HVAC factory needs to be designed according to thermal load, production line, operation mode and actual environmental requirements. HRT provides industrial HVAC solutions from survey, design, supply, construction to TAB, Commissioning, warranty and maintenance.

Industrial HVAC is not just cooling problems

When it comes to factory HVAC, many people often think of choosing an air conditioner with a large enough capacity.

In fact, this is just part of the system.

A plant may simultaneously arise:

  • Heat from machines and lines.
  • Heat is transferred through the roof and walls.
  • Dust, odor, smoke or technological vapors.
  • High humidity.
  • Large demand for outdoor air.
  • Pressure differential between areas.
  • Temperature requirements vary between each zone.

So HVAC industrial zones need to be looked at as a overall production environment control system.

A complete solution may include:

Air conditioner + outdoor air + ventilation + exhaust + Wind compensation + Air purification + Humidity control + Pressure control + Control

This is the “lung” that helps the plant maintain a stable operation environment.


5 core problems of factory HVAC

HVAC Industrial

A good industrial HVAC system shouldn't just deal with one parameter.

The system should simultaneously control at least five key factors.

Temperature control by each area

In the same plant, areas may have completely different temperature requirements.

For example:

  • Production area.
  • The office.
  • Kho.
  • Electrical room.
  • Server room.
  • Technical dept.
  • Quality inspection area.

Therefore, it is not recommended to apply a general temperature level to the entire plant.

Design should determine the correct cooling load and actual use conditions of each zone.

Humidity Control

Humidity can directly affect:

  • Quality of raw materials.
  • Products.
  • Machines.
  • Packaging.
  • Condensation phenomenon.
  • Corrosion.
  • Working conditions.

In some industries, humidity control is just as important as temperature control.

Ensure outdoor air volume

Outdoor air should not be handled in the style of “open for ventilation”

Flow rate should be determined based on:

  • Number of people.
  • Space type.
  • Operation conditions.
  • Air quality requirements.
  • The amount of air that's being sucked out.

The larger the outdoor air, the more HVAC load increases.

So we need to calculate the sync between Fresh air and cooling load.

Suction of waste from the right source

Plants often have multiple sources of generation:

  • Dust.
  • Smoke.
  • Heat.
  • Oily fumes.
  • Smells.
  • It's a little damp.

If you let these sources spread throughout the factory before treating it, your HVAC system will have to work harder.

More effective solutions are usually:

Generating source → Collecting → Local suction → Processing → Discharging out

Pressure Balance

When sucked out 20,000 m3/h but only supplied into 10,000 m3/h, the factory will form significant negative pressure.

Hot air, dust or odors from the outside and adjacent areas can be sucked back in.

Hence:

Exhaust Air must accompany Make-up Air.

This is a very important principle in industrial ventilation design.


Why is factory HVAC harder than office HVAC?

Office HVAC mainly handles:

  • People.
  • Illuminate.
  • Office equipment.
  • Heat passes through the structure.
  • Outdoor air.

In the factory, appeared one more very large group of loads:

Process Load – load from the manufacturing process.

The machinery can continuous operation and generate considerable heat.

Also, the workshop is usually of large height.

If the air supply - return organization is not correct, a large amount of energy can be used to process the upper volume that is almost not serving the work area.

So, industrial HVAC design needs answer:

Do you need to cool the whole plant or just the work area?

This is a question that can have a huge impact on capacity and investment costs.


Which HVAC system to choose for industrial park?

There is no one system that works for every factory.

The solution should be chosen based on the utility.

Water Chiller – solution for cooling large loads

Water Chiller is usually suitable for works with:

  • large cooling capacity.
  • Multiple use areas.
  • Long operation time.
  • Requires centralized control.
  • The need for AHU, PAU or FCU.

Typical Configuration:

Chiller → Pump → Piping → AHU/FCU/PAU → Gas distribution system

Chillers are especially suitable when the project owner needs to manage a large-scale central system.


VRV/VRF – flexible for independent areas

VRV/VRF often has the advantage when the project needs to divide multiple zones.

Suitable Application:

  • Factory office.
  • Meeting room.
  • Operations room.
  • Management desk.
  • Functional room.
  • Some suitable production areas.

The big advantage is the ability to control independently by each area.

However, VRV/VRF should not be used by default for all factories because it is easy to deploy.


Packaged – pragmatic solution for factory

Packaged is usually suitable for:

  • The workshop has a large area.
  • Production area.
  • Space needs high airflow rate.
  • Air duct delivery system.

