Design outdoor air systems according to the right technique with 7 important decisions on flow rate, humidity treatment, fan selection and acceptance testing according to experience CEO Đoàn Văn Hoàng – HRT.
Outdoor Air System Design: 7 Decisions Not to Do By Feelings

An outdoor air system may have enough fans, enough pipes and enough air terminals but the building still appears to be a blocked room, high humidity, odor moving in the wrong direction or flow rate is not really up to design.
From an HRT operator perspective, I do not start with the question:
“How much power should I choose a fan?"
I asked the engineering team to answer three questions first:
- Where is the outdoor air coming from?
- How much is it going to take into each area?
- Where will the air be returned, transferred or released after entering the room?
When these three questions are unclear, choosing a fan and implementing a piping is only about handling the tops.
A correct outdoor air supply system must simultaneously control flow rate, inlet air quality, thermal load, moisture load, pressure head, noise level, room pressure and post-construction measurement capability.
1. Outdoor air system is not just installing one more fan

Outdoor air systems are meant to bring a controlled amount of outdoor air into the space in use.
Depending on the construction requirements, this airflow can pass through:
Outdoor air intake → screen → filter → damp heat treatment device → fan → pipeline → air terminal → use space.
The point is to clarify. Outdoor air does not mean the whole supply of air conditioning system.
| Glossary | Understanding in design |
|---|---|
| Outdoor air | Air taken directly from the external environment |
| Supply air | Air is brought into the room, which may include outdoor wind and circulating wind |
| Return air | Air collected from the room for further circulation or processing |
| Exhaust air | Air is taken out of the building |
An AHU can deliver thousands of cubic meters of air per hour, but most of it can still be return air. Therefore, the engineer must determine the amount of outdoor air to be added separately, not taking the total flow rate of the AHU or FCU in place of outdoor airflow.
2. Decision 1: Determine the right demand before calculating flow rate

I don't agree with the idea of taking a fixed number and applying it to every room.
Working rooms, meeting rooms, hotels, malls and factories have:
- People are different densities.
- Different usage time.
- Sources of odor and various pollutants.
- Different room pressure requirements.
- Different applicable standards.
At the preliminary calculation by number of people, flow rate can be expressed as:
Q = N × q
Where:
- Q: outdoor airflow, m³/h.
- N: number of users.
- q: Outdoor air capacity per person, m3/h.person.
But this is just one component of the problem.
The final design may also take into account room size, utility, air distribution efficiency, actual occupancy density, operation time and the requirements of the project standards.
How to make HRT request
Before issuing drawings, each area must have a calculation basis table including:
- Room name and function.
- Area of use.
- Number of designers.
- Operation schedule.
- Outdoor airflow requirement.
- related discharge flow rate.
- Desired pressure mode.
- Standards or design tasks are applied.
Without a clear basis for calculation, do not proceed to the step of selecting the device.
3. Decision 2: Choose the right outdoor air intake location

The intake is the starting point of the whole system.
A wrong location can cause the system to return dust, odor, smoke or the air that was emitted back to the building.
When surveying, I require a minimum check:
- Distance to toilet flush, kitchen and technical room.
- Areas where vehicles frequently stop, park or start.
- Source of dust, smoke, odor and ambient emissions.
- Main wind direction and air recirculation conditions.
- Installation pitch of the air intake.
- Risk of rain sneeze or surface water intrusion.
- Accessibility to clean louver and screen.
Don't decide on a spot just because it's easier to place a fan or convenient to pipe.
Favorable for construction but detrimental to air quality is still the wrong option.
4. Decision 3: Include moisture load, not just look at temperature
This is a point I particularly note for the work in Vietnam.
Outdoor air in hot humid conditions not only carries heat. It also carries an amount of steam which can create significant hidden loads for the air conditioning system.
If direct supply of a large amount of humid air into the room without assessment of air status, the building may experience:
- The humidity in the room is rising.
- Surface of air terminal or pipeline appear condensation.
- Indoor unit have to work more.
- Difficulty maintaining comfortable conditions.
- Moisture and the risk of mold increase.
- Power consumption is higher than expected.
So, engineers should not only compare outdoor and indoor dry temperature. It is necessary to consider simultaneously the humidity, dew point, enthalpy, external airflow rate and the ability to handle hidden loads of the equipment.
Three questions to close
- Is outdoor wind delivered directly into the room?
- Does the existing indoor unit handle the extra load?
- Do I need to use a cold coil, DX rig, dehumidifier or dedicated external wind treatment system?
Bringing air into the room is not a complete task. That air must be in a state consistent with the operation objectives of the work.
5. Decision 4: Choose the right outdoor air system configuration

