90-Day HVAC Power Reduction Plan: 5 Control Points
Machine-translated from Vietnamese. Read the original in Vietnamese

HVAC power savings require a verifiable implementation plan. CEO Đoàn Văn Hoàng – HRT sharing 5 control points in 90 days helps businesses identify waste, choose appropriate actions and manage effectively for a long time.
90 Day HVAC Power Reduction Plan: 5 Control Points to Optimize Operation Cost

HVAC power saving is not only a technology story. It is also an operation management problem, cost control and responsibility of those who directly manage the system.
When businesses set a goal to reduce the cost of electricity for their factories, hotels or office buildings, the question I'm interested in first is not what extra equipment to buy.
I would like to know:
-
Who is responsible for the electricity consumption of the HVAC system?
-
What data is being used to evaluate effectiveness?
-
What parameters does the operation department have the right to adjust?
-
What conditions are required to be maintained during the improvement process?
-
When the results come in, who confirms and who keeps on going?
If these questions are not answered, a power - saving plan despite technical basis still risks not being as effective as expected.
From my perspective, CEO Đoàn Văn Hoàng – HRT, with more than 20 years of experience in the field of HVAC, a power reduction program should be organized as an operational project with objectives, person in charge and acceptance testing criteria.
The 90-day plan below is the proposed implementation frameworkIt's not a commitment that every building can achieve a certain savings rate in three months.
The goal of the program is to establish a management base, select grounded changes, and create conditions for businesses to continue to improve long - term performance.
Control Point 1: Correctly identify responsibilities before setting power reduction targets
Day 1–10: Unification of the scope and non-negotiable conditions
In practice, energy management may be tasked with reducing electricity but not controlling the entire building's history.
For example, building management wants to adjust air conditioning running time. However, some tenants often work overtime.
If history is not consistent, the system can be adjusted several times, creating disagreements between the engineering team and the user.
At the factory, the change of cold supply time can also be directly related to production shifts, technological requirements and environmental conditions of each area.
Therefore, before approving the HVAC power saving target, I suggest that the project owner agree on three contents:
First – Scope of management: Evaluate the entire HVAC system or just an area, a cluster of Chillers or a group of VRV/VRF?
Second – Conditions of service: What requirements must temperature, humidity, ventilation, stability and service time meet?
Third – Decision-making power: Who is approved to adjust the running schedule, set temperature, control sequence or operation mode?
It is not recommended to delegate responsibility for electricity to an individual but not give them enough coordination to carry out the task.
Power saving KPI must go along with operation quality KPI
If only the kWh is used, the manager can focus on reducing the running time without fully assessing the impact on the work.
I think there should be at least two sets of targets.
Energy Efficiency Group:
-
Power consumption within the defined measurement range.
-
Electrical power over time.
-
The electricity amount corresponds to the volume of services provided.
-
Electricity cost according to the actual electricity price structure.
Operation condition group:
-
Temperature and humidity in critical areas.
-
The satisfaction of ventilation requirements.
-
Fault, stop and malfunction status.
-
The level of service time response.
-
The reflection is grounded from the user.
Reducing power but failing to maintain the agreed technical requirements shall not be considered as completion of objectives.
Control Point 2: Turn power data into action list

Day 11–30: Read data by system instead of just looking at invoices
A bill of electricity may indicate the total consumption of the building. But it does not itself indicate which portion of electricity is being used irrationally.
So I suggest the technical team to map the energy consumption associated with the actual HVAC configuration.
For chiller systems, it is necessary to determine whether the measurement boundary includes air conditioning, pumps, cooling tower and auxiliary equipment.
With VRV/VRF, it is necessary to distinguish the actual electrical data measured from the estimated information provided by the controller or monitoring software.
With AHU and ventilation systems, it is necessary to combine the electrical information of the fan with the operating status, flow rate, pressure and service requirements.
Not all buildings have auxiliary meters for each device. When there is a lack of data, I want the technical team to clearly record which parts have been measured, which parts can only be estimated and which parts are not sufficiently grounded.
A publicly available data gap is still worth more than a saving figure calculated from an unclear assumption.
Classification of signs to be investigated
Not every anomaly is synonymous with wasted electricity. They are signals for engineers to examine further.
Case 1: The night power is not reduced as expected
It is necessary to compare the load profile with the schedule, continuous cooling requirements, auxiliary systems and mandatory maintenance equipment.
Do not automatically conclude that the device running at night is unnecessary.
Case 2: High fan power but the area still lacks wind
Need to check the airway pressure loss, air filter, damper, fan characteristics and sensor accuracy.
