Technical VRV Air Conditioning System Errors to Avoid
Machine-translated from Vietnamese. Read the original in Vietnamese

Summarize common technical errors of VRV air conditioning systems, causes, consequences and control solutions to help the system operate stably, economically and sustainably.
VRV air conditioning system error is not just a device
What is VRV Air Conditioning System Error?
Central air conditioning system VRV / VRF is capable of connecting multiple indoor units, adjusting capacity flexibly and controlling temperature independently by each area. Therefore, VRV is commonly used in offices, hotels, villas, commercial centers and many high-end projects.
However, the effectiveness of a VRV system does not depend solely on the quality of the outdoor unit or indoor unit.
In fact, many of the problems arise from the process itself. Design – Construction – Inspection – Commissioning.
A pipe of the wrong size, a leakage weld, improper insulation layer or incorrect wiring can all reduce the efficiency of the whole system.
So instead of just asking:
“What brands of VRV equipment do you use?"
Project owner should be interested in:
“How is the system designed, constructed and commissioned?"
5 groups of VRV air conditioning system failures to control
Common VRV errors can be divided into 5 main groups:
Design & selection → Pipeline & media → condensate & thermal insulation → Electricity & control → Commissioning & handover.
Each group has the ability to directly affect cooling capacity, power consumption, stability and system life.
Group 1: Immediate errors in design and selection of VRV systems
A good HVAC system must be right from the design stage.
Errors at this stage are often difficult to correct after the construction is complete because of equipment location, pipeline route and MEP coordination.
Wrong copper pipework size selection
The fluid pipeline connects the entire outdoor unit and indoor unit of the VRV system.
If pipe diameter is selected according to experience instead of according to equipment data, it may occur:
- The distribution of the solvent is unstable.
- Indoor unit end of line lacks capacity.
- Abnormal operation pressure.
- System performance decreases.
- Compressor must work in an incomplete state.
The selection of pipelines must be based simultaneously on:
Device model + connecting capacity + pipeline length + high differential + splitter location + manufacturer requirements.
Indoor unit layout is not suitable for the function
Do not place the indoor unit simply according to the vacancy of the ceiling.
A good equipment location should consider:
Room function, thermal load distribution, wind supply direction, wind return direction, user location, ceiling architecture, interior and maintenance capabilities.
If the layout is not reasonable, the following may occur:
Subcooling – overheating – direct wind blowing on people – poor wind return – difficult to maintain.
Therefore, HVAC system needs to coordinate with architecture, interior, electricity, fire protection and MEP subjects right from the design stage.
Outdoor unit lacks cooling space
Outdoor unit VRV must discharge a large amount of heat to the environment.
If multiple outdoor units are located in a narrow space without analyzing air flow, hot winds can be drawn back to the unit.
When the air temperature in the outdoor unit rises:
Cooling capacity decreases → operation conditions change → system performance decreases.
Therefore, the outdoor unit position must simultaneously meet:
Ventilation + cooling + technical distance + maintenance space + equipment replacement transportation capacity.
Group 2: Pipeline and refrigerant faults
These are the groups of errors that have a huge impact on the operational capabilities of VRV systems.
Copper pipework is not clean – dry – sealed
During the construction process, common errors include:
The pipe is dented when bending, the pipe end is left open, dust or moisture gets into the pipeline, the weld does not reach, and the actual pipe gland changes but is not updated.
HRT principles for fluid pipeline are:
CLEAN – DRY – GOOD
After installation must be sequential control:
Testing → leak testing → vacuum evacuation → Vacuum retention test → Filling the solvent/opening the valve → commissioning.
Wrong Fitting Gas Divider
The gas splitter is responsible for distributing the solvent to the indoor unit branches.
Errors may appear when:
Wrong splitter model, wrong mounting direction, inappropriate gap between splitters or unsealed splitter thermal insulation.
The consequence may be that the media distributes unevenly, causing some branches to operate at incorrect power.
The splitter should be installed in the correct piping diagram and technical documentation of each VRV system.
No full leak testing
A VRV system has many connection points:
Solder joints, flare, gas splitter, indoor unit connector, outdoor unit and repair points.
A small leak can cause the system to:
Cold weak → long run → power surge → error alarm → continued lack of solvent.
A principle that should be especially noted:
Don't just add more gas until you can figure out what's causing the lack.
The correct process should be:
Find leakage point → handle → leak testing again → vacuum evacuation → test → replenish the right amount of solvent.
Vacuum evacuation failed
Vacuum evacuation aims to remove air and moisture that remains in the pipeline.
Some common errors:
Suction is too fast, do not use suitable measuring device, do not check the ability to keep vacuum or open the outdoor unit valve immediately after suction.
For HRT, the criteria are not:
“How many minutes did you smoke?"
It is:
“How much vacuum is reached and can the system keep a vacuum?"
Moisture residual in the pipeline can affect refrigerant, pressure, heat exchange efficiency and compressor stability.
Load the fluid by feeling
VRV is not a system, so refrigerant charging feels like “not cold yet, add more".
