HVAC contracting for factories, buildings and shopping centres

Machine-translated from Vietnamese. Read the original in Vietnamese

General contractor HVAC For Factory, Building And Mall

HVAC general contractor solutions for factories, buildings, commercial centers in the direction of synchronization Air conditioning – ventilation – IAQ – Energy saving, helping the operation of works stable, efficient and sustainable.

What is HVAC general contractor?

HVAC stands for:

Heating – Ventilation – Air Conditioning

In the majority of projects in Vietnam, HVAC range focuses on:

Air conditioning – ventilation – Air treatment – Control – Energy saving.

A general HVAC contractor can participate throughout the project life cycle:

Survey → Consulting → Design → Separation → Quotation → Supply → Construction → TAB → Commissioning → acceptance testing → Handover → maintenance → Optimization.

The biggest difference of the general contractor model is that there is a unit responsible for overall efficiency of HVAC systeminstead of each contractor taking charge of an individual part.


Why should large projects have a general contractor HVAC?

Factories, buildings and shopping malls all have many areas with different thermal loads, densities of people and operation times.

With factory

A plant can simultaneously exist:

  • Production area.
  • The office.
  • Kho.
  • Technical dept.
  • Packing area.
  • Heat emission area.
  • Dust generation zone.
  • Areas to control temperature and humidity.
  • Cleanroom or special technology area.

If the HVAC design does not understand the manufacturing process properly, the system is easy to be underloaded, overloaded or operation inconsistent with technological requirements.

With office building

A building needs to balance:

  • Thermal comfort.
  • Outdoor air.
  • CO₂.
  • Noise.
  • Partitioning.
  • Controls.
  • Save electricity.
  • Maintenance capability.

Just because the room is at a satisfactory temperature doesn't mean that the air quality is satisfactory.

With a business center

The cooling load of the commercial center is constantly changing according to:

  • Guest density.
  • Time of day.
  • Retail area.
  • The restaurant.
  • Supermarket.
  • Amusement park.
  • Lobby.
  • The hallway.
  • Areas with regular openings.

HVAC system needs to be able to adjust flexibly according to actual load.


HRT builds HVAC solutions in 4 layers

HRT approaches the system in series:

Cooling → Ventilation → IAQ → Energy Saving

general contractor HVAC

Cooling – Air conditioning and cooling

This is the part responsible for creating and distributing cooling capacity.

Depending on each project, HRT can study the following systems:

  • VRV/VRF.
  • Water Chiller.
  • AHU.
  • FCU.
  • PAU.
  • Packaged.
  • Rooftop.
  • Other industrial air conditioning systems.

The choice is not based solely on capacity or equipment price.

It is necessary to consider simultaneously:

Cooling load + operation time + partition + scalability + maintenance + power + life-cycle cost.

Ventilation – ventilation

Air conditioning and ventilation are two closely related but irreplaceable problems.

Ventilation systems may include:

  • Outdoor air level.
  • Suction the exhaust.
  • Vacuum.
  • Vacuum the heat.
  • Suck the smell.
  • Ventilation of workshops.
  • Fan level – suction.
  • Air duct.
  • Air outlet and accessories.

If too much outdoor air is supplied, cooling load may increase.

If the level is too little, indoor air quality deteriorates.

So the two systems must be calculated synchronously.

IAQ – indoor air quality

IAQ stands for Indoor Air Quality.

In addition to temperature, the quality of the indoor environment is also affected by:

  • CO₂.
  • Dust.
  • Smells.
  • Moisture.
  • Vi sinh.
  • Pollution in the air.

Solutions may include:

  • ERV/HRV.
  • Air purification.
  • Remove odors.
  • Control CO2.
  • Control the humidity.
  • Specialized air purification systems.

Energy Saving – Energy Efficiency

A system that's already running may not be working.

HVAC optimum directions can include:

  • Adjust your setpoint.
  • Optimize the operation schedule.
  • Load - driven control.
  • Optimize Chiller.
  • Optimize water flow rate.
  • Optimize airflow rate.
  • TAB.
  • Commissioning.
  • Retrofit.
  • Heat recovery.
  • ERV/HRV.
  • BMS.
  • Monitor your power.

This is the solution layer that directly affects the long-term operation cost of the work.


HVAC system selection should not start from the question “Chiller or VRV?”

This is one of the things to look for.

It is not recommended to choose the system only because:

“This project is big so use Chiller”

Or:

“Easy-to-use VRVs should be used"

Before making a choice, it is important to answer some important questions.

How many hours per day does the work operate?

An office that operates 8–10 hours a day has a completely different problem than a factory that operates 24/7.

Are the zones active simultaneously?

If the load varies drastically between areas, partitioning and control capabilities will greatly affect system selection.

What parameters should the construction be controlled?

