HVAC Commercial Center
Machine-translated from Vietnamese. Read the original in Vietnamese

Commercial center HVAC needs to be designed synchronously from Chiller, AHU, FCU, PAU to outdoor air, IAQ, exhaust suction and BMS to ensure comfort, energy saving and sustainable operation.
Commercial center HVAC: the problem of both comfort and operation
A shopping mall does not operate as a regular office building.
In the same building may exist:
- The grand hall.
- Retail booths.
- Supermarket.
- Amusement park.
- The cinema.
- The restaurant.
- Food court.
- The toilets.
- Kho.
- Technical dept.
- Electrical room.
- Server room.
Each area has different cooling load, occupancy density, operation time and air quality requirements.
In particular, the commercial center's HVAC load is constantly variable according to:
Time frame → weekdays → number of guests → rental capacity → weather conditions.
So, the design of commercial center HVAC can not stop only at choosing a large enough Chiller.
The system should be considered synchronous:
Refrigeration source → air treatment → wind distribution → outdoor air → exhaust suction → IAQ → control → operation.
Three Core Goals of Commercial Center HVAC
A good HVAC system needs to balance three goals simultaneously.
Comfort for customers
Customers need to feel:
- Cool enough.
- No direct wind blowing.
- The air is not squashed.
- No unpleasant smell.
- The right humidity.
- The temperature is relatively uniform.
A business center with a high-capacity chiller but poor wind distribution may still present the condition:
Subcooling – overheating – crowded areas get squashed.
Suitable environment for rental
The tenant has very different characteristics.
A fashion store cannot be counted as loading like:
- The restaurant.
- Supermarket.
- Electronics.
- The gym.
- Amusement park.
- The cinema.
HVAC so need to be able to partitioning and control by function.
Reasonable operation cost
HVAC is often one of the most significant energy consumption systems of commercial buildings.
Therefore, efficiency is not only evaluated by:
“Is it cold enough or not?"
but also equal to:
“How much energy does it cost to create that level of comfort?"
Commercial Center HVAC System Structure

For large and medium - sized projects, HVAC systems are often made up of multiple layers of equipment that work together.
Chiller generates central cold source
Chiller generates cold water and supplies it to the terminal such as:
- AHU.
- FCU.
- PAU.
- Coil Heat Exchanger.
Depending on the project conditions, it is possible to use:
- Air-cooled chiller.
- Water-cooled chiller.
With water-cooled chillers, the system often also has:
- Cooling Tower.
- Chilled-water pump.
- Condenser water pump.
- Van.
- Pipeline.
- Controller.
- Sensors.
Therefore, when evaluating the effectiveness should not only look at the Chiller itself.
Need to consider the whole:
Chiller Plant = Chiller + Pump + Cooling Tower + Piping + Valve + Control.
AHUs bring cooling capacity to the space
If the Chiller is the source of refrigeration, then the AHU is one of the devices that determines the ability to process and distribute air.
AHUs usually serve:
- Central hall.
- The hallway.
- Large retail space.
- High airflow rate area.
- The space needs to be treated with concentrated temperature and humidity.
Air Handling Chain can visualize:
Air intake → Air purification → Mixing outdoor air → cooling/dehumidifying → Fan supply → Air duct system.
An incorrect AHU operation can reduce system efficiency even though the Chiller is still operating normally.
The issues to be examined include:
- Air filter.
- Coil.
- Fan.
- Flow rate.
- Pressure.
- Cold water valve.
- Water temperature.
- Temperature supply air.
- Damper.
- Sensors.
- Clean the inside of the AHU.
FCU makes partition more flexible
FCUs are often located in relatively independent control areas such as:
- Rented space.
- Management desk.
- The study.
- Some function rooms.
- Auxiliary area.
The advantage of a reasonable partitioning is that the building does not have to operate the entire HVAC in a single mode.
Low - occupancy areas can be reduced while crowded areas are maintained in comfortable conditions.
PAU outdoor air treatment before granting to the building
In hot humid climates, outdoor air carries both:
- Sensible heat.
- Latent heat.
- It's a little damp.
- Dust.
- Pollution from the environment.
If large amounts of outdoor air are introduced directly into an air conditioned area without proper treatment, the HVAC load can increase significantly.
PAU can be used to treat outdoor air before it is supplied to the building.
This is an important link when the mall has:
- Adult density.
- High IAQ requirements.
- The need for humidity control.
- Long operation time.
IAQ determines the quality of the experience inside the building
IAQ – Indoor Air Quality – is indoor air quality.
An area of 24°C does not necessarily create a good environment.
Customers can still feel:
- Secret.
- Heavy air.
