CEO Đoàn Văn Hoàng – HRT sharing how to evaluate HVAC efficiency based on power, cooling load and actual use conditions. The article helps project owners identify savings opportunities, verify results and reduce electricity without compromising operation quality.

HVAC efficiency evaluation: Reduce power but not reduce operation quality

HVAC Efficiency Assessment

In a hypothetical meeting, the technical manager reported: “This month, air conditioning power has dropped by 10%."

That's a lot to consider. But before I can acknowledge the results, I'll ask: is the construction working as it did last month? Has the number of users changed? Are the areas still fully served or are there places that have to accept hotter?

A drop in the number might start the exchange. It shouldn't be the end of the evaluation.

Evaluation of HVAC efficiency should consider energy consumption and the ability to meet the actual needs of the building. The goal of operational optimization is to adjust the system to cooling and ventilation needs, while maintaining proper use conditions. This is also an approach mentioned by the U.S. Department of Energy's FEMP energy management program in building operational adjustment. 

From the perspective of operating HRT, I want the savings results to be answered by both sides: the business has reduced some electricity and the user continues to receive agreed quality service or not.

Do not let the target reduce power blurring the task of the system

HVAC efficiency

Before delivering the savings target, I suggest that the project owner confirm the HVAC conditions to be maintained.

For offices, it may be temperature, humidity, ventilation and service hours for each area. For factories, it is necessary to clarify the environmental conditions that the production process requires. These contents must be recorded as a basis for evaluation, not for each party to understand in a way.

I disagree with the fact that the savings report was completed while the crowded meeting room was no longer served as required. Nor should it be taken good results at an area to represent places that have not been tested.

In the HVAC testing manual, the U.S. Department of Energy recommends comparing operating schedules and settings with usage needs, and confirming that the system provides adequate ventilation. Energy efficiency testing should therefore be accompanied by functional testing, not just reading meters.

The operator needs to know what limits are not traded

When submitting a modification plan, the engineering team must explain which parts are allowed to change and what conditions to keep.

If shortening runtime is proposed, confirm when the building should be in service. If temperature changes are proposed, clarify affected areas and how to check after adjustment.

I want to have a way to revert back to the previous mode if the test does not meet the requirements. The implementer must also know who has the right to decide whether to maintain or stop the change.

Reducing power is the goal. Serving the right needs is still a responsibility to keep.

The number must be read in the same section as the work that HVAC did

The meter indicates the electricity used. The portion of electricity saved is not a quantity that can be read directly on a meter; it is determined through comparison with energy usage as a basis. This comparison always has assumptions and uncertainties to be considered. 

So I want the power report to go with the information about how the building works.

A month with fewer guests, a reduced shift workshop or more favorable weather all need to be noted when evaluating the results. FEMP's building-level verification method considers variables such as weather, usage, load and operational conditions to adjust baseline consumption before comparison. 

An example of why we need to modify the comparison

Assumed example, not HRT project data: Last month's HVAC power was 120,000 kWh, the next month it was 108,000 kWh. Looking directly, the decrease was 12,000 kWh, equivalent to 10%.

However, next month there is more favorable weather and fewer users. Assuming the base model has been tested shows: with these new conditions, the previous system renovation is expected to consume only 112,000 kWh.

Then, the estimated savings associated with the solution are:

112.000 − 108.000 = 4.000 kWh, equivalent to approximately 3,6% compared with the adjusted baseline level.

The remaining difference should not be automatically recognized as the result of a technical solution.

This example doesn't mean that every project needs a complex model. What it does mean is to choose the right comparison and explain how the data was processed.

I also asked to distinguish objective changes from the impact of the solution itself. It was one thing to have fewer visitors; another to eliminate extra running time with the operation schedule adjustment. The correction should not be in a way that would erase the improvements the alternative was proving.

I want to know where the electricity drops come from, instead of just how much it's going to be.

Want to know where the electricity is going, don't just look at compressor

HVAC

When I look at the Chiller report, I often ask for a diagram of the system next to the power panel.

Is the electrical part being calculated including chilled-water pump, condenser water pump and tower fan? If the report extends to the entire HVAC system, where are the AHU's electrical, FCU's and related ventilation systems located?

