Reducing power for HVAC systems should not start with the purchase of additional equipment. Enterprises need to determine the correct range of measurement, restore the technical status, load control and prove the results by data before – after.

Reduced HVAC operation costs: 8 decisions to close before investing

HVAC

In many meetings about energy savings, the first question is often:

“What equipment should I replace?"

In my opinion, that's not a question to ask first.

I want the team to clarify:

  • What area is the system serving?
  • What time frame is the device running?
  • What is each piece of electricity producing?
  • Is it the equipment, the distribution system or the controls?
  • After improvement, what grounds confirm the effect?

The true Energy Saving HVAC is not about forcing the system to run less at all costs. The goal is to remove the energy that does not create value, while maintaining the temperature, humidity, ventilation, stability and use conditions of the building. This approach is also consistent with the principle of prioritizing calibration, scheduling operations, and monitoring performance in equipment operation management.

What results does HVAC operation cost reduction have to produce?

An optimal project should not just end with the announcement that the electricity bill is lower this month than last month.

The results should be visible in at least four aspects:

  • The conditions for the use of the building are still maintained.
  • Energy consumption decreases under comparable conditions.
  • The system operates stably, without additional errors or machine stoppage.
  • The operation team understands what has changed and knows how to maintain results.

If the power decreases due to cooler weather, lower plant output or shorter building life, it is not conclusive that the entire reduction comes from HVAC solution.

Therefore, before talking about the savings rate, it is necessary to clearly define the conditions for comparison.

Three boundaries must be defined before optimizing

Operation cost

Boundaries on usage requirements

Each area may have different requirements.

Offices need to maintain convenience for users. The factory may have to control temperature, humidity or pressure according to technological requirements. Technical rooms, warehouses, production areas and public spaces should not be applied the same way of operation.

The technical team should agree:

  • Temperature conditions to maintain.
  • Limit the humidity if you have it.
  • Outdoor air intake and ventilation requirements.
  • Operating timeframe.
  • Priority area.
  • Condition that allows for load reduction or stopping of the device.

Without this boundaries, power reductions are easy to translate into service quality reductions.

Boundaries of measurement

Need to clarify the project under evaluation:

  • The whole building.
  • HVAC system alone.
  • A cluster of chillers.
  • A VRV/VRF area.
  • An AHU or production line.
  • A group of pumps, fans or auxiliary equipment.

Measuring the entire building but only renovating one pump can cause the results to be obscured by many other electrical loads.

Conversely, measuring one device alone can ignore the effect of that device on the entire system.

Boundaries of responsibility

I always ask for clarification from the beginning:

  • Who provides the data?
  • Who confirms the status quo?
  • Who is allowed to change the setpoint?
  • Who approved the new sequence operation?
  • Who follows after the improvement?
  • Who handles when results are not met?
  • Who is responsible for maintaining the unified configuration?

A solution without a responsible person will be easy to return to the old state after several weeks of operation.

Decision 1: Construction of base roads before changing the system

Reduce HVAC operation costs

The baseline is not a randomly selected electric bill.

The baseline should show the operation status before improvement, including information suitable for the project scope:

  • Power consumption.
  • Electrical power over time.
  • Number of hours of operation.
  • Outdoor temperature and humidity.
  • Conditions in the area of use.
  • Number of people or output.
  • Device status.
  • Setpoint and control sequence.
  • Abnormal incidents or maintenance work.

The U.S. Department of Energy notes that baseline conditions should be identified and saved before implementing a solution. After the system has changed, accurate reproduction of the original state is often no longer feasible. 

Don't make it a rigid requirement that all projects collect data at the same time.

Systems with stable loads may need a measurement different from a factory with variable output, a hotel with seasonal room capacity, or a business center with weekend loads that are different from weekdays.

Actions to be taken

Before construction, make a record of the baseline, specifying:

  • Measuring range.
  • Measuring equipment.
  • Data retrieval interval.
  • Operation conditions.
  • The assumptions are in use.
  • Where to adjust the baseline.

Without baseline, it is not recommended to commit a specific rate of savings.

Decision 2: Zoning off the electricity that does not generate value

Not all HVAC power can be cut.

Part of electricity used to maintain the required conditions. The part to be found is the electricity being consumed due to inappropriate operation.

Technical team should check:

  • Does the device run out of hours?
  • Is the uninhabited area still cooled?
  • Does the pump and fan run at high when the load is low?
  • Is the backup device in unnecessary simultaneous operation?
  • Are there any control commands that are working against each other?
  • Is the system started too early or stopped too late?
  • Alarm has been confirmed but not yet processed?