The amount of additional solvent must be determined from:
Model outdoor unit + system configuration + pipe diameter + actual pipe length + manufacturer requirements.
Lack of media reduces power.
Excess solvent also does not make the system colder, which can cause the system to work outside of optimal areas.
Group 3: thermal insulation and condensate – small errors but big consequences
Many VRV systems are cooling normally but after a few months, small water, moisture or mold appear in the ceiling.
The cause is usually the insulation and condensate.
Thermal insulation is open
Locations with high condensation risk include:
Thermal insulation joints, gas splitters, indoor unit connections, wall-piercing, ceiling-piercing and other thermal insulation segments that are squeezed or torn.
Thermal insulation should ensure:
The right material – the right thickness – airtight – continuously.
A small gap in the insulation can create a condensation point, causing water to drip down the ceiling.
Condensate line wrong slope
Common errors include:
The pipe is sagged, lacks slope, the outlet is clogged, the connection is not sealed, or the condensate pump is working improperly.
A common mistake is to test condensate only after the ceiling has been closed.
HRT recommends:
Test condensate before closing ceiling.
Each indoor unit needs to be tested for actual drainage capacity before completing the construction.
Group 4: Electrical, control and communication VRV
VRV is an air conditioning system but also a control network.
Linkable Components:
Outdoor unit ↔ indoor unit ↔ Room control ↔ Central controller ↔ BMS.
So electrical or communication failures can cause the whole system to fail.
Wrong Communication Wiring
Some phenomena may appear:
Outdoor unit does not receive enough indoor unit, some staging does not work, communication or commissioning error system is not complete.
Before power supply, the technician must check:
Terminal + topology + communication diagram + device address.
Inappropriate signal wiring
If the signal wire is near energized power lines or jamming sources but not handled properly, the system may develop difficult - to - trace errors:
Running - error - disconnection - error appears and then disappears.
Therefore, the cable spacing, anti-interference, earthing and wire types requirements must be complied with.
Commissioning power supply not checked
Before commissioning need to check fully:
Voltage, CB protection, wire cross-section, earthing, phase order if applicable, terminal connection, outdoor power unit and indoor power unit.
Do not run the system just because “the engine is finished”
Mechanical – electrical – control must meet the same requirements before commissioning.
Group 5: Incomplete commissioning
One of the biggest mistakes is to view VRV commissioning simply as:
“Turning on the cold machine is reached”
In fact, that's just the beginning.
Do not check the whole indoor unit
A VRV system may have tens or hundreds of indoor units.
Just checking a few representative rooms is easy to miss errors at:
Line end units, long pipelines, less used rooms, outdoor units or equipment located on a separate communication line.
The principle before handover must be:
100% of equipments are tested and confirmed the status.
What does Commissioning have to check?
It's not just room temperature.
Need to evaluate:
Device → Control → Communication → condensate → operating parameters → Error code → Load-changing capability → Stability when continuous operation.
A satisfactory system does not only need to be “cold”, but must:
Correct cold – stable running – correct control – good drainage – energy saving.
HRT process controls VRV errors from the beginning

HRT approaches the VRV system in a sequence of controls throughout:
Survey → Load Analysis → Equipment Selection → Design
First, it is necessary to understand the right functions, thermal load, use requirements and construction conditions.
Separation → Shop Drawing → Construction → QC
From design to deployment drawings, volume and construction quality control process.
Leak testing → vacuum evacuation → Load the solvent
Quality control of pipeline system before introducing solvent into operation.
Commissioning → acceptance testing → Handover → maintenance
Check the entire system in real operation conditions, complete records and maintain efficiency throughout the life cycle of the work.
The HRT message throughout is:
Take control right from the start so that problems don't occur.
Quick checklist before handing over VRV system
Before acceptance testing, the following groups should be confirmed at least:
Piping: the right size, the right splitter, no leakage.
Vacuum & Refrigerant: vacuum evacuation reached, the amount of solvent right.
Insulation: vapor-tight, no tearing, no condensation.
Drain: enough slope, water test reach.
Electrical: source, protection and right grounding.
Communication: correct terminal, no communication error.
Outdoor Unit: good heat dissipation and enough maintenance space.
Indoor Unit: right location and convenient maintenance.
Commissioning: 100% of equipments are tested.
Why does VRV system need experienced HVAC contractor?
The quality of VRV is not determined by an individual device.
The final result is the sum of:
Design + Equipment + Materials + Construction + QC + Commissioning + maintenance.
An experienced contractor will spot conflicts right on the drawings instead of fixing errors after closing the ceiling.
This is especially important with:
Hotels, offices, shopping malls, luxury villas, hospitals and other buildings with complex MEP systems.
HRT – general contractor for air conditioning and ventilation solutions
HRT deploys HVAC systems in series:
Consulting – Designing – Supplying – Executing – TAB/Commissioning – acceptance testing – maintenance – Optimizing.
For VRV/VRF systems, HRT focuses on controlling the key factors from the beginning:
Design piping, equipment selection, gas splitter, leak testing, vacuum evacuation, solvent, thermal insulation, condensate, electricity, communication and commissioning.