Packaged has relatively centralized configuration and is suitable for a wide variety of industrial applications.


Rooftop – concentrated wind treatment on the roof

Rooftop can be selected when:

  • Have the right roof.
  • The project needs to save technical space.
  • The system needs concentrated wind treatment.
  • Able to arrange ductwork reasonably.

When designing Rooftop must additionally check:

  • Roof structure.
  • Rung.
  • Noise.
  • Maintenance.
  • Accessibility of equipment.

Not every factory needs air conditioning

This is a very important point.

Some factories just need:

Ventilation + Heat suction + Wind level + Wind compensation

instead of airing the whole plant.

For example, with a large heating area that does not require precise temperatures, investing in a Chiller or VRV may not be the optimal option.

The right solution may be:

Hot air suction overhead → Low wind level → Generate air flow through the work area

The correct plan must come from the actual requirements, not from the name of the equipment.


One factory can use multiple HVAC systems at the same time

This is the configuration that is most common in practice.

A project can use:

Production Area: Water Chiller.

Offices: VRV/VRF.

Technology Park: Packaged.

Heat Generation Zone: Exhaust industrial fan.

Technical Department: forced ventilation.

Areas requiring outdoor air: PAU or ERV/HRV.

So the right question is not:

“Isiller or VRV better?"

It should be:

“What system is needed in this area to achieve the best investment and operation efficiency?"


7 Data Must Have Before Designing HVAC Plant

Before calculating the capacity, HRT needs to understand the work.

Functional

Determine what each area is used for.

Production Lines

Need grip:

  • Equipment.
  • Capacity.
  • Location.
  • Heat arises.
  • Operating time.

Human Resources

Number of people affected:

  • Cooling Load.
  • Fresh Air.
  • Sensible Heat.
  • Latent Heat.

Structure of the project

Rating:

  • The roof.
  • The wall.
  • Glasses.
  • Door.
  • Sunny side.
  • Thermal insulation capability.

Operation mode

HVAC System Operation:

8 hours a day, 16 hours a day or 24/7?

This parameter directly affects the economic problem.

Environmental conditions required

Must clarify:

  • Temperature.
  • Relative Humidity.
  • Pressure.
  • Air Quality.

Expansion Plan

Plants with the ability to increase:

  • The chain?
  • Equipment?
  • - The personnel?
  • Production capacity?

Design from the beginning should take into account reasonable scalability.


Do not choose HVAC just because of low initial investment price

A cheap system at purchase can be extremely expensive when operational.

Project owner should evaluate:

CAPEX + OPEX + Maintenance + Replacement + Downtime

Where:

CAPEX: investment costs.

OPEX: operation costs.

Maintenance: maintenance costs.

Replacement: replacement costs.

Downtime: risk of production interruption.

With a plant operating for 10–20 years, electricity and maintenance can become huge expenses.


Common factory HVAC errors

Use m2 to select capacity

For example:

1 m² = X BTU/h

only suitable for extremely preliminary estimates.

The official design must calculate cooling load.

Air conditioner fitting but bypass ventilation

Factory heating due to machinery heat but only increase air conditioning will cause a sharp increase in electricity.

Sometimes the right solution is:

Heat suction first - air conditioning later.

Exhaust without wind compensation

This is a common pressure imbalance error.

Select device too large

Oversize is not safe.

Too large equipment may:

  • Increase CAPEX.
  • Control is unstable.
  • Reduce section loading efficiency.
  • Multiple shut-offs.

Do not leave maintenance space

An AHU that is great but can't remove filters or coils to clean it is still a bad design in the long run.


Optimized HVAC energy for industrial areas

An effective HVAC system should be optimized from the design.

Design the right load

Right, power is the first step.

Chia zone

Should not operate 100% system to serve 20% area.

Use VFD

Variable-frequency drive can be applied to:

  • Pump.
  • Fan.
  • Some compressor.
  • Flow rate control system.

Control by actual load

Can Integrate:

  • Temperature Sensor.
  • Humidity Sensor.
  • Pressure Sensor.
  • CO₂ Sensor.
  • Schedule.
  • BMS.

Energy recovery when appropriate

ERV/HRV can be effective when outdoor air and exhaust air are large.

However:

Not all constructions are economical to install ERV/HRV.

We have to calculate actual energy efficiency.


