HVAC air leakage: six decisions to reduce waste
Machine-translated from Vietnamese. Read the original in Vietnamese

Air leakage HVAC causes energy waste, increase operation cost. CEO Đoàn Văn Hoàng – HRT share 6 decisions that help control losses and optimize performance.
HVAC air loss: 6 energy control decisions and operation costs

In HVAC system operation management, I am always interested in a problem:
Air conditioner is still running, fan is still working, but does the air being treated really get to where it needs to be used?
An air duct system can operate for years without being fully evaluated for airtightness.
No less works encountered some areas lack of wind, room temperature does not reach, high-speed fans or difficult to maintain design conditions.
These manifestations may be related to air leakage, but can also originate from imbalanced flow rate, pressure loss system, filter or control.
The problem is not finding every gap to seal at all costs.
From the perspective of HRT CEO, I asked the engineering team to answer three questions:
-
Where is the air loss and how much is it affecting the system?
-
Does processing really improve operational efficiency?
-
Is the cost commensurate with the results achieved?
To answer that clearly, I propose 6 technical management decisions help control HVAC air leakage, from status assessment to operation optimization after repair.
1. Decision to determine whether air leakage is the main cause
A room that's not cold enough to tell you the air duct is leaking.
This is the first rule I asked my engineering team to implement.
Distinguish air leakage from lack of flow rate
In an AHU, FCU system that connects an air duct or central ventilation system, the amount of air delivered to the area of use depends on many factors.
Equipment Group: The fan is not working at the right point, the speed is not suitable, or the filter is dusty.
Pipeline Group: Non-closed joints, pipeline deformation, wrong adjustment damper or increased pressure loss.
Control Group: BMS signal, pressure sensor or flow rate adjustment plan is not suitable.
Load Group: Actual use conditions change making the cooling demand greater than the design.
If these causes are not distinguished, disposal may incur costs without improving efficiency.
Prioritize operation proof
I request that the following parameters be checked directly:
| Parameter | Testing Purpose |
|---|---|
| Airflow Rate Head Power | Assess the wind supply capacity of the system |
| Airflow rate of branches | Identify abnormal distribution areas |
| Static pressure | Evaluate the operation condition of pipe network |
| Fan speed | Determine the operating status |
| Damper position | Testing of distribution conditions |
| Air Level Temperature | Support cooling efficiency evaluation |
Parameters must be recorded in the same operational conditions or with clear explanation of differences.
Decisions to be closed: Is there enough evidence that duct leakage is a significant cause or does it need to be checked for other factors first?
Output: Status report and list of causes to verify.
2. Decide on priority of pipelines that have a major impact on energy

I do not want to apply the same priority of repair to all gas leak locations.
A small gap in the low - pressure pipeline can have a different effect than a large leakage point in the high - pressure air supply pipe.
More importantly, the amount of air that goes into air-conditioned space or out of an area that does not require heat treatment also affects energy consequences.
Evaluate three important factors
Factor 1 – Leakage location
Air leakage at the acute route, return route and segments associated with the device should be distinguished.
On the positive pressure gland, air tends to escape through the gap. On the negative pressure gland, the air from the surroundings can be sucked in.
Factor 2 – Ambient Space Conditions
Air loss to the ceiling, roof or unconditioned space can have different consequences than if it escapes into the area still in the air conditioning area.
Factor 3 – Time of operation
A continuously operating system can accumulate significantly more energy impact than a system that runs only for short periods of time, even if the same instantaneous gas leakage level is present.
Processing Priority Matrix
| Situations | Direction of evaluation |
|---|---|
| Significant gas leakage on the main feed line | Prioritize the evaluation of flow rate, pressure and influence on multiple branches |
| Leakage at the return route through dusty environment | Further assessment of air quality risks |
| Leakage at a branch serves critical areas | Test the ability to maintain the use requirements |
| Small leaks in easily accessible areas | Evaluation of repair plans combined with maintenance schedule |
| Position dealt with but continued to recur | Check mechanical causes and operation conditions |
This matrix is used to orient the survey; the actual priority must still be based on the work requirements, safety and test data.