There is not a suitable configuration for every project. I usually ask the design team to compare at least four directions of solutions.
5.1. Direct outdoor air
Outdoor air is filtered and brought into the room by fans and piping.
Suitable for:
- Requires no complicated moist heat treatment.
- outside airflow rate is not large.
- The main air conditioning system is also capable of handling additional loads.
- The project needs simple solutions.
Risks to be controlled:
- Thermal load and moisture load increase.
- Condensation.
- The humidity in the room is difficult to stabilize.
- Operation power increases.
5.2. ventilation heat recovery HRV or ERV
Two streams of gas feed and exhaust exchange energy through the heat recovery unit.
HRV is primarily heat recovery current. ERV can exchange both heat and a portion of moisture-related energy, depending on the device configuration.
This solution can partially reduce the load of external wind treatment, but must include:
- Pressure drop through device.
- Performance under actual operational conditions.
- Risk of cross leakage.
- Ability to clean the exchanger.
- Cost of filter replacement and maintenance.
5.3. Outdoor air with moisture heat treatment
Outdoor air is cooled, dehumidified or heated before entering the space in use.
Solution can use:
- Coil cold water.
- Indoor unit DX.
- Dehumidifying equipment.
- Specialized external wind treatment equipment.
This is a direction to consider when buildings have clear humidity control requirements.
5.4. DOAS system
DOAS is a dedicated outdoor air handling system that works in conjunction with VRV, VRF, FCU or primary air conditioning systems.
DOAS helps to separate the tasks:
- External wind system controls ventilation and hidden load.
- Air conditioning in the room handles the rest of the load.
However, the division of loads between systems must be calculated synchronously. It is not recommended to pair equipment empirically without a moist heat balance sheet.
6. Decision 5: Choose the fan according to the actual working point
One common mistake is to choose a fan based solely on the flow rate listed in the catalog.
The fan does not work under the condition of no pressure loss. When put into the system, it must win the pressure drop through:
- Louver and screen.
- Clean filter and filter after a period of use.
- Straight pipe.
- Co, quit and the transition.
- Adjustable valve.
- Acoustic dimmer.
- Heat recovery device.
- Coil handle.
- Air terminal and terminal accessories.
So the fan must be checked at Working points including flow rate and pressure head.
I require the fan selection to show
- Flow rate design.
- Total pressure loss calculation.
- Working points on the performance curve.
- Fan performance.
- Engine power.
- Noise level.
- Speed adjustment options.
- Prophylaxis when filter pressure loss increases.
- Accessibility conditions maintenance.
Choosing a fan that is too large can cause noise, power consumption and difficulty balancing. Choosing a Fan that lacks pressure head makes the actual flow rate not reach even though the device is still running.
7. Decision 6: Design pipeline same room pressure mode