Process of deploying industrial HVAC at HRT

HVAC Industrial

Instead of starting with the selection of equipment model, HRT approaches the project from the actual needs of the building.

Deployment Chain:

Survey → Analysis → Design → Separation → Quotation → Construction → TAB/Commissioning → Handover → Warranty → Maintenance

Survey stage

Collect:

  • The ground.
  • Functional.
  • The chain.
  • Machines.
  • Heat source.
  • Dust/Odor source.
  • The need for temperature – humidity.

Analysis stage

Calculation:

  • Cooling Load.
  • Heat Load.
  • Fresh Air Load.
  • Moisture Load.
  • Exhaust Airflow.
  • Make-up Air.
  • Pressure Balance.

Solution Selection Stage

Compare:

  • Chiller.
  • VRV/VRF.
  • Packaged.
  • Rooftop.
  • AHU.
  • FCU.
  • PAU.
  • ERV/HRV.
  • Ventilation.
  • Suctioning waste.

The goal is to choose correct system, not choose the most expensive equipment.

Design stage

Deployment:

  • Schematic diagram.
  • Layout of equipment.
  • Piping.
  • Ductwork.
  • Drain.
  • Electrical.
  • Control.
  • Insulation.
  • Installation details.

Peeling Stage – Quotation

Clarification:

  • Equipment.
  • Supplies.
  • The mass.
  • Range.
  • Responsibility.
  • Items included and not included.

Construction phase

HVAC Synchronization Coordination with:

  • Structure.
  • Architecture.
  • Electricity.
  • PCCC.
  • Water supply and drainage.
  • Technology line.

TAB and Commissioning

After finishing need to check:

  • Airflow.
  • Water Flow.
  • Temperature.
  • Pressure.
  • Control.
  • Interlock.

Just because it's done doesn't mean it's working.

Handover – warranty – maintenance

System should have:

  • As-built documentation.
  • List of equipment.
  • Operation manual.
  • Service schedule.
  • Standards of periodical inspection.

When does the factory need to renovate HVAC?

An old system doesn't necessarily need to be completely replaced.

Should be surveyed when there are signs:

  • HVAC power surge.
  • The factory's still hot.
  • Winds are weak.
  • Temperature is irregular.
  • Condensation.
  • High humidity.
  • Poor odor absorption.
  • Rung.
  • Noise.
  • AHU lacks wind.
  • The chiller is not working properly.
  • Thermal insulation degradation.
  • Duct leakage.
  • The factory changed the line.

HRT usually prioritizes:

Measurement → Analysis → Cause Determination → Renovation → Calibration → Optimization

before suggesting a full system replacement.


General contractor industrial HVAC HRT

Image Location: re-use primary image yes
CEO Đoàn Văn Hoàng + Factory + Water Chiller + AHU/FCU/PAU + HRT

HRT offers HVAC solution in series:

Consulting – Design – Supply – Construction – TAB – Commissioning – Warranty – Maintenance

The main systems include:

  • Water Chiller.
  • VRV/VRF.
  • Packaged.
  • Rooftop.
  • AHU.
  • PAU.
  • FCU.
  • ERV/HRV.
  • Outdoor air system.
  • Ventilation.
  • Suctioning waste.
  • Piping HVAC.
  • Ductwork.
  • Electrodynamics.
  • Controls.
  • BMS.

The implementation methodology of HRT focuses on:

Right understanding → Right design → Right construction → Right measurement → Durable operation


Green HVAC for long term operation plant

A good HVAC system does more than just deal with temperature.

The long - term value lies in the ability to:

  • Reduce energy waste.
  • Increase stability.
  • Improve your work environment.
  • Limit the incident.
  • Reduce maintenance costs.
  • Increase your management.
  • Support ESG orientation.

For long - term investment, the question should not be:

“How much is the initial investment?"

Which need to add:

“How much will the system cost in 10–20 years?"

That's the right way to look at industrial HVAC.


HRT – Right from the start to optimize the entire HVAC life cycle

Industrial HVAC is a synthetic problem between:

Temperature – Humidity – outdoor air – Exhaust – Pressure – Energy – Production technology

It is not recommended to choose the system solely based on the area, equipment price or habits of the previous project.

Each factory should be analyzed as a separate problem.

HRT aims at solutions:

Correct capacity – Correct equipment – Correct flow rate – Correct pressure – Correct operation demand.

Thereby helping project owners better control:

Investment cost + Electricity cost + Maintenance cost + Life expectancy + Scalability.