Decisions to be closed: Which pipeline needs pretreatment to reduce impact on performance and operation efficiency?
Output: List of priority positions with technical facilities.
3. Decide to quantify losses instead of just judging by feelings
This is a point of particular interest to me.
If the report only says “air duct leakage”, managers difficult to determine the severity and effectiveness of the treatment plan.
I want the data collable.
Distinguish acute flow rate and loss flow rate
When evaluating air duct systems, it is necessary to clearly understand the measurement range.
Flow rate at the fan is the amount of air that the fan transports through the measured position under specified conditions.
The flow rate at the air terminal reflects the amount of air reaching the area.
The difference between these values is not as automatic as the amount of gas leakage, as the result also depends on the pipe network structure, unmeasured branches, operational conditions and equipment errors.
To quantify leakage, appropriate testing methods must be selected.
When to try quantitative airtightness?
For the pipe segment that is required to check airtightness, the technician needs to determine:
-
Pipe segment range to be tested.
-
Design pressure level.
-
Pressure test is suitable.
-
Surface area or parameters required to allow evaluation.
-
leakage rate measured.
-
Criteria for acceptance according to project dossiers.
The test pressure is not arbitrarily selected or exceeds the allowable limit of the system.
The method can be referred to in the SMACNA HVAC Air Duct Leakage Test Manual and the standards and technical instructions applied to the work.
Determine the air leakage rate within the appropriate range
When quantitative measurement and corresponding reference flow rate data are available, a ratio can be used to support evaluation:
Reference air leakage rate (%) = measured leakage flow rate / reference flow rate × 100%
This ratio is significant only when the quantities are consistently defined and the conditions for comparison are clearly stated.
Do not use such ratio to replace the airtightness test criteria in the contract or standard conclusion if there is no ground.
Decisions to be closed: Is the data available to assess the extent of loss, or does an additional test need to be done?
Output: Report the quantity within the test range and the limits of measurement results.
4. Decision on selection of repair plan according to investment efficiency

After determining the extent of the impact, my next question was:
Should I do local repairs, pipe replacements or a combination of system renovations?
The choice can not be based solely on the cost of materials.
Distinguish three groups of options
Option 1 – Local repair
Applicable when damage concentrated at the joint, gasket or position can restore airtightness that pipe structure still meets requirements.
Accessibility, sealing materials and post-repair inspection should be assessed.
Option 2 – Replacement of pipe sections
Consider when the tube body is corroded, perforated, deformed, or structurally impaired to the point where local repair is no longer appropriate.
The replacement of pipe sections must ensure the size, material, structure and pressure level according to design requirements.
Option 3 – Simultaneous renovation of pipelines
Applicable when the air leakage incident is accompanied by other irrationalities of layout, pressure loss or accessibility to maintenance.
In this case, the full impact should be assessed before changing the system configuration.
Do not ignore the total cost
I would like to propose a technique that fully demonstrates the relevant costs:
| Cost Components | Content |
|---|---|
| Repairing materials | Gasket, sealing material, corrugated air duct, accessories |
| Labor force | Survey, repair, measurement and inspection |
| Access to location | Scaffolding, Forklift Or Open Ceiling |
| Interrupting operation | System downtime and impact on operation |
| Refunds | Thermal insulation, ceiling, finishing layer |
| Verify | Test airtightness, wind measurement and profile finishing |
Evaluate Energy Benefits With Caution
A fixed rate of power savings should not be committed solely to the area of the gap or visual inspection results.
The actual benefit depends on the fan characteristics, control, cooling load, leakage location, service life and the degree of loss that has been corrected.
If appropriate data is available, the cost of energy savings can be estimated according to:
Energy saving = Electricity before renovation – Electricity after renovation
The data must be standardized or adjusted according to the differences of load, weather, operation schedule and other influential factors.
With sufficient data, simple payback period can be referred to:
Payback period = Total investment cost / Annual net saving
This is a preliminary indicator, not replacing full financial analysis.
