

HRV/ERV systems can recover a portion of the energy between the exhaust air and the outdoor wind, depending on the equipment.

Further evaluation of recovery performance, pressure drop, filtration requirements, maintenance capacity and cross-leakage risks is needed.

Selection Orientation Table

Plans

Strengths

Things to evaluate

Naturally

Can reduce fan power

Depends on external conditions

Mechanical

Active flow rate and distribution

Fan power, noise level, maintenance

Mixed

Flexible according to the conditions of use

Logic Mode Switch

HRV/ERV

Capable of reducing external wind handling load

Energy efficiency and life-cycle cost

HRT Decision

Do not choose a solution based solely on the initial investment cost.

The plan should be evaluated according to operation efficiency, maintenance capability and total cost in the life cycle of the work.

7. Decision 5: Choose the fan according to the actual flow rate and pressure head

I consider this one of the points that has a direct effect on system efficiency.

A large flow rate fan on the catalog may not meet the required flow rate after installing it to the air duct network.

When operation, the fan must win pressure loss of the whole system, including:

  • Air intake and exhaust door.

  • Filters.

  • Straight pipe.

  • Co, quail, transition and branch.

  • Balancing valve.

  • Acoustic dimmer.

  • Air handling equipment.

  • Air terminal and other accessories.

Five parameters to control

1. Design flow rate: Determine by the needs of each area.

2. Pressure head requirement: Calculation from pipe network and related components.

3. Working place: Test on the actual performance curve of the fan.

4. Electrical performance and capacity: Consider at expected operation mode, not only at nominal conditions.

5. Noise level and adjustability: Suitable for the function and space used.

No automatic increase of fan power to solve all problems

If the system lacks flow rate, the cause may lie in:

  • Choose an inappropriate fan.

  • Pressure loss pipe network larger than expected.

  • The filter is obstructed.

  • Damper is not balanced.

  • Pipeline's cross sectional change.

  • Leakage of pipes or connections.

Increasing the fan speed without identifying the cause can increase noise, power, and other areas.

HRT Decision

Before approving the fan, the engineer must present the performance curve, working point and pressure loss calculation basis.

Do not choose fan by feeling. Do not take flow rate catalogue instead of calculation results.

8. Decision 6: Design controls to ventilation at the right time, the right need

A building may have properly designed ventilation but still consume a lot of electricity if the control strategy is not appropriate.

I don't want the system to operate at the same flow rate at all times when the power allows adjustments.

For example:

  • Meeting rooms sometimes empty, sometimes at full capacity.

  • Office space changes density on weekends.

  • The mall has peak and low hours.

  • Basements have media flow rates that change over time.

Solutions to be evaluated

Scheduled Control: Suitable for areas with defined operation time.

Variable-frequency drive: Allows adjustment of fan speed within the designed engineering range.

CO2 Sensor: Can support demand-driven ventilation at appropriate spaces, but not replace the requirement to control other sources of pollution.

Pressure sensor: Serve differential pressure control or pipeline pressure as needed.

BMS Connection: Helps monitor status, alerts and operation according to the building's strategy.

Three conditions must be latched before applying intelligent control

  1. Minimum flow rate must be maintained according to design requirements and applicable standards.

  2. The reduction of flow rate must not deprive the required pressure mode.

  3. The system must have a solution when sensors or control signals malfunction.

In particular, basement ventilation for daily operation and smoke control system when fire has different requirements. Not considered ventilation control strategy is often an automatic alternative to fire safety systems.

HRT Decision

Intelligent control must have operation logic, redundancy mode, monitoring signals and verification schemes.

Do not install sensors or BMS just to increase the number of devices in the quotation.

9. Decision 7: Establish acceptance testing criteria right from the design stage

This is the decision I want the project team to make before we start.

A ventilation system should not be handed over just because the fan is running and the air terminal has air.

We need to know:

  • Is the flow rate measured realistically satisfactory?

  • Is the room pressure mode suitable?

  • Does the system work according to the control logic?

  • Does the noise and vibration meet the requirements?

  • Are the damper and sensors working properly?

  • Can operation access maintenance locations?

9.1. Installation quality inspection

Need confirmation:

  • Position and direction of fan mount.

  • Mounting, anti-vibration and connection.

  • Dimensions, gland direction and pipeline airtightness.

  • Damper, air terminal and door visit.

  • Filters and processing equipment.

  • - Requirements related to fire safety.

9.2. Measurement and air balancing

TAB Work (Testing, Adjusting and Balancing) should be carried out to the extent required.

The results may include total flow rate, branch flow rate, air terminal flow rate, pressure and related operating parameters.

9.3. Control system inspection

Confirm:

  • Run and stop mode.

  • Fan speed or variable-frequency drive control.

  • Control valve status.

  • Sensor signal.

  • Interlock and alert.

  • BMS communication when available within the project scope.

HRT Decision

I require an acceptance testing criteria table from the design stage, stating each parameter to be measured, test method and acceptance criteria.

Do not wait until the handover date to find a way to prove the system is of quality.