If the cause is abnormal pressure loss, increasing the fan speed alone may increase power without addressing the root problem.
Case 3: Chiller operation but incompatible cluster efficiency
The actual cooling load, the sequence of running the machine, pump and cooling tower should be evaluated.
The kW/RT of the whole cluster may be useful if cooling capacity is reliably determined and power ranges are consistent.
I want the technical report to end with a priority problem list, not a statistical table.
Establishment of comparison conditions
During this period, the engineering team also needs to collect factors that affect consumption: weather, room occupancy rate, operating hours, production loads and functional changes.
According to the principle of Measurement & Verification (M&V), data before and after improvement must be brought to the appropriate comparative conditions when the factors affecting change.
This is also the content mentioned in
I do not hard-line that every 30 days of data is allowed to be conclusive. The measured period must represent the operation mode to be evaluated. For an all-year efficiency goal, longer data may be needed to consider seasonal variations.
Control Point 3: Each saving plan must have a trial plan and restoration plan
31–45: No mass changes without impact
One mistake in HVAC improvement is to make multiple adjustments at once.
Technical team change the running schedule, adjust the set temperature, correct the control algorithm and change the pump speed in the same period.
Then the power goes down.
But what factors produce results? Which solution does not work? Are there any adverse effects that are being obscured?
It's hard to answer without a good trial plan.
So I suggest that every important item has a test sheet that says:
-
Phenomena or problems to address.
-
Technical hypothesis and expected changes.
-
The scope of the affected area and equipment.
-
Monitoring indicators and conditions for testing termination.
-
Approval person, implementer and plan for restoring the previous status.
This is not an administrative procedure to supplement the dossier.
It is a way to protect the operational process when the business experiments with a new alternative.
Example applied to VRV/VRF system
A building has multiple use areas with different times.
Instead of changing the setting temperature in batches, the engineering team can select an appropriate area to assess the ability to manage the running schedule and partitions.
Before testing, it is necessary to check the central control mechanism, on-site adjustment authority, sensor status and overtime use requirements.
During the testing process, both electricity and comfort conditions must be monitored.
If valid reflections appear or parameters exceed the agreed limit, adjustments should be considered or restored.
Example applied to Chiller system
With a cluster of chillers with many machines, the technical team can evaluate the order of equipment mobilization according to actual load.
However, changing the sequence of running the machine must consider the minimum capacity, load adjustment capability, water flow rate, heat exchange conditions and operation limits of the manufacturer.
If there is any change related to pumping or cooling tower, it must be determined the effect on the efficiency of the whole cluster.
It is not recommended to see a device's power decrease and then automatically conclude the system has saved.
Examples apply to AHU and ventilation
An AHU can operate on a fixed schedule even when regional usage levels vary significantly.
This is a situation worth evaluating, but it does not mean that you can cut your airflow rate arbitrarily.
It is necessary to check the external wind requirements, regional pressure, humidity, air quality, technology requirements and control system limits.
With cleanroom, areas with pressure requirements or specific spaces, safety conditions and utilities must be prioritized before energy targets.
I asked the engineering team to prove that the operation was still a viable option before considering it a cost - effective solution.
Control Point 4: Verify the result by data, not acceptance testing by feeling
Day 46–75: Performance and related impact testing
There is a sentence I do not want to see in the acceptance testing report:
"The unit's working fine, the power seems to have dropped."
For an HVAC power saving program, the results must be aligned with agreed criteria before implementation.
For example, if the goal is to improve Chiller cluster efficiency, the report should show the power consumption within the measurement range, the corresponding cooling load and the influential operational conditions.
If the goal is to control VRV/VRF runtime, it must demonstrate that the new operation schedule meets actual demand without interrupting areas to be served.
If the goal is to improve the fan system, both the power and the ability to maintain the required flow rate and pressure should be checked.
Distinguish three results in the report
Technical Result: Does the adjustment item work properly with functions, control sequence and allowable limits?
Energy Result: How much does the power change in the agreed range and conditions of comparison?
Economic results: How does the actual electricity cost change after considering the tariff, maximum capacity when relevant and the cost of implementing the solution?
These three results are related but not identical.
A plan that can reduce power but does not provide adequate payback.
In contrast, an adjustment may improve operational stability but not yet produce a large enough savings for separate verification.
I want the results to be reflective of what they are rather than trying to put every benefit in a percentage.
Commissioning proof check
For changes affecting the control sequence, functional verification should be carried out to the agreed extent.
