Xuân Phương, Hanoi
hvac@hrt.vnContact us
HVAC GREEN – HVAC equipment, spare parts and solutions Sales hotline0995.895.555 Cart0

Profile HRT 2026 – HVAC general contractor – GREEN with ESG standards

Machine-translated from Vietnamese. Read the original in Vietnamese

Profile HRT 2026 – general contractor HVAC – ESG GREEN

Profile HRT 2026 – general contractor HVAC – ESG GREEN

Capacity profile helps customers understand the contractor. The actual work is the place to verify capacity.

With HRT, a profile should not only be beautiful images, equipment catalog or introductions. The profile should help the project owner see clearly: what does the business do, how is the team organized, what items have been implemented and how to pursue work.

Profile HRT 2026 Introducing HRT Air Conditioning and Ventilation Company Limited with operational groups from design consultancy, equipment supply, installation to maintenance, servicing and repair of central air conditioning and ventilation systems, industry. HRT in Profile 2026(1)

On the official website, HRT develops positioning general contractor HVAC In the direction of synchronous approach: survey, consulting, design, supply, construction, acceptance testing, handover and continued companion in operation. HRT

The orientation is condensed in a philosophy:

Right from the beginning – Clear to the end – Sustainable Green.

It is also the spirit that runs through the core values and strategies presented in the HRT competency profile.

1. What does HRT 2026 Profile introduce?

1. What does HRT 2026 Profile introduce?

Business information and scope of operation

The unit introduced in the PDF is HRT Air Conditioning and Ventilation Company LimitedEnglish name HRT Ventilation Air Conditioner Company Limited, abbreviated name HRT VAC CO., LTD., Business ID number 0108581991. HRT in Profile 2026(1)

The profile identifies five functional groups: HVAC solution design consultancy; supply of central air conditioning equipment, industrial air conditioning and ventilation; system installation; maintenance, servicing, repair; and industrial air conditioner rental services. HRT in Profile 2026(1)

What the project owner needs to care about is not only the number of services. More importantly, whether the work pieces are connected into a clear plan for the work.

The selected equipment must be accompanied by installation conditions. Construction measures must be accomcompanied with inspection requirements. Handover dossiers must serve the system administrator.

Do not just ask the contractor what equipment he or she sells. Ask how the contractor will organize the work problem.

Distinguish the history of the brand and the time of establishment of the legal entity

Website introduces HRT recognized brand origin year 2011, with three co-founders Nguyễn Việt Cường, Đoàn Văn Hoàng and Vũ Thị Lan. Meanwhile, Profile of HRT Air Conditioning and Ventilation Company Limited write the time of operational licensing as 11/01/2019. These are two landmarks of the brand and legal entity introduced, should not be used interchangeably. HRT HRT in Profile 2026(1)

A profile covering both technical and occupational skills

The HRT Profile Index shows the sections on company introduction, quality policy, logo meaning, vision, mission, core values, business ethics, culture, organization, personnel, technical solutions, partners, works and certification documents. HRT in Profile 2026(1)

This is the basis for customers to evaluate HRT in many aspects, instead of just seeing a price list or some construction pictures.

Capacity should be seen from people, methods and work done.

2. HRT team and CEO imprint Đoàn Văn Hoàng

2. HRT team and CEO imprint Đoàn Văn Hoàng

Engineer background, practical working thinking

In Profile's open letter, he... Đoàn Văn Hoàng introduced as the CEO. The profile emphasizes the orientation to bring “Green Breath” solutions with dedication and professionalism. HRT in Profile 2026(1)

Additional information from his personal website states that he graduated as a Technology Engineer in refrigeration and thermal engineering in 2007, has participated in the supervision of construction at REE and deployment of drawings, supervision of Chiller systems during the working period at Vinameed. This is personal professional experience, which should be distinguished from HRT's portfolio. Đoàn Văn Hoàng

The CEO's Đoàn Văn Hoàng style of action is embodied in how HRT interprets the working philosophy: understanding needs before proposing, clarifying responsibilities during implementation and moving towards long - term operational value. HRT

Action does not mean to rush. Action is to clarify what needs to be done and pursue it to the end.