10. Three quality checkpoint verification of HRT in ventilation project

From an executive perspective, I want each project to have three pauses to confirm quality before moving on to the next stage.

  1. Gate 1 – Before construction

    Functional latch, flow rate spreadsheet, level-suction balance, device position, fan working point, Shop Drawing and MEP coordination.

    Output: Technical documents approved.

  2. Gate 2 – Before closing ceiling and obstruction

    Check pipeline, airtightness, mounts, damper, thermal insulation, door visits, equipment links and access maintenance conditions.

    Output: The record of inspection of work before the obstruction.

  3. Port 3 – Before acceptance testing handover

    Confirm commissioning results, TAB, pressure, noise, control logic, as-built documentation and operation instructions.

    Output: Acceptance records have technical proof.

The principle I ask the project team to follow is: If you don't pass the test, don't move on.

11. Checklist HRT before signing acceptance testing ventilation system building

Pre-Delivery Control

0/14 items

Confirmed function and ventilation partition
Worksheet outdoor airflow, level and suction approved
Diagram of air movement direction to be tested
The position of intake and exhaust meets the design
Fan with suitable working point flow rate and pressure head
Piping, fittings, valves and air terminals tested
Correctly fitted air filters and treatment equipment
Sanitary and maintenance access conditions are guaranteed
Tested for rotation, vibration and noise
Completed measurement and balance flow rate as required
Differential pressure and gas flow direction meet requirement
Sensors, Interlocking and BMS Operate accordingly
Confirmed fire safety requirements within the relevant scope
Have as-built drawing, minutes and operation instructions
Reset Copy checklist

Checklist on the support work control, not replace the requirements acceptance testing own of the work.

12. Design standards ventilation buildings need to compare

As of November 2026, the important technical documents include:

Standards and Standards

Scope to consider

TCVN 5687:2024

Design requirements ventilation and air conditioning

TCVN 13521:2022

Parameters of indoor air quality

TCVN 13580:2023

Pipe Fabrication Requirements

TCVN 13581:2023

Piping installation requirements and acceptance testing system

ANSI/ASHRAE 62.1-2025

International documents on ventilation and indoor air quality are within the scope of application

 

TCVN 5687:2024 is still effective and replaced the 2010 version. The scope of standards is mainly for civil works; production spaces with their own technological processes must be considered according to appropriate specialized requirements.

Standard ventilation facilities must not be used to replace the specific requirements for smoke extraction when fire, ventilation technology or systems with special conditions.

13. Frequently Asked Questions about Building Ventilation Design

Does the building with central air conditioning need its own ventilation system?

It is necessary to determine whether the existing air conditioning system fully performs the function of external wind supply and exhaust as required. Many indoor unit systems only circulate air in the room.

What advantages does mechanical ventilation system have?

Ability to actively create flow rate and organize air flow, suitable for areas requiring ventilation control according to functions.

When should I choose an axial fan or centrifugal fan?

Depends on working point, performance, pressure drop, noise level and installation conditions. Can not be concluded solely based on the type of fan.

Is it possible to save electricity by reducing flow rate ventilation?

Adjustable when standards and operation conditions permit, but must maintain minimum ventilation requirements, pressure and related safety functions.

Is the CO2 sensor sufficient to assess air quality?

No. CO2 may assist in assessing and controlling ventilation in suitable applications, but does not adequately reflect dust, odor, VOCs or any source of contamination.

Is basement ventilation and smoke extraction fire protection the same?

No. Two functions may involve some equipment or space but must meet individual design, control and safety requirements.

When is acceptance testing of ventilation system?

When the installation, commissioning, inspection, balance and documentation within the project scope have been completed and meet the approved acceptance criteria.

14. Conclusion: The right design does not start from the fan catalog

From an HRT operator perspective, I do not want a ventilation system to be judged solely by the number of fans, the length of pipes or the engine power.

What I need to know is:

  • Is the outdoor air supply adequate and in place?

  • Have the sources of pollution been properly collected?

  • Is the pressure mode and air flow direction correct?

  • Is the system adjustable according to user needs?

  • Is there enough measurement data to prove the handover quality?

That's why I asked the project team to make seven decisions:

Right partition → Calculate the right flow rate → Control the air flow direction → Choose the right configuration → Select the right fan working point → Control according to the need → Pre-handover measurement.

A good ventilation system not only serves the needs of current use. It also needs to be convenient for maintenance, capable of controlling operation and avoiding energy waste throughout the life cycle of the building.

CEO perspective Đoàn Văn Hoàng | HRT:

Do not choose equipment when not yet understood the needs. Do not build when the design is not clear. Do not hand over when not yet proven results.

HRT – Right from the beginning – Clear to the end – Sustainable Green.

HRT – HVAC solution for all projects

HRT Air Conditioning and Ventilation Company Limited

Consulting – Design – Construction – Maintenance – Renovation of ventilation and air conditioning systems.

Hotline: 0909.326.888
Email: CEO@hrt.vn
Website: hrt.vn
Address: No. 4, Lane 6, Miao Nha Street, Xuan Phuong District, Hanoi.

HRT – Green Breath for All Buildings.