Day, week and weekend cyclic data can help detect background loads, off-schedule devices and times when power is unusually increased. Energy information management systems can also assist with load chart analysis, misalignment recognition and post-improvement tracking of results. 

Grouping of opportunities for improvement

I propose to divide the problems into three groups:

  • No or little investment: fix running schedule, restore setpoint, calibrate sensor, close device overtime.
  • Average investment: Control improvement, measurement addition, variable-frequency drive fitting when appropriate, system calibration.
  • Big investment: Replace Chiller, renovate the assembly, replace VRV/VRF system or upgrade the entire BMS.

This type of classification helps businesses address waste clearly before making a big investment decision.

Decision 3: Restore the technical status before purchasing new equipment

A degradation system can not be accurately evaluated by mere catalog parameters.

Before suggesting replacement, it is necessary to check the causes that may cause the system to operate in the wrong state of design:

  • dirty air filter or differential pressure rise.
  • Dust-proof Coil Heat Exchanger.
  • Temperature sensor, humidity or pressure deviation.
  • The cold water valve is not opening properly.
  • Damper is stuck or misplaced.
  • Air duct leakage.
  • Thermal insulation damage or condensation.
  • Water flow rate and airflow rate are not consistent.
  • There's a problem with the refrigerant pipeline.
  • Heat exchanger does not decompress or discharge heat well.
  • Pump, fan or motor operated outside the appropriate area.

I do not want maintenance report only write “cleaned” or “machine working normally”

The report must indicate:

  • Pre-processing status.
  • The work is done.
  • Post-treatment parameters.
  • The problem is fixed or not.
  • What to keep track of.
  • What items need additional investment.

The right maintenance must help the system return to a evaluatable state, not just make the equipment cleaner.

Decision 4: Reorganize operation schedule and setpoint

This is a work group that should be checked before many equipment investment plans.

A system can be maintained well but still consume high electricity if:

  • Launch when the area is not in need.
  • Continue running after the user has left.
  • There is no separate calendar for holidays.
  • Setpoint changed but not reverted.
  • Many different areas use the same control mode.
  • Operation personnel must manually intervene every day.

ENERGY STAR recommends that equipment should only be operated when necessary, and that operation schedules, setpoints, and control strategies be periodically checked and updated in the operation documentation. ENERGY STAR

Do not adjust the setpoint by feeling

Raising the temperature setting is not always a good solution.

Before making changes, consider:

  • Requirements of each space.
  • Actual temperature and humidity.
  • Sensor location.
  • The room temperature uniformity.
  • The amount of air supply.
  • Human density and heat generating devices.
  • User feedback.

I suggest building a setpoint matrix by region, timeframe and mode of use. Any temporary changes should be noted and have a revert point.

Decision 5: For pump, fan and air conditioner operation according to actual load

The power - adjusting device may not be properly controlled.

Install variable-frequency drive for a non-synchronous motor system that definitely saves electricity.

Before deploying, it is necessary to answer:

  • Actual load change big enough?
  • Where's the control signal coming from?
  • What is the minimum flow rate of the system?
  • Are valves, damper and terminals responsive?
  • Is there a risk of lack of flow rate through the device?
  • Is the device controlled individually or in an overall sequence?
  • When the sensor signal fails, what mode will the system switch to?

Variable-frequency drive is only a tool.

Efficiency lies in control strategies, technical limitations and the ability to coordinate between devices.

Control the cutting order

With multi-machine systems, it is not advisable to let the device start and stop at a simple threshold if that gives rise to:

  • Continuous start.
  • The load cell is too low.
  • Multiple machines running at the same time, but not necessarily.
  • Auxiliary pump or fan running when main machine has stopped.
  • Chiller, cooling tower and pump not coordinated.

Sequence needs to be tested at multiple load states, not only at high load conditions.

Decision 6: Assess the performance of the entire system

HVAC efficiency should not be concluded by the parameters of an individual device.

For Chiller System

Need to see the whole cluster:

Chiller – chilled-water pump – condenser water pump – cooling tower – AHU/FCU – control system.

The following indicators can be considered:

  • Power capacity of the whole plant.
  • kW/RT performance under agreed conditions.
  • Load Ratio of each Chiller.
  • Supply-water temperature and anise water.
  • Water temperature difference.
  • Flow rate and differential pressure.
  • Pumping capacity.
  • Cooling tower status.
  • The order of cutting and closing the machine.

A new chiller has good performance but pump, cooling tower and sequence are not suitable can still make the total power of the plant high.