- Smells.
- Too wet.
- Discomfort in large numbers.
So modern HVAC needs to control both temperature and air quality.
Factors affecting IAQ
IAQ is directly related to:
- Outdoor air.
- CO₂.
- Dust.
- Fine grain.
- Moisture.
- Smells.
- Filtration system.
- Suctioning waste.
- Clean the AHU.
- Clean your air ducts.
- Sources of pollution in the building.
It's easy to see:
IAQ = outdoor air + Air purification + Humidity control + Exhaust + Pollution source control + maintenance.
Outdoor air must vary with density of use
The number of people in the mall is not constant.
Weekday mornings and weekend evenings can create two completely different operation conditions.
Areas of large load fluctuations usually include:
- Food court.
- The cinema.
- Amusement park.
- Event hall.
- Supermarket.
- Waiting area.
In suitable projects, the following may be considered:
- CO2 sensor.
- Damper controls.
- Variable-frequency drive.
- BMS.
- Demand Controlled Ventilation.
The goal is to:
Provides enough outdoor air when crowded but not excess when low load.
This both supports IAQ and reduces the outdoor air handling load.
Food court should be considered as a special HVAC zone
F&B areas are often one of the hardest areas of the mall.
Here simultaneously appear:
- Heat from the stove.
- It's a little hot.
- It's a little damp.
- Smoke.
- Smells.
- Grease.
- High density.
- Large discharge flow rate.
If you increase the air conditioning capacity without addressing the wind problem, you may still develop odor and pressure imbalances.
Suction must be accompanied by wind compensation
A principle that should be especially noted:
The air intake should be calculated with the amount of air compensation.
If the kitchen suction system is too large but lacks compensation level:
Negative pressure increases → air is pulled from the vicinity → odor spreads → cooling load increases.
Therefore, F&B area should coordinate:
Exhaust Air + Make-up Air + Air Conditioner + Pressure + Air Flow Direction.
Why do malls have hot and cold?
This is a common situation in works that have been operating for many years or have changed their functions.
The reason is not necessarily a lack of Chiller power.
Can be derived from:
- Water flow rate is not enough.
- Airflow rate is not enough.
- Filter dirt.
- Dirty coil.
- Fault control valve.
- Bad sensor.
- Air duct leakage.
- Water balance is not good.
- Air balancing is not good.
- Tenant changes function.
- Load the booster device.
- The control logic is not right.
So, before adding air conditioning need:
Measurement → cause analysis → offer solution.
Don't go emotionally.
HVAC Partitioning by Behavior of Use
An efficient mall should not operate the entire building from a single setpoint.
Lobby and public areas
Characteristics:
- Big space.
- High ceilings.
- Guests are coming in and out.
- Large ingress load.
Shopping malls
Depends on:
- Booth type.
- Illuminate.
- Equipment.
- Guest density.
- Opening time.
Khu F&B
Need Control:
- Heat.
- It's a little damp.
- Outdoor air.
- Suctioning waste.
- Smells.
- Pressure.
Technical and server department
May need:
- Independent cooling.
- Works 24/7.
- Equipment backup.
- Private Alarm.
The correct partitioning the more likely the system is to:
Running the right area – at the right time – the right load.
8 directions optimized HVAC power commercial center

1. Correct cooling load calculation
Don't oversize your device just to feel safe.
Oversize can result in:
- CAPEX rises.
- Running low loads for extended periods.
- Difficult control.
- Actual performance is not optimal.
2. Control partition
Different spaces need different operation modes.
3. Optimize the whole Chiller Plant
Not only Chiller test but also need to check:
- Pump.
- Cooling Tower.
- ΔT.
- Flow rate.
- Setpoint.
- Load part.
- Logic staging.
4. Apply variable-frequency drive in the right position
VFD can be considered for:
- Pump water.
- AHU fans.
- Cooling Tower fan.
- Other suitable equipment.
5. Adjust outdoor air according to demand
Outdoor air should be sufficient for IAQ but should not be surplus at all times.
6. Maintain a clean AHU
Filter dirty and coil dirty can:
- Increased pressure loss.
- Reduce flow rate.
- Reduce heat exchange.
- IAQ effects.
- Increase fan power.
7. Implement TAB
TAB – Testing, Adjusting & Balancing helps to test:
- Water flow rate.
- Airflow rate.
- Balance the system.
- Actual parameters compared to the design.
8. Data Management
Parameters should be monitored instead of sensory operation.
May include:
- The temperature.
- Moisture.
- CO₂.
- ΔT.
- Pressure.
- Flow rate.
- Equipment capacity.
- Alarm.
- Power consumption.