Organize to coordinate, not just gather personnel

The organizational chart in the Profile places the Business, Finance, Human Resources, Project and Service departments under the direction of the Director. Relevant departments continue to be assigned according to functions such as construction, warehouse supplies, warranty and after-sales care. HRT in Profile 2026(1)

Also in the Human Resources section, the records listed 9 refrigeration and thermal engineering engineers, 6 mechanical engineers, bachelor's, professional secondary and at least 20 workers grade 3/7–4/7. This is the figure published in the Profile, not a commitment that all personnel will be mobilized simultaneously for a project. HRT in Profile 2026(1)

When implementing a specific project, it is necessary to unify the structure of personnel in charge, coordinators, construction forces and focal points for handling each group of work.

Having a team is fundamental. Clear assignment and effective coordination creates execution capacity.

Technical training and capacity materials

In printed pages 36–38, Profile includes certificate images, training certificates for design and construction of Daikin VRV systems, and business registration certificates. HRT in Profile 2026(1)

These documents help customers have more basis to consider training platform and business information. With specific requirements for contractor selection, it is necessary to continue to compare documents in accordance with the scope of work and document requirements of the project.

3. HVAC Solutions Groups in the HRT 2026 Profile

3. HVAC Solutions Groups in the HRT 2026 Profile

Central air conditioner VRV/VRF

Profile of central air conditioning system VRV/VRF, with brands mentioned such as Daikin, Mitsubishi, LG, Samsung and Panasonic; the application group in question includes buildings and offices. HRT in Profile 2026(1)

When exchanging options, the project owner needs to clarify each area's functionality, history, equipment location and operation requirements before finalizing configuration.

Select equipment after understanding the work, do not reverse the process just to get an early quote.

Water Chiller and Auxiliary System

A separate section of the profile is reserved for Chiller system, including system diagram, operating principle, cooling tower, pump, heat exchanger, meter and valves. HRT in Profile 2026(1)

This presentation shows the range of introductions that do not stop at water coolers, but also the coordinated components in the system.

For Chiller problem, technical discussion should clarify the overall configuration, installation conditions, auxiliary scope, test plan and handover responsibility.

A good machine needs to be placed in a well organized system.

AHU, FCU and Air Handling

AHU, FCU and Air Handling is the group of solutions listed in the HRT portfolio of capabilities. The profile also presents photos of equipment and installation items related to Chillers, AHUs, FCUs. HRT in Profile 2026(1)

In implementation, it is necessary to consider equipment and pipelines, wind distribution system, condensate drainage, power supply and conditions for accessing maintenance according to the selected design.

Do not treat the device as a separate item. Be clear what needs to be coordinated so that the device serves its intended purpose.

Industrial Air Conditioner Packaged

Profile identification Industrial Air Conditioner Packaged is a group of competences. The portfolio has examples of Packaged use at factories and raw material warehouses, including water-cooled systems. HRT in Profile 2026(1)

Therefore, when considering the needs of a factory or production area, the selection should not stop at capacity. It is necessary to clarify the purpose of use, site conditions, system scope and maintenance requirements.

The industrial solution must come from the manufacturing problem, not just from the list of available machines.

Ventilation, outdoor air level and exhaust gas suction

Profiles taken ventilation, outdoor air level, exhaust gas suction to the solution list; and at the same time, there are photos of ventilation systems and ventilation pipes that have been constructed. HRT in Profile 2026(1)

The scope of work should be determined according to the needs of each area and project design, rather than considering ventilation as an additional part of processing after the locking of the entire air conditioning system.

Maintenance, repair and optimization operation

Service Announcement Profile periodic maintenance, repair and optimized HVAC operationAdditional solutions catalog also introduces the air odor treatment for kitchens and restaurants with RydAir products and R-Refresher solution for existing air conditioning systems. HRT in Profile 2026(1)

For any optimal solution, it is necessary to investigate the applicability and unify the assessment before reaching a conclusion. The fact that a product appears in the catalog does not mean that every system uses the same savings.

Optimization must start from the status quo. Conclusions must be based on results that are consistent with operational conditions.

4. Typical works: Read capacity through the scope of implementation

4. Typical works: Read capacity through the scope of implementation

The building items in the HRT Profile showcase office, factory, school and cruise ship project groups. The examples below are for the scope of the project; they do not imply that HRT performed all the M&E work for each building.