For VRV/VRF System

Don't rely solely on variable-frequency drive technology.

Need to check simultaneously:

  • Load partition.
  • Activity schedule of each indoor unit group.
  • Setpoint at the area of use.
  • Air filter and heat exchanger status.
  • Thermal discharge conditions of outdoor unit.
  • Refrigerant piping system.
  • Central control configuration.
  • These indoor units operate when the area is not in use.
  • Areas with conflicting operation requirements.

The goal is for each area to receive the required level of service, not for the entire system to run on a common command.

For AHU, FCU and PAU

Need to evaluate both wind side and water side:

  • Differential pressure through filtration.
  • Cleanliness of coil.
  • Wind in and wind out temperature.
  • Airflow rate.
  • Static pressure.
  • Damper position.
  • Operation of cold water valve.
  • Supply-water temperature and return.
  • Fan control signal.
  • Outdoor air level status.

When only increasing the fan speed to handle an area lacking wind, the system may consume additional electricity but the root cause is still unresolved.

For Packaged and Rooftop

Need to check:

  • Operation schedule.
  • Status condenser coil and evaporator coil.
  • Return airflow and supply air.
  • Conditions for taking outdoor air.
  • Sensors and thermostats.
  • Frequency of compressor switching.
  • Partitioning capabilities.
  • Actual load compared to the device capacity.
  • Air duct and thermal insulation condition.

The whole assembly must still be evaluated as part of the construction, not as an independent machine box.

Decision 7: Retrofit only when the investment problem is clear

New equipment may provide better performance, but it's not the only basis for investment.

Before deciding to retrofit or replace the machine, it is necessary to compare:

  • Current consumption after standardized conditions.
  • Expected consumption of the new plan.
  • Investment costs.
  • System stop costs and production effects.
  • Maintenance costs.
  • Ability to provide spare parts.
  • The remaining life of the existing equipment.
  • Ability to integrate with BMS.
  • Requires renovation of electricity, water, air duct and structure.
  • Warranty conditions.
  • Expansion possibilities in the future.

I don't want an option that just presents the payback period but doesn't specify the assumption.

Each forecast figure should include:

  • Time of operation.
  • Electricity price used for calculation.
  • Load ratio.
  • Environmental conditions.
  • Equipment performance.
  • Maintenance costs.
  • Scope of work included and not included.

For large projects, it is possible to deploy in one area or a group of devices before scaling.

Decision 8: Unify the acceptance testing and measurement way before construction

Do not wait until you have completed the question:

“How do you measure savings now?"

The measurement and verification plan should be prepared together with the technical plan.

The U.S. Department of Energy categorizes measurement and verification methods by scope from individual equipment, systems to entire buildings or simulation models. Methods should be selected based on solution characteristics, complexity, and risk of the expected savings portion. 

Acceptance records to clarify

  • What device or system is being measured.
  • What parameters are used.
  • Measuring equipment and accuracy.
  • Measuring time.
  • Load condition when measuring.
  • Methods adjustable according to weather, output or hours of operation.
  • Criteria for achievement.
  • How to deal with the case if it is not satisfactory.
  • Confirm the results.
  • Frequency of reassessment.

Commissioning helps confirm the system has been installed and operates as required. Measurement & Verification helps identify portions of energy changes.

These two are related but not interchangeable.

Action roadmap 30 – 90 – 180 days

This is a reference frame. The actual time needs to adjust according to the size and complexity of the work.

Phases Action focus Results to have
0 – 30 days Collect records, review operation schedule, check alarm, overtime survey, determine measurement range and sensors to be tested Consumption map, abnormal list, baseline range
31 – 90 days Fix filter, coil, sensor, valve, damper, leakage; adjust schedule and sequence; measure before – after Results of low-investment solutions, list of items to be renovated
91 – 180 days Test variable-frequency drive, control or retrofit; commissioning; M&V; training operation Effective records, scaling plans, processes to maintain results

 

Each phase must have a person in charge, deadlines and proof of completion.

Indicator should be monitored after improvement

Not all buildings need to use the following indicators.

Please select the indicators that are directly related to the project scope:

  • kWh of HVAC.
  • Maximum kW.
  • kWh per hour of operation.
  • kWh per unit of output.
  • kW/RT of Chiller plant.
  • Supply-water temperature, return water and temperature difference.
  • Flow rate and differential pressure water.
  • Pump and fan power.
  • Differential pressure through filtration.
  • Temperature, humidity and response level at the use area.
  • Overtime power.
  • Number of device starts and stops.
  • Alarm, machine stop time and user reflection number.