ASHRAE Guideline 36 provides high performance control sequences for HVAC system groups within the scope of the guideline, to support energy efficiency, stability and fault detection.
This is a useful source of reference when evaluating control strategies, but cannot be applied to every existing HVAC configuration.
I am particularly interested in testing state switching situations: start, stop, low load operation, demand changes and warning processing.
One system may work well at one time but not be stable in other modes.
Therefore, acceptance testing must be based on the scope of the test and appropriate evidence, not just a BMS screenshot.
Control point 5: Hand over operation method to maintain efficiency after 90 days
Day 76–90: Standardizing results into routine work
An optimal HVAC project is not truly complete if after several months, all parameters are returned to the old operational way without technical reasons.
This is why I consider handovers as important as testing.
After a change is approved, the relevant documents should be updated:
-
The operation sequence has been approved.
-
List of settings parameters and allowable limits.
-
Decentralize parameter changes.
-
Guidelines for handling when warnings arise.
-
Schedule regular checkups.
-
The method continues to monitor energy efficiency.
The operations team must know when to adjust, where to get approval and what data to save.
Organize a post-improvement review calendar
I propose setting up three levels of tracking.
Shift or Day: Operations personnel check for warnings, abnormal states and critical parameters.
By Week: The engineer in charge looks at power trends, performance and changes in demand.
By Month: The manager compares the results with objectives, actual conditions and operational costs to make further decisions.
Frequency can be adjusted according to the scale, characteristics of the work and capacity of the monitoring system.
It is important that the report leads to specific action. If the abnormal parameter repeats for weeks but there is no person responsible for processing, then the data collection has not created administrative value.
Consider investing in equipment on a life cycle basis
After the operational optimization stage, some buildings may still need large renovation investment.
HRT then proposes evaluation of new equipment or solutions based on load capacity, investment cost, expected power, maintenance, reliability, downtime and integration.
The decision may be to upgrade the controls, renovate the wind/water distribution or replace part or all of the equipment.
There is no requirement that the 90 - day program necessarily end with a new machine purchase contract.
The HVAC Power Management KPI Table that I would like to see after the improvement
Instead of a long, hard - to - decide report, the board needed a dashboard that could be read quickly and retrieve the original data.
| Following Team | Recommended Index | Request an evaluation |
|---|---|---|
| Electrical Power | kWh within HVAC range | Compare according to corresponding conditions |
| Performance | kW/RT of whole Chiller cluster, if sufficient measurement data | Determination of cooling load and measurement boundaries |
| Quality of service | Temperature, humidity, ventilation requirements | Compare the criteria of the project |
| Reliability and reliability | Incidents, warnings and interruptions | Specify the cause and treatment |
| Maintain results | Number of parameter changes, deviation from the approved configuration | Have logs and approvers |
| Financial efficiency | Cost saved and deployment cost | Data usage, transparent assumptions |
The thresholds for reaching or failing to reach must be set separately for each project. The above table does not replace design documentation, M&V plan or acceptance testing criteria of contracts.
Three types of constructions need three different ways of power reduction management

Office Buildings: Focus on Demand Fluctuation
For offices, air conditioning needs may vary between workdays, weekends and areas with different usage rates.
I will ask for the actual schedule, overtime operation areas and coordination mechanism with the tenant.
A good solution does not necessarily mean reducing the running time of the entire building. Better zoning may be needed so that people remain in service while unused areas are managed appropriately.
The results must be checked by electricity and the service quality of the concerned areas.
Factory: Electricity saving must not increase production risk
For the factory, cooling load is not only related to the number of personnel.
Machinery, lines, exhaust, humidity and technology requirements can decide the HVAC operation mode.
If changing a system affects multiple lines, I want HVAC manufacturing, maintenance and engineering to agree on a solution.
In this case, the priority is not only to reduce kWh but also the ability to maintain technological conditions and avoid interruptions.
A plan that generates small electricity savings but increases the risk of stopping the line is not necessarily an economical option.
Hotels and Resorts: Balancing Energy with Customer Experience
The hotel has a significant difference between bedrooms, lobby, restaurants, conference rooms and service areas.
Cooling capacity requirement can vary drastically according to the number of guests, event schedule and weather conditions.
I will prioritize reviewing the coordination between booking schedule, actual usage and air conditioning mode within the system's allowable scope.
But electricity saving should be avoided to make the receiving room unconvenient or the spaces with humidity control requirements are inappropriate operation.
Energy efficiency must support service quality, not go against the business objectives of the hotel.
