Factory HVAC: Air Conditioning - Ventilation - Effective Exhaust
Machine-translated from Vietnamese. Read the original in Vietnamese

Integrated HVAC Solution for HRT Factory Air conditioning – ventilation – exhaust – outdoor air – wind compensation, help optimize the production environment, save energy and operate sustainably.
Factory HVAC is not just cooling problem
In many factories, the first question is often: “How much air conditioning capacity does this factory need?"
But for an industrial HVAC system, this is not the most important question.
Before choosing Chiller, VRV / VRF, Packaged or Rooftop, it is necessary to determine exactly what the factory is experiencing: high temperature, large humidity, lack of outdoor air, heat accumulation, dust, odor, heat or pressure imbalance.
A system HVAC Factory efficiency must simultaneously address many factors:
Temperature → Humidity → ventilation → outdoor air → Exhaust → Wind compensation → Air quality → Energy operation.
That is also why industrial HVAC design needs to start from the actual survey instead of choosing equipment in advance.
1. Three core problems of HVAC factory
A factory doesn't usually need a single system.
Depending on the production capacity, HVAC can be a combination of air conditioning, ventilation and exhaust.
Factory air conditioning – when temperature control is needed
Air conditioners are used in areas where temperature or relative humidity is required.
This can be a production area, control room, electrical room, server room, quality inspection room, specific material warehouse or office inside the factory.
Commonly considered systems include:
VRV/VRF – Water Chiller – AHU – PAU – FCU – Packaged – Rooftop.
There is no one system that works best for every building.
Choices must be based on cooling load, operation time, workshop size, partition capacity, redundancy requirements and life-cycle cost.
Workshop ventilation – when heat release and air exchange are needed
Not every factory needs full cooling.
In many cases, properly designed ventilation systems can effectively solve the accumulation of heat and stagnant air.
The important point is not to install a lot of fans, but to create Reasonable path of air flow.
Air must be brought in the right place, passed through the area to be treated, and sucked out at the right location.
If the airflow is not adequate, a fan with a high flow rate may still be inefficient.
Factory waste suction – pollution treatment at source
Areas that produce dust, smoke, odor, heat, oil vapors, or moisture should be evaluated separately.
In many cases, the most effective solution is collected at the source of generation instead of letting the contaminant spread to the entire factory and then treating it.
Suction cups, mouthpieces, suction pipes and exhaust fans should be designed based on the source characteristics.
The principle is simple:
The earlier the source of contamination is controlled, the better the flow rate can be optimized.
2. outdoor air and wind compensation – parts that are easy to forget
A powerful exhaust system will constantly bring air out of the workshop.
But that air must be replenished.
If only increasing the exhaust fan capacity without calculating enough wind compensation, the factory may fall into a state of large negative pressure.
When this happens, hot air, dust or odors from outside and adjacent areas can be drawn in through doors, cracks or other undesirable locations.
The actual flow rate of the fan may also be far from calculated.
So, in HVAC design:
Exhaust and wind compensation must be considered as a pair of problems.
For air conditioning areas, the amount of outdoor air added also creates thermal load and moisture load for the system, especially in hot and humid climates in Vietnam.
3. Why can not calculate the factory air conditioning only by m2?
One common mistake is to take the area of a factory and multiply it by a fixed power factor.
This may be appropriate for some initial estimation steps but should not be used in designing industrial systems.
The two factories have the same area but the cooling load can be very different.
Another 5 m high workshop is completely another 12 m high workshop. Another almost no heat generator workshop is completely a continuous operating line workshop.
HVAC loads need to take into account simultaneously roof and wall structure, space height, solar radiation, machinery, people, lighting, outdoor air, operation time and production line characteristics.
So, you know, Cooling load must be designed from actual data of the building.
4. HVAC partition helps reduce investment and operation power
A factory usually has a lot of areas with different requirements.
Offices may need constant air conditioning. Production areas may only need local cooling. Larger heat generating units may require heat suction. Warehouses may only require ventilation. Server rooms need constant air conditioner and have backup plans.
If all areas are treated under the same conditions, the system is very susceptible to overinvestment.
Partitioning helps project owner to specify:
Which area needs air conditioning – which area needs ventilation – which area needs exhaust – which area needs tighter temperature and humidity control.
This is one of the most important steps to optimize HVAC factory.
5. Mistakes that make HVAC systems costly but still inefficient
In fact, there are projects that have invested large capacity but the internal environment is still unsatisfactory.
The cause is often not the device itself but the whole design and organization of the system.