The Dashboard doesn't need a lot of data.

The Dashboard needs to help the operator recognize the problem and know where to act.

Mistakes that make electricity saving projects inefficient

  • Commitment to a fixed saving rate: Each project has different load, equipment and operation conditions.
  • Compare only two bills: Weather, yields and hours of use may have changed.
  • Fitting technology but not constructing sequence: Variable-frequency drives, sensors and BMS will not produce results without control logic.
  • Reduce service conditions to reduce power: Do not trade ventilation, air quality or technological requirements.
  • Do not update documents: The new configuration can be changed or lost when the operation personnel changes.
  • Do not assign the responsibility to maintain: Initial efficacy may decline without follow-up.
  • No operation team training: The system is optimal but the recipient does not understand how to use it, the result is difficult to sustain.

CEO's view Đoàn Văn Hoàng: Reduced electricity must come with clear responsibility

With over 20 years of working in the HVAC field, I don't judge a project's success by taking a photo of the bill in a month.

I want to see a controlled system.

Understanding the Right: Find the Right Part of Energy Wasted

Don't start by protecting an existing solution.

Let's start with data, the current state and the requirements for use.

There are projects need to replace Chiller.

There are works need to fix sequence.

Somewhere the problem is with pumps, fans or differential pressure.

There are places where just restore sensors, running schedules or control valves.

If the cause is unknown, do not close the device.

Clear: Every number has to have conditions

What range is measured?

What data is real data?

What content is being assumed?

Is the before and after condition comparable?

Who is responsible for confirmation?

I asked that these be included in the profile, not just verbally.

Dedication: Do not hand over a system that the operator cannot take over

After the improvement, the operation team must know:

  • Where the system has changed.
  • Which setpoints to maintain.
  • Any alarms need immediate action.
  • What data to track.
  • When the effect begins to decline.
  • Who's the tech support contact?

Energy savings are only significant when results are maintained during long-term operation.

How does HRT deploy optimal HVAC operation?

HRT approaches projects in a workflow:

Surveying the current status → Determining the measurement range → Building the baseline → Finding the cause → Making a plan → Implementation → Commissioning → Measurement and verification.

The scope of implementation may include:

  • Evaluate your existing HVAC system.
  • Power data analysis and BMS.
  • Optimize Chiller Cluster.
  • Optimize VRV/VRF system.
  • AHU, FCU and PAU test.
  • Weigh pumps, fans, water and wind.
  • Renovation of controls and sequence.
  • Application variable-frequency drive when grounded.
  • Optimized outdoor air and heat recovery.
  • Commissioning and retro-commissioning.
  • Create a retrofit plan.
  • Follow up the results after improvement.

HRT does not default to all buildings requiring device replacement.

The plan must be selected from actual data, requirements for use and the ability to verify the results.

HRT Air Conditioning and Ventilation Company Limited

Hotline: 0909.326.888
Email: CEO@hrt.com.vn
Website: HRT – Green Breath for All Buildings. HRT

Frequently Asked Questions on HVAC Operation Cost Reduction

Where to start optimizing HVAC?

It is recommended to begin by identifying the range, usage requirements, operation schedule and existing data. Then zone the device or area with signs of abnormal power consumption.

Is HVAC power saving mandatory to replace a new machine?

No. Many problems may lie with sensors, air filters, valves, damper, schedule, flow rate or sequence control. These should be checked before deciding to replace the device.

Are variable-frequency drives reliable at reducing power?

No. Efficiency depends on the changing level of load, control signal, minimum flow rate and coordination ability of the whole system.

Does BMS automatically save the system?

BMS is a monitoring and control tool. Efficiency only appears when the sensor is accurate, the control logic is consistent, the data is monitored, and abnormalities are processed.

How do I prove that the system has saved electricity?

A baseline, clear measurement range, front-to-back data and adjustment method are required as weather, output, number of people or operation time changes.

Should we reduce the amount of outdoor air to reduce cooling load?

It is not recommended to reduce without permission. Any change must ensure ventilation requirements, air quality and conditions of use of the works.

Conclusion

Reducing HVAC operation costs does not start with buying more technology.

The correct process should go in order:

Determine requirements → Current status measurement → Waste zoning → System restoration → Load-driven control → Based investment → Commissioning → Re-measure the result.

New equipment can be part of the solution.

But data, the way it works and the responsibility of each party determines whether efficiency is maintained.

With HRT, an optimal project is considered complete only when the system still meets requirements, results are verifiable and the operation team is qualified to take over.