CEO's view Đoàn Văn Hoàng: I want to reduce costs by operational discipline, not slogans.
In my work running HRT, I always appreciate technical suggestions that can be translated into concrete action.
One engineer reported that the system needed to be optimized was not enough.
I want to know where the best fit is, what the outcomes are, who did it and what evidence is used to confirm it.
A manager who proposes to invest in new equipment also needs to clarify which problems existing equipment can not reasonably solve.
I looked at an HVAC power management program through three responsibilities:
Understand Correctly: Do not rush to choose technology when you do not understand the needs of use, system configuration and practical problems.
Clear: Each task shall have a person in charge, scope of implementation, evaluation criteria and verification dossier.
Dedicated: Responsibility is not ended at the time of handover. Efficiency should be monitored during the work continues to operate.
I think the success of a reduction program is more than just numbers that appear in the final report.
Success is also reflected in the fact that the business understands its system better, the operations team has greater control and subsequent investment decisions are more reliable.
For me, sustainable energy savings have to come from everyday management.
Frequently Asked Questions When Planning to Reduce HVAC Power
Is it compulsory to install separate electric meters for each device?
Not in every case. The measurement plan depends on the scope of improvement, the required accuracy and the ability to exploit existing data.
However, if one wants to verify the effectiveness of a separate item, an appropriate measurement and evaluation method is required. A secondary meter may be a solution, but not the only option.
Is a 90-day plan enough to confirm year-round electricity savings?
Not necessarily.
90 days may be appropriate for organizing surveys, testing and establishing management mechanisms. But if cooling load varies greatly with the season, short-term data is not sure enough to represent the whole year's efficiency.
When annually evaluating electricity saving, the weather conditions, use demands and extrapolation or measurement methods must be considered.
Should we set a percentage goal for saving electricity in the first place?
An expectation level can be set for planning, but it is necessary to distinguish governance goals from proven savings.
I do not recommend committing to a fixed rate without information on the current status and conditions of measurement.
Is BMS mandatory in HVAC power management program?
Not required for all sizes.
A small system can use meters, independent measuring devices and operation logs accordingly.
For large buildings with multiple equipment and use zones, a BMS or energy monitoring system can support data collection and control management more effectively, if designed, configured and operated properly.
Who needs to participate in the confirmation of results?
Depending on the scope of the project, it may include representatives of the project owner, technical management board, operation unit, contractor and user of the work.
The parties should agree on the method of measurement, acceptance testing conditions and handling responsibilities that exist before deployment.
HRT accompanies enterprises to build optimal HVAC operation plans
For commercial and industrial projects, HRT orients its approach to energy saving from actual operation conditions.
HRT items that can be coordinated for consultancy and deployment according to the agreed scope include:
-
Survey the current status and evaluate HVAC operation.
-
Test power data, load and specifications.
-
Evaluate the operation Chiller, VRV/VRF, AHU/FCU.
-
Review of control systems and BMS.
-
Propose the renovation and upgrade of equipment when there are technical bases.
-
Plan the test, commissioning and verification of results.
-
Support to build operation management process after improvement.
Each construction has different conditions, so the specific plan should be determined after the survey.
Businesses can refer to more articles Energy Saving HVAC: An Efficient Power Saving Solution to find out an overview of the technical solution groups.
Conclusion: 90 days to establish a responsible HVAC power management platform
If I were to be assigned to build a HVAC reduction program, I wouldn't start by asking engineers to immediately give me a rate of savings.
I'm going to ask for a plan that expresses five points of control:
-
Determine your scope and responsibilities.
-
Have data to identify the actual problem.
-
Testing changes according to the approved plan.
-
Verify efficiency and operation conditions.
-
Hand over management methods to maintain results.
After 90 days, it is unlikely that every project has met its financial goals. But a properly organized program needs to help businesses have a better basis to know what has improved, what has not and how to take further action.
CEO Đoàn Văn Hoàng – HRT
More than 20 years of experience in the field of Heat – Cold – HVAC Technology.
HRT Air Conditioning and Ventilation Company Limited
-
Website: https://hrt.com.vn
-
Hotline: 0909.326.888
-
Email: CEO@hrt.com.vn
-
Message: Green Breath for All Buildings
Post Tags: HVAC power reduction plan, HVAC power management, HVAC operation optimization, HVAC energy KPI, power cost control, commissioning HVAC, Chiller system operation, VRV VRF management, BMS system, energy efficiency measurement, CEO Đoàn Văn Hoàng, HRT
Source: Publisher’s English edition · Vietnamese original on doanvanhoang.com