BMS helps HVAC operation according to actual load
For large scale business centers, BMS can become the critical control layer between equipment and operation team.
BMS can track:
- Chiller.
- Pump.
- Cooling Tower.
- AHU.
- FCU.
- PAU.
- The temperature.
- Moisture.
- CO₂.
- Pressure.
- Alarm.
- Operation schedule.
The greatest value lies not only in “seeing the device is ON or OFF”
More important is the ability to respond:
How many loads is the device running?
Why is the electricity rising?
What zone is cold short?
Which AHU is showing abnormalities?
Which area is providing outdoor air beyond the necessary?
Good data is the foundation for long-term operational optimization.
When to renovate commercial center HVAC?
Project owner or management should consider in-depth survey when meeting signs such as:
- Electricity costs rise but the number of visitors does not increase proportionally.
- Low load running chiller lasts long.
- Some areas do not reach temperature.
- There is subcooling area.
- High humidity.
- Condensation.
- Smells.
- Customers feel confused.
- Tenant is frequently reflective.
- AHU degrades.
- Old control system.
- Many tenant have changed their functions.
- The system has been in operation for years.
- Works need IAQ upgrade.
In many cases, a proper renovation doesn't mean a complete replacement of the equipment.
Solution can be focused on:
- Balance.
- Controls.
- Van.
- Sensors.
- VFD.
- AHU.
- Pipeline.
- Air duct.
- Outdoor air.
- BMS.
Commercial center HVAC deployment process at HRT
HRT implements projects in series:
Surveying → Analysis → Designing → Separation → Construction → TAB/Commissioning → Handover → Maintenance & Optimization
Step 1 – Survey the current status and requirements
HRT collects data such as:
- Area.
- Functional.
- Human density.
- Operation timeframe.
- HVAC system is present.
- Load the device.
- Tenant.
- Khu F&B.
- Require IAQ.
- Technical space.
The goal is to... understand the correct construction before choosing equipment.
Step 2 – Load analysis by zone
Do not just calculate total cooling load.
Need to analyze according to:
- Floor.
- Area.
- Timeframe.
- Functional.
- Human density.
- Degree of use.
This is an important basis for avoiding oversize and mispartitioning.
Step 3 – Selecting your HVAC configuration
Depending on the project can consider:
- Water Chiller.
- VRV/VRF.
- AHU.
- FCU.
- PAU.
- Packaged.
- Rooftop.
- HRV/ERV.
- Air purification.
- Ventilation.
- Suctioning waste.
- BMS.
There is no one configuration that is suitable for every mall.
Step 4 – Synchronous Design
Design needs coordination:
Cooling load + water + wind + power + control + IAQ + maintenance.
Includes:
- Chilled-water system.
- Pipeline.
- Air duct.
- Outdoor air.
- Suctioning waste.
- Electrodynamics.
- Controls.
- Space maintenance equipment.
Step 5 – Separating and constructing
HRT aims to the principle:
Clear device – Clear volume – Clear range – Clear responsibility.
This helps limit the amount of time you spend on your schedule and increases your ability to control your progress.
Step 6 – TAB and Commissioning
The device “runs" does not mean the system “runs properly”
TAB and Commissioning need to check by data:
- Water flow rate.
- Airflow rate.
- Pressure.
- The temperature.
- ΔT.
- Logic controls.
- Ability to respond to loads.
Step 7 – Handover and operation training
Operations team should be aware of:
- Setpoint.
- Scheduled runs.
- Alarm.
- Logic operation.
- Maintenance.
- Parameters to monitor.
A good HVAC system with bad operation can still consume a lot of energy.
Step 8 – maintenance and continue optimization
Commercial center HVAC has a life cycle of many years.
So the optimization process does not end at acceptance testing.
Need to continue monitoring:
- Performance.
- Electricity.
- IAQ.
- Complaints.
- Change the tenant.
- Actual load.
- The tendency to equipment degradation.
HRT towards a “right from the start” HVAC system
HRTs do not approach commercial center HVAC in the direction of selling or installing only one individual device.
The goal is to build a synchronous solution:
Refrigeration source right → flow rate right → air right → control right → operation right.
HRT can deploy items:
- Water Chiller.
- VRV/VRF.
- AHU.
- FCU.
- PAU.
- Packaged.
- Rooftop.
- HRV/ERV.
- Air duct.
- Air outlet.
- Ventilation.
- Suctioning waste.
- IAQ.
- Air purification.
- BMS.
- TAB/Commissioning.
- Maintenance.
- HVAC renovation and optimization.
Understand - Clear - Dedicated.
Source: Publisher’s English edition · Vietnamese original on doanvanhoang.com