Ductwork is not just about connecting fans to air terminals.
The design must simultaneously address:
- Air velocity.
- Pressure drop.
- Noise level.
- Airtightness pipeline.
- Installation space.
- Ability to calibrate.
- Sanitary and maintenance conditions.
- Thermal insulation and vapor barrier layer.
- Coordinate with structure, electricity, water and fire protection.
Level and suction must be counted together
The level flow rate and suction decide the pressure mode of each area.
For example:
- Space that needs to limit dust ingress can be held positive pressure.
- Toilets, garbage rooms, or other areas that smell are often controlled with negative pressure.
- Corridors, restrooms, technical rooms and toilets must be coordinated so that air moves in the right direction.
Cannot take a level-to-suction ratio and apply it to every room.
Condensation control
When the surface of pipe or equipment has a temperature lower than the dew point of the medium, moisture can condense.
Therefore, it is necessary to control:
- The thickness of the insulating material.
- The continuity of the vapor barrier layer.
- Connections and locations through walls.
- Surface damper, door visit and accessories.
- The tube passages through the hot and humid area.
A small gap in the vapor barrier can also become a point of deposition during operation.
8. Decision 7: No acceptance testing by eye – must measure and balance
Fan running does not mean the system has reached.
Air terminal has air flow does not mean the flow rate is correct.
I require acceptance testing of outdoor air systems based on measurements, not on the feeling of standing under the air terminal.
The inspection and balancing work may include:
- Measure total outdoor air flow rate.
- Measure the flow rate at each branch.
- Measured at important air terminals.
- Check the balancing valve status.
- Check the rotation and fan speed.
- Check differential pressure through the filter.
- Check the temperature and humidity.
- Check the differential pressure between rooms.
- Noise and vibration should be recorded as needed.
- Finish the parameter table after calibration.
CO2, temperature, humidity or differential pressure sensors can provide control on demand. However, they are not a substitute for determining minimum flow rates and verifying systems after construction.
HRT principle: Do not sign because the device has already run. Sign only when the system has been measured and proved satisfactory.
9. Orientation for selection of each type of works

The table below is for initial orientation only. The final plan must still be based on calculations and design tasks of each project.
| Type of construction | Priority issues | Solution direction to be evaluated |
|---|---|---|
| Offices | The density of people changes, the meeting room is not used continuously | Scheduled control, CO2, variable-frequency drive and regional balance |
| Hotel Location | Humidity, odor and differential pressure between restrooms, corridors, toilets | Coordination of feeding – suction, moisture treatment and energy recovery |
| Business Center | Large flow rate, variable density of people | Partitioning, demand control and monitoring via BMS |
| Factory Building | Distinguish Comfortable Ventilation from Technological Ventilation | Survey of emission sources, local suction and separate gas treatment |
| Luxury Villas | Closed space, quiet and aesthetic requirements | ERV, noise control, filtration and matching air terminal layout |
| Rooms with special requirements | Control pressure, cleanliness or humidity | Specialized processing system, differential pressure measurement and continuous monitoring |
For factories with production processes that generate dust, gas or steam, the outdoor air supply system cannot automatically replace the local suction system and technological exhaust treatment.
10. Six signs that outdoor air systems need to be rechecked
1. Room remains airtight even though the air conditioner is running
The cause may come from lack of external wind, irregular distribution or a system that only circulates the air in the room.
2. Odor from toilet or auxiliary area spreads to clean space
Check suction-level balance, air transition and pressure mode.
3. Doors are difficult to open or frequently close strongly by themselves
This may be a sign of differential pressure between areas that are not suitable.
4. air terminal, ceiling or pipeline appearance stagnant
External wind status, dew point, thermal insulation, vapor barrier and dehumidification should be checked.
5. Noiseless fan but air terminal end of line is still weak
It is possible that the system is experiencing a large pressure loss, selecting the wrong fan at work or unbalanced flow rate.
6. Large flow rate difference between rooms
Check the balancing valve, pipe branch size, pipe pressure loss and TAB result.
11. Three verification checkpoints HRT when deploying outdoor air system