Errors to be especially avoided include: selecting the air conditioning capacity only by area; installing exhaust fans but not counting the wind compensation; focusing cooling that ignores dust, odor and heat; placing the suction point too far from the source of arising; and laying equipment without enough maintenance space.
A good HVAC design must take into account the post-delivery operation period.
AHU, FCU, PAU, fan and other equipment need enough space to clean coil, remove filter, test motor, valve, belt and condensate system.
It's not enough to be assembled - it's necessary to be maintained.
6. How does HVAC factory save energy?
Energy savings don't start with buying the most expensive appliance or having the highest performance rating.

Partitioning instead of cooling the whole
The area that does not require temperature control is not necessarily air-conditioned like the main production area.
Reducing the volume to be processed means reducing cooling load and operation costs.
Heat suction right at the site of arising
If the machinery generates a large amount of heat, direct heat at the source can be much more effective than increasing the air conditioning capacity for the entire workshop.
HVAC control according to actual load
Fan, pump, and air conditioning units don't always need to be running at 100% power.
Variable-frequency drive, sensor and control system can be used to adjust according to temperature, pressure, production schedule or actual load.
Reduces losses on air duct systems
Air duct is too small, multiple diversion segments or unreasonable layout increase pressure loss.
The fan must work more to maintain the required flow rate.
Proper design of pipe size, wind velocity and pressure drop makes the system work more efficiently.
Maintenance to keep performance
Filtering dirty, dirty coil, slack belts, fan imbalance or pipe leakage all increase energy consumption.
HVAC is energy efficient so not only the design story but also the manage the system throughout its life cycle.
7. Choose Chiller, VRV/VRF or Packaged for factory?
This is a common question HRT asks when project owners start projects.
But choosing equipment should be a step after having identified the technical requirements.
Water Chiller
Chillers are often considered in projects with large cooling loads, long-term operation or need centralized cold water conditioning systems combining AHU, PAU and FCU.
VRV/VRF
VRV/VRF has the advantage of flexible partitioning, especially in office areas, functional rooms or areas with suitable loads.
Packaged and Rooftop
Packaged or Rooftop systems can be suitable for some factories that need an integrated industrial air conditioning solution, depending on the building characteristics.
The most important point is still:
Do not choose technology before understanding the right load and power.
8. HVAC deployment process at HRT
HRT approaches the project in a direction from actual needs to long-term operation.

The overall process includes:
Survey → Analysis → Design → Separation → Quotation → Construction → TAB/Commissioning → Handover → Warranty → Maintenance.
Survey and data collection
HRT surveys premises, height, structure, production line, machinery, number of personnel, operation time, heat source, dust, odor, humidity and existing HVAC system.
Analysis of each area requirements
From survey data, the project was divided into zones with specific requirements on air conditioning, outdoor air, ventilation, exhaust, air purification and pressure.
Calculation and design
Engineers perform cooling load, airflow rate, pipeline, air duct calculation and select AHU, PAU, FCU, Chiller, VRV/VRF, Packaged or Rooftop depending on each project.
Extraction and optimization
The plan is not only evaluated according to the investment price.
HRT considers simultaneously:
Investment cost + Technical efficiency + Electricity cost + Maintenance capability + Scalability.
Construction and MEP coordination
HVAC must be closely coordinated with electricity, fire protection, water supply and drainage, structure, architecture and production lines.
The processing of intersections right from shopdrawing helps limit arising in construction.
TAB and Commissioning
After installation, the system should be measured and calibrated.
Airflow rate, water flow rate, pressure, temperature and control mode must be checked under actual operation conditions.
Correct drawings do not mean correct operation.
Warranty and maintenance
After handover, the system needs to be maintained periodically to keep performance, air quality, stability and equipment life.
9. When should I renovate the factory HVAC system?
It's not always necessary to replace an entire system that isn't working properly.
A factory should be re-examined when local heating, constant air conditioning running but not reaching the temperature, dust or odor accumulation, exhaust fan inefficient, differential pressure is large, electricity costs increase abnormally or the production line has changed compared to the original design.
In many cases, the solution may be to simply re-adjust:
Supply air → return air → outdoor air → exhaust → Wind compensation → Control → TAB.
Correct repairs can be more effective than simply replacing the equipment in an inadequate manner.
10. GREEN HVAC for long term industrial building
The factory is the type of construction with very long operation time.
The initial HVAC investment is only part of the total cost.
Electricity, maintenance, repair and replacement of equipment in 10–20 years is the problem that needs project owner's attention.
So orientation ESG Standard GREEN HVAC not merely using energy-efficient equipment.
It's the process of:
Proper design → Standard construction → Reasonable control → easy maintenance → Optimized continuous power.
HRT aims to HVAC solution based on three values:
Understand - Clear - Dedicated.
Understand the needs before choosing equipment. Clear from design, volume to responsibility. Dedicated in the construction process, operation and long-term companionship.
Source: Publisher’s English edition · Vietnamese original on doanvanhoang.com