These questions determine the scope of conclusions. It is not recommended to write “system-wide efficiency” when the new data reflects only one device.

ASHRAE analyzed that optimal refrigeration stations involve trade-offs between components. For example, increasing airflow rate through the tower may reduce Chiller power by condenser cooler water, but at the same time increase tower fan power. The results should be assessed on the total power of the equipment involved.

A device that uses less power may not make a better station.

From that principle, I do not want the project team to stop at reporting “pump speed reduced” or “compressor load reduced”

Show how the system is changed after the intervention. Is the power saving in one device accompanied by an increase in another? Have the cold use areas been tested?

If the solution impacts multiple components, the measurement range should be sufficient to see those interactions.

With VRV / VRF, I also suggest to clarify what devices the meter is recording. If you are measuring outdoor units, call the correct name of that range. Do not consider this as the entire electricity and ventilation of the building.

This clarity should be agreed before implementation. When acceptance testing is the time to argue about the electrical calculation scope, both the project owner and the implementing unit are difficult to evaluate fairly.

Good indicators only make sense when the input data is reliable

In the report, I want to separate the question of how much electricity is used from the question of refrigeration efficiency.

kWh reflects the amount of electricity consumed over a period of time. For chillers, kW/TR reflects the amount per unit cooling capacity under the condition in question. An individual performance indicator does not replace the total electricity output of the entire operational period.

To evaluate the actual kW/TR, the corresponding actual cooling capacity data is required. No nominal capacity is taken from the label to represent all times.

NIST's research on performance assessment of power plants emphasizes the need to measure electrical capacity, flow rate and temperature with appropriate accuracy. Chiller performance also varies according to evaporation conditions, condensation and compressor load levels. 

Before conclude the machine is inefficient, check the measurement

I suggest the techs verify the source of the data before analyzing it.

Is the meter measuring the correct device to be evaluated? Are the electrical, flow rate and temperature values in the same time range? How has the missing data been processed?

A value displayed on the BMS should be traced to the measurement point or method. If it is an estimate, specify it, rather than presenting it as a direct measurement.

With the system not qualified for determining cooling capacity, I want to report the conclusion limit. It is possible to monitor power and use conditions to find abnormal signs, but it is not recommended to publish the actual COP when the data is not enough.

Catalogue supports selection, not replacement of operation results

The published parameters are still valid, but should be used for the right purpose.

Trane notes IPLV is built from specified load points and conditions; this indicator is not designed to directly predict the annual power of a Chiller in any particular building. 

So when I get a machine replacement, I want to see the connection between the equipment characteristics and how the building actually works.

What loads will the machine work at? How many hours will it serve? How is the auxiliary equipment organized? What assumptions are the expected portion of electricity saved based on?

A nice number needs to be translated into a valid alternative, before it becomes a confirmed result.

Finding things to fix before finding equipment to buy

As electricity costs rise, I don't want the meeting to start with a new machine catalog.

I want the project team to open the operation schedule, alert data and maintenance records first. Then let's go check what the data is suggesting.

ENERGY STAR notes that equipment can still be well maintained but consumes unnecessary electricity due to inappropriate running schedules or control strategies. Installations that serve a temporary need may also be retained if left unchecked. 

Suppose an area used to overtime, but after returning to normal working hours, the air conditioning schedule has not been updated. In that situation, I will ask to verify the actual demand before considering an investment solution.

If control problems are detected, clarify input signals and equipment status. If heat exchanger capability is suspected, specify the corresponding test. If replacement is proposed, demonstrate the limitation that maintenance or operation adjustment cannot resolve.

I don't assume that a low-cost solution is always better. What to avoid is choosing the solution first and then finding a reason to protect that choice.

A test requires clear questions

Instead of adjusting multiple parameters at once, I suggest that each test cycle has a scope that is clear enough to evaluate.

The engineering team should state the abnormality being dealt with, the expected changes and the results to be observed. When equipment is forced to adjust synchronously, consider it as a master plan and record the entire change.

If the service requirements are not met, do not switch to wide deployment just because electricity has decreased. If the data is not sufficient, keep the conclusion at the testing level and determine the part that needs further verification.