Works introduced Record Range in Profile
Vietcombank Office Building, 198 Tran Quang Khai Street HVAC system. HRT in Profile 2026(1)
5-star cruise ships in Halong Bay and Cat Ba Chiller system cooled by seawater. HRT in Profile 2026(1)
Thang Long tobacco raw material warehouse Packaged Air Conditioning System Water Cooled. HRT in Profile 2026(1)
Miza Nghi Son Paper Factory, Thanh Hoa Packaged water-cooled air conditioner. HRT in Profile 2026(1)
SG Electronics Components Factory, Yen Phong Industrial Park AHU GAS for cleanroom, Samsung VRF and LG Packaged air conditioner. HRT in Profile 2026(1)
Uniden Hai Duong Factory Ventilation system. HRT in Profile 2026(1)
MOLEX Factory, Dong Anh, Hanoi Packaged Trane Industrial Air Conditioning System. HRT in Profile 2026(1)
Cozy Tea Factory, Phu Tho AHU system. HRT in Profile 2026(1)

This catalog helps customers identify the types and categories of HRT that have been included in the experience record.

When assessing suitability for a new project, it is recommended to continue discussions about the extent of similarity, implementation conditions and technical documentation to be provided.

A work name that generates attention. New clear scope of work helps to properly evaluate experience.

5. HRT's core values and business commitment

5. HRT's core values and business commitment

Understand Right – Be Clear – Dedicated

At print page 09, Profile defines three core values Understand Right – Be Clear – Dedicated and tied to philosophy Right from the beginning – Clear to the end – Sustainable Green. HRT in Profile 2026(1)

Understand correctly is to start by surveying, listening and analyzing the reality to determine the needs, characteristics of the work and investment objectives.

Clearly is transparent in consulting, design, construction and acceptance testing; clarifying the scope, technical requirements, progress and responsibility.

Dedicated is carefully calculated before design, controlled when construction and continued to accompany after handover.

These three values are not just about the content. They set out how to answer very real questions: is the information enough, is the plan agreed upon, who's in charge and how has existence been handled?

Five business ethics commitments

HRT Profile has a separate section for the following five business commitments. HRT in Profile 2026(1)

Understand right – Advise right – Quotation right. Survey the actual needs before proposing, avoid over-demand consultation and clarify costs from scratch.

Standard design – Standard construction – standard acceptance testing. Put quality and safety before speed.

Clear about the work – Clear about the people – Clear about responsibility. Define the tasks so that the parties have a basis for coordination and control of progress.

Honesty – Prestige – Long-term companion. Introduce the right capacity, clarify solutions and fulfill responsibilities with customers and partners.

Optimized green – Safety – Sustainability. Towards efficient energy use, air quality and green buildings.

Action – Discipline – Learning – Serving

In the corporate culture section, HRT states four elements Action, Discipline, Learning, Serving; while mentioning respect for colleagues, cooperation with the same goal and transparency with partners. HRT in Profile 2026(1)

The message should be translated into everyday work: do not delay the known problem, do not blame instead of handling, do not ignore control and constantly improve expertise.

Prestige is not only built by commitment. Prestige is accumulated through each time of strictly implementing commitments.

6. HRT – ESG GREEN: Orientation needs to come with evidence

6. HRT – ESG GREEN: Orientation needs to come with evidence

Right in the corporate culture, Profile clearly “HRT and ESG standard general contractor HVAC orientation”, with three aspects Environmental, Social and Governance. The vision section also orients green HVAC contractor development, interested in energy saving and environmental protection. HRT in Profile 2026(1)

So in this introduction, “ESG Green" is the orientation of operation and solution development. It should not be understood that the inscription is enterprise proof or every building has had a specific ESG certification.

E – Environment: Being interested in operational value

The environmental orientation in the dossier is associated with optimal solutions, energy saving and reduction of adverse impacts on the environment. HRT in Profile 2026(1)

To be specific in each project, it is necessary to determine which targets the system is serving, how the current data is being evaluated and how improvement results will be assessed.

It is not recommended to give a general saving rate just because the device is newer or the solution is called “green”

Speaking thrift must have a basis for comparison. Speaking efficiency must clarify the evaluation condition.

S – Society: Responsibility to customers and employees

The profile mentions the benefits of customers, shareholders, staff; human resource training; a respected and fair working environment; and accompanying after handover. HRT in Profile 2026(1)

In the work, that orientation should be transformed into safe work organization, clear operational guidance and the ability to support the system takeover.

Completion of installation is not yet the complete fulfillment of the full responsibility to the user.

G – Management: Transparency and clear responsibility

Commitments to transparency, scope, person in charge and discipline are the contents of the Profile. HRT in Profile 2026(1)

When implementing, it should be concretized into the way of managing drawings, approving supplies, recording changes, saving inspection results and monitoring unfinished work.

A change needs to be documented. A conclusion needs to be grounded. A existence needs to be processed.