Decisions to be closed: Choose the option that meets the technical requirements, has reasonable cost and can be verified.
Output: Repair plan and cost comparison – expected benefits.
5. Decide to control the result after repair by operation data

At HRT, I don't want quality control to stop at sealed joints.
Photos are proof of work done.
But the operation results should be confirmed by appropriate methods.
Testing at two levels
Level 1 – airtightness of the pipe segment
Evaluate the corrected location and perform airtightness testing methods in accordance with project requirements.
If quantitative determination is required, test results must be compared with accepted criteria already agreed upon.
Level 2 – Wind Distribution Ability
After restoring operation, check the airflow rate in the relevant areas.
If repairs significantly alter the pressure or wind distribution, system recalibration should be considered.
Do not judge the effect only by the fan speed
Fan speed is not the only representative of energy efficiency.
With static pressure control system, when the pipe is better sealed, the controller can change the fan speed to maintain the set point.
With fixed speed fan system, the response of flow rate, pressure and power may be different.
Therefore, it is not assumed that reducing the air leakage will reduce the fan's power in the same proportion.
Comparison table before and after
| Category: | Pre-treatment | After treatment |
|---|---|---|
| Air leakage location | Record current status | Confirm status |
| Airflow rate | Actual measurement value | Measuring value after treatment |
| System Pressure | Measuring value and position | Measuring value and position |
| Fan Mode | Speed, control status | Speed, control status |
| Power Capacity | Record if there is measuring device | Re-measurement at the right conditions |
| Airtightness Results | According to the test if any | Check the acceptance criteria |
I require a report stating the operational conditions, measurement methods and differences between times.
Decisions to be closed: Is there enough evidence to confirm the system meets the requirements after repair?
Output: Testing records, parameter table before - after and acceptance testing conclusions.
6. Decide to put airtightness control into long-term operation plan
Fixing a leakage point only resolves the condition at the time of inspection.
If the cause is vibration, mounts, unstable joints or the impact of other renovations persists, the problem may reappear.
From an executive perspective, I want the system to be managed according to engineering history.
Data setting for each pipeline
A management profile should show:
-
Code of pipeline and service area.
-
Location of the gas leak.
-
The cause is known.
-
Treatment options.
-
Test results after repair.
-
The existence to monitor.
-
The person in charge and the time of the next inspection.
For hard-to-reach locations, consider the possibility of door arrangement or inspection options in appropriate renovations.
Controlling changes after renovation construction
Installation of additional electrical systems, firefighting, ceiling or substructures may affect the existing air duct.
If the system is drilled, cut, collided or the suspension rack changes, it is necessary to assess the risk of affecting the airtightness and structure.
I would like these changes to be noted before closing the ceiling or returning the premises.
Integrated into energy management plans
For frequent operation system, data of airflow rate, pressure, fan power and maintenance history can assist in abnormal detection.
However, an individual indicator should not be used to conclude a gas leak.
Trends should be assessed in conjunction with operation mode, load and other system changes.
Decisions to be closed: Develop a focused airtightness tracking plan, tied to HVAC operation and maintenance schedules.
Output: Pipeline management records and periodic inspection plans.
7. Five mistakes that keep HVAC operation costs up

From my experience in managing technical items, I want the team to avoid the following mistakes.
Mistake 1 – Accelerating the fan when the room insufficient airflow
Acceleration without identifying the cause may increase electricity costs, noise and change the working point of the system.
Actions: Check the entire distribution route before adjusting the fan.
Mistake 2 – Treat Every Gap By The Same Method
A leaked connection and a corroded pipe body are two different conditions.
Actions: Classification of damage, structural assessment before choosing repair materials.
Mistake 3 – Failure to evaluate operation conditions before fixing
Lack of initial parameters makes it difficult to determine the improvement effect.
Actions: Record parameters and related operation conditions before construction.
Mistake 4 – Only acceptance testing by observation
A closed - sighted joint does not mean the segment has reached a leakage level.