Gate 1 – Design Control
Before construction, the latch must be:
- Base flow rate calculation.
- Level – Suction Balance Table.
- Pressure mode for each area.
- Thermal load and moisture load due to external wind.
- Configure air handling.
- The working point of the fan.
- Control and BMS requirements.
Gate 2 – Installation control
In the course of construction, inspection must be conducted:
- Position the airlock.
- Airtightness and direction of pipe gland.
- Supportive and anti-vibration pillow.
- Thermal insulation, vapor barrier layer.
- Balancing valve position.
- Door visit and space maintenance.
- Dimensional fitting of filters, sensors and processing equipment.
Gate 3 – Handover control
Before signing acceptance testing must have:
- Flow rate table.
- Systemic balance results.
- Operating parameters fan.
- Differential pressure through the filter.
- The results of checking room temperature, humidity and pressure as needed.
- As-built drawing.
- Instructions for operation and maintenance.
- Mold filter replacement, cleaning and periodic inspection.
12. Checklist acceptance testing outdoor air system
Before signing, the person in charge should confirm the following:
- total flow rate has been measured.
- Flow rate of each area is satisfactory.
- The location of the air intake is not near the source of pollution.
- The fan works in the right direction and at the right speed.
- Filters are of the right type, sealed and replaceable.
- Balancing valve has been adjusted and marked.
- The system does not vibrate or generate abnormal noise.
- Thermal insulation and vapor barrier layer are not exposed.
- The direction of air movement between rooms is correctly designed.
- Sensors and interlocking controls work properly.
- - Having dossiers on measurement and checking and post - calibration parameters.
- There are operation instructions, cleaning and filter change.
13. Standards to be compared in design
As of November 2026, the documents to be considered include:
- TCVN 5687:2024: Ventilation and air conditioning – Design requirements. This standard is still valid and replaces TCVN 5687:2010.
- TCVN 13521:2022: Housing and public houses – Indoor air quality parameters.
- TCVN 13580:2023: Ventilation and air conditioning – Requires pipeline fabrication.
- TCVN 13581:2023: Ventilation and air conditioning – Requirements for piping installation and acceptance testing systems.
- ANSI/ASHRAE Standard 62.1-2025: International references on ventilation and indoor air quality for works within the scope of application.
Each project must clearly define the set of standards, regulations and contract requirements that are actually applicable. In particular, it is not recommended to use the standard ventilation facilities to replace the specific requirements of the production process or specific technology area.
14. Frequently Asked Questions
Does the outdoor air system have cooling room?
None of the above. The system only brings outdoor air into the building. To control temperature and humidity, appropriate treatment equipment or coordination with air conditioning systems is required.
Is it possible to provide as much outdoor air as possible?
No. Lack of level can cause space obstruction, but excess level increases thermal load, moisture load, fan power and operation power.
Can CO2 sensors be used to fully control the system?
CO2 sensors are useful with some occupied spaces, but do not adequately reflect dust, odor, VOCs or any other source of contamination. The system must still maintain the minimum ventilation requirements as designed.
Where do HRV and ERV differ?
HRV is mainly heat recovery current. ERV can exchange additional part of the energy related to humidity, depending on the configuration and operation conditions of the device.
When should we consider DOAS?
DOAS is suitable when the building needs to clearly control external wind, hidden loads or humidity and wants to separate the task of handling outdoor air from the room air conditioning system.
Is air balancing mandatory after construction?
This is a very important step to confirm the actual flow rate at each branch and air terminal. Without measurement, there is not enough grounds to conclude that the system has reached the design.
Conclusion: Inputting the wind is not enough - it must control the whole system
The outdoor air system design does not start from the fan catalog and also does not end when the equipment is powered.
A satisfactory system must demonstrate:
Correct flow rate → Correct air quality → Correct thermal load humidity → Correct pressure → Correct working point → Correct acceptance testing data.
From the perspective of HRT operator, I asked the project team to clarify each decision right from the design stage. Because the cost of fixing a pipeline, adding moisture treatment or changing fans after the construction is completed is always much greater than the cost calculated correctly from the beginning.
HRT – Right from the beginning – Clear to the end – Sustainable Green.
HRT Air Conditioning and Ventilation Company Limited
Hotline: 0909.326.888
Email: CEO@hrt.vn
HRT – Green Breath for All Buildings
Source: Publisher’s English edition · Vietnamese original on doanvanhoang.com