Distinguish ESG Orientation from Certification Documentation

The certificates and certifications illustrated at the end of the Profile focus on VRV Daikin technical training and business registration information. They should not be interpreted as ESG certification for the entire enterprise or project. HRT in Profile 2026(1)

For any certification claim, the contents to be announced must be consistent with the name of certification, the subject, scope and dossier of actual certification.

7. From HRT Profile to work organization at the work

7. From HRT Profile to work organization at the work

HRT's official website emphasizes survey before consulting, proper understanding before designing, clarification before deploying and testing before acceptance testing. HRT

From these commitments, five control points can be specified below. This is a proposed framework for project exchange; the detailed scope should be agreed upon under the contract.

Phases Contents to be agreed Results to have
Survey and identify requirements Functions, current status, investment objectives, operation needs Input data, requirements and assumptions are clarified
Calculation and design Bases for solution selection, configuration, installation and maintenance conditions Approved calculation dossiers, drawings, parameters and plans
Supply and construction Types of materials, implementation measures and coordination of items Materials control, installation and change records
Testing and acceptance testing Test method, test conditions, acceptance criteria Inspection results, records and list of existing issues to be handled
Handover and companionship As-built documentation, operation manuals, maintenance plans Information sufficient for takeover and management of the system

The important point is not to have a same process table for every building. The important point is each project clearly knows what to control, who to implement and what grounds to confirm completion.

The general contractor HVAC mindset does not mean that it will accept all work items by default. Before deploying, it is necessary to clearly define the boundaries between the HVAC part and the parties involved.

Clear scope before doing. Clear criteria before checking. Clear responsibility before handing over.

8. FAQs about HRT 2026 Profile

8. FAQs about HRT 2026 Profile

HRT only provides equipment or has design and construction?

According to Profile, HRT has operational groups that advise on design, equipment supply, installation, maintenance, servicing and repair of HVAC systems. The scope of participation in a project should be determined in the specific agreement. HRT in Profile 2026(1)

What systems are featured in the HRT portfolio?

Main groups include VRV/VRF, Water Chiller, AHU, FCU, Industrial Air Conditioner Packaged, Ventilation, Outdoor Air Supply, Exhaust Gas Suction and Maintenance Services, Optimized Operation. HRT in Profile 2026(1)

Does Profile have experience for factory and specific works?

The application includes examples of factories, raw material warehouses, AHU systems for cleanrooms, offices, schools and cruise ships using Chillers. It is necessary to compare the scope of each work when assessing the suitability for the new project. HRT in Profile 2026(1)

Is “general contractor HVAC – ESG GREEN” a certification?

This is the positioning and orientation presented by HRT. Brand positioning does not replace certification documentation or evidence that meets the specific requirements of the project. The main profile uses the expression “oriented general contractor HVAC ESG standards” HRT in Profile 2026(1)

What should project owner prepare before working with HRT?

Please prepare drawings or information on current status, utility, technical requirements, expected progress and investment objectives.

With an existing system, it is recommended to add equipment information, operation schedule, maintenance history, problems and current consumption data. This is the basis for exchanging options instead of just comparing an initial price.

9. View Profile HRT 2026 and start from the construction problem

 

A good profile helps to start the conversation. A clear headline helps the conversation move in the right direction.

HRT towards connecting platforms Heat – Cold – Technology with the way of doing the job Understand Right – Be Clear – Dedicated, as the content is presented in the section of brand meaning and core values of Profile. HRT in Profile 2026(1) 

For new construction, start with the functions, drawings and operation requirements.

For renovation, start with the current state of the building, any inadequacies, and what you want to accomplish.

Do not start with a list of equipment you want to buy. Start with a problem you need to solve.

HRT Contact Information

HRT Air Conditioning and Ventilation Company Limited
Headquarters: No. 9TT7, Foresa 7A Street, Tasco Ecological Urban Area, Xuan Phuong Ward, Hanoi, Vietnam.
Business ID number: 0108581991. HRT in Profile 2026(1)

Hotline for consultation: 0916.181.080 – 0903.080.080.
Zalo Consulting: 0909.326.888.
Email: sales@hrt.com.vn. These clues are published on the HRT website and CEO introduction page. HRT

View Document: HRT in Profile 2026(1).pdf.

HRT – Green Breath for All Buildings

Survey to understand right. Design to solve right. Build to realize. Test to confirm. Accompany to maintain value.

Right from the beginning – Clear to the end – Sustainable Green.

Source: Publisher’s English edition · Vietnamese original on doanvanhoang.com