Actions: Apply inspection methods in accordance with the requirements of the work.
Mistake 5 – Failing to Recheck the Wind Distribution
After repair, flow rate at branches may change.
Actions: Recheck the system and air balancing as needed.
8. Three quality checkpoint HRT verification
For quality management and cost effectiveness, I propose three decision gates.
| Verification checkpoint | Content to confirm | Outputs |
|---|---|---|
| Gateway 1 – Before Investment | Causes, extent of impact, scope and plan | Survey Report and Repair Proposal |
| Port 2 – Before acceptance testing | Quality repair, airtightness results and operation conditions | Inspection record and measurement data |
| Port 3 – Before handover operation | Post-treatment parameters, existence, monitoring responsibility | Handover records and maintenance plan |
The principle I apply is:
Unexplained - Don't rush to correct.
No criteria – No satisfactory conclusions.
No data – No savings commitment.
9. HVAC air leakage FAQ
9.1. Does HVAC air loss increase electricity bills?
Possible. Treated air loss to an area that does not require supply may increase the need for operation. However, the actual level of impact depends on the leakage location, fan characteristics, cooling load and control mode.
9.2. Can the amount of leakage be determined by adding air terminals?
Measurement results at air terminals can support abnormal identification, but the difference from non-automatic power supply is the leakage flow rate. It is necessary to control the measurement range, error and related branches.
9.3. Does the small duct leakage need to be fixed immediately?
The impact, location, requirements and risk of damage should be assessed. Decisions should not be made solely on the size of the observed gap.
9.4. When should I replace the pipe instead of sealing?
When the structure is corroded, perforated or deformed to the extent that it no longer meets the requirements, it is necessary to evaluate the reinforcement or replacement. Sealing materials cannot replace the bearing function of the damaged structure.
9.5. Is air balancing mandatory after repairing air leaks?
Relevant areas should be rechecked. If the repair significantly changes the flow rate distribution, adjustments should be made according to design requirements.
9.6. Does air duct sealing help reduce fan speed?
In some pressure or flow rate control systems, loss reduction can facilitate a change in the fan working point. The result depends on the actual configuration and control method.
10. HRT – Energy Efficiency Management from Technical Details
For me, energy savings in HVAC do not start from the purchase of additional equipment.
Sometimes, it's important to first understand the state of the system in question.
An air duct that is not sealed, a damper that is misplaced, or an inappropriate control mode all need to be considered by data.
At HRT, we aim to achieve three core values:
YES
Assess the problem and identify a cause based on evidence.
CLINICAL
Each proposal must contain the scope, cost, criteria and verification results.
VISION
Focus on safe operation, reduce waste and maintain long-term system efficiency.
HRT provides solutions for design, construction, maintenance and renovation of HVAC systems, including:
-
Ventilation and air distribution system.
-
Central air conditioning system AHU/FCU.
-
Water Chiller.
-
Central air conditioner VRV/VRF.
-
Measure and balance airflow rate.
-
Renovation, optimal operation of electromechanical systems.
HRT – Green Breath for All Buildings.
11. Conclusion: Reduction of air leakage must accompany verifiable effect
A good air duct system is not only judged by whether the joints look sealed.
It is important that the system meets the design requirements, delivering the right flow rate and operation with reasonable energy use.
So I want the HRT team to maintain six actions:
-
Determine the right cause.
-
Prioritize the right locations of influence.
-
Measure the loss.
-
Choose a cost - effective option.
-
Verify the results after treatment.
-
Maintain tracking during operation.
Understand the right problem – Measure the right data – Deal with the right cause – Verify the right results.
That's how we want to bring real efficiency to every HVAC installation.
KS. Đoàn Văn Hoàng – CEO HRT
Right from the beginning – Clear to the end – Sustainable Green.
Website: https://hrt.com.vn/
Website CEO: https://doanvanhoang.com/
Hotline: 0909 326 888
Source: Publisher’s English edition · Vietnamese original on doanvanhoang.com