A useful experiment doesn't just create new numbers; it has to help people in charge decide what to do next.

Put acceptance testing in the proposal, not to the end of the table

Before browsing an optimal category, I want to know how the result will be confirmed.

This should be done right from the survey. FEMP emphasizes the importance of recording facility conditions before intervention, because after the solution is installed, full re-generation of the original state is often not feasible. 

In the proposal, I ask for an explanation of the scope of measurement, the time of data collection, how to handle changes in the work and the person responsible for confirmation. Contents that cannot be directly measured must be presented with the assumption of use.

Energy saving and money saving should be presented separately

I would like to report the kWh reduction off the cash conversion.

If the plan adjusts the timing of electricity use, it is necessary to clarify the benefits from reduced consumption or changes in structure over time. Meter data can assist in assessing the distribution of demand and selecting an appropriate cost plan; these two contents should not be lumped into a “efficiency increase" ratio. 

When comparing investments, I want to see both the cost of deployment, measurement and the operational work that arises. The assumption of electricity price or lifetime must lie next to the calculation result, so that the approver understands the conditions of the plan.

The results are not sufficiently certain to be properly stated

Measurement errors, usage fluctuations and calculation assumptions can all affect the estimated savings. Measurement and verification aims to control uncertainty at an appropriate level, not eliminate it altogether. 

So I don't want a small difference to be presented as a sure result when the report hasn't been reliably evaluated.

The conclusion should reflect the data: what is the scope of confirmation, what are the limits and what additional conditions need to be monitored.

Nor should it be self-expanding the results of a short test drive into a commitment for the whole year. In my proposal, the measured part and the forecasted part must be clearly distinguished.

The savings are only of long-term value when the operator keeps

After acceptance testing, I want the operation team to receive a way to maintain the results, not just a summary report.

They need to know which settings have changed, why and what conditions are in place. When demand is different, who is adjusted? Where should the engineer be consulted? What data should be reviewed to evaluate efficiency?

Energy information management systems can assist in comparing actual consumption with projected patterns, detecting signs of savings portion decline and assigning problems to persons in charge of handling. However, tools should be tied to specific operation processes and responsibilities. 

In the way I propose, each anomaly must be translated into a head of work.

Do not stop at the message "Electricity increases” Please determine to what extent the increase, the conditions of use have changed or not and what to check. After processing, the work head is closed only when the results have been compared.

When the work changes its function or adds a large load, I want the person in charge to review the evaluation basis. Do not continue to use an old goal without explaining how well it is still suitable.

Tracking boards are valuable when helping an operation team take action, not when there are only multiple charts.

CEO's view Đoàn Văn Hoàng: I approve service outcomes, not just power drop figures

When viewing a plan HVAC efficiency assessmentI want to see the connection between data, solutions and the needs of the building.

The data must indicate the working condition of the system. The solution must address a verified problem. The result must be checked to a scope clear enough for the project owner to understand what he is getting.

If the report shows a decrease in power but has not confirmed service quality, I will ask for clarification of the missing part. If the equipment has good parameters but the plan has not explained how to operate, I have not considered it as a sufficient basis for investment.

That's how I apply the spirit True – Clear – Dedicated: understand the reasons for consumption, clarify responsibilities and monitor the effectiveness after implementation.

I don't aim to make a month with better bills at all costs.

I want the business to have control over why the system is powered, know what it's worth doing, and have the evidence to keep making the right choices.

Reduce unnecessary electrical parts. Keep the quality works needed. Prove the result before successful recognition.

Discuss with HRT about HVAC operation efficiency

At the beginning of the survey, project owners should prepare current power data, building history, equipment catalog and problems. If there is a BMS, add running schedule data, settings parameters and recent changes.

Not having enough separate meters should also be recorded from the beginning. From that status, the parties can agree on the survey scope and data collection plan before setting saving targets.

Contact HRT: 0909 326 888. hrt.com.vn

CEO Đoàn Văn Hoàng | HRT
Right from the beginning – Clear to the end – Sustainable Green.

Source: Publisher’s English edition · Vietnamese original on doanvanhoang.com