Not only temperatures but also:

  • Moisture.
  • Differential pressure.
  • CO₂.
  • Dust.
  • Smells.
  • Cleanliness.
  • Airflow rate.

How is maintenance possible?

The design needs enough space to:

  • Replace the filter.
  • Clean the coil.
  • Thay motor.
  • Approach the valve.
  • Remove the FCU.
  • Maintenance AHU.
  • Repair your pipes.

A beautiful design on the drawing but can not convenient maintenance will create huge cost when operation.


What does a general contractor for HVAC factory need to care about?

For industrial buildings, HVAC is sometimes part of the manufacturing process.

Solution can combine:

Chiller / VRV-VRF / Packaged / Rooftop → AHU / FCU / PAU → Ventilation → Exhaust → Filtration → Control

But each industry has different requirements.

For example:

  • Electronics factory other mechanical factory.
  • Food factory other plastic factory.
  • Warehouse logistics other production line.
  • The office area is different from the heat generator area.

So there is no single configuration that applies to all plants.

The first principle remains:

Understand the right technology → Understand the right load → Understand the correct operation → Choose the right solution.


General contractor HVAC for buildings that need stability and flexibility

Common solutions in the building include:

  • VRV/VRF.
  • Chiller.
  • AHU.
  • FCU.
  • PAU.
  • ERV/HRV.
  • Outdoor air system.
  • CO2 sensor.
  • BMS.

For the work in operation, some problems often appear:

  • The room is unevenly hot and cold.
  • Lack of outdoor air.
  • The water system is out of balance.
  • AHU/FCU performance degradation.
  • Winds are not as designed.
  • Electricity is increasing.
  • Setpoints are irrational.
  • Multiple closing devices.

In this case, a complete replacement of the device may not be your first choice.

Should be deployed:

Measurement → Cause analysis → TAB → Commissioning → Retrofit as needed → Tracking results.


General HVAC contractor for commercial centers needs special attention to load variation

A mall can shift loads very strongly in just a few hours.

For example:

In the morning, there are fewer visitors.

The F&B area was overloaded at noon.

In the evening, the density of people increased sharply.

Weekends reload different days.

HVAC needs to be able to operate according to actual needs.

The system usually incorporates:

Chiller or VRV/VRF → AHU/FCU → PAU → outdoor air → Exhaust → ERV/HRV → BMS

Specialty:

  • F&B area needs to absorb odors and repel air.
  • The lobby needs to handle a large number of people.
  • Retail area needs thermal comfort.
  • Sanitation area needs pressure control and exhaust.
  • Technical department needs proper ventilation.

The 9 step process of deploying general contractor HVAC at HRT

HRT organizes the project in a sequence throughout rather than starting right from the equipment offering.

general contractor HVAC

Step 1: Survey of the project

Survey:

  • Architecture.
  • Functional.
  • The ground.
  • Installation conditions.
  • The MEP system is present.
  • Request operation.

For renovation works, it is necessary to measure more actual data.

Step 2: Determine HVAC Requirements

Clarification:

  • The temperature.
  • Moisture.
  • Outdoor air.
  • Number of people.
  • Time of operation.
  • IAQ.
  • Technology requirements.

Step 3: Calculate and select a solution

Analysis of options:

  • VRV/VRF.
  • Chiller.
  • Packaged.
  • Rooftop.
  • AHU/FCU/PAU.
  • ERV/HRV.
  • Ventilation.
  • Air purification.
  • Controls.

Step 4: Design and coordinate MEP

HVAC should coordinate with:

  • Architecture.
  • Structure.
  • Electricity.
  • Water supply and drainage.
  • PCCC.
  • BMS.
  • Technology system.

Early coordination helps reduce conflicts when construction.

Step 5: Separate and optimize costs

Don't just look at the appliance rack.

Need to see the overall:

Investment cost + Construction cost + Operation cost + Maintenance cost.

Step 6: Construction and quality control

Construction according to:

  • Technical documents.
  • Shopdrawing.
  • QC process.
  • Standard acceptance testing.
  • Materials control and installation.

Step 7: TAB and Commissioning

System should be tested:

  • Airflow rate.
  • Water flow rate.
  • The temperature.
  • Thermal gap.
  • Pressure.
  • Controls.
  • Ability to respond to loads.

Step 8: acceptance testing and handover

Includes:

  • Check the operation conditions.
  • Acceptance testing.
  • Operation manual.
  • Hand over the file.

Step 9: Warranty – maintenance – optimization

After handover, HVAC needs to continue to be:

  • periodic maintenance.
  • Monitor your performance.
  • Manage incident risk.
  • Optimize operation.
  • Assess your power.

HVAC investment costs must be looked at by life cycle

An HVAC option with a lower purchase price can cost more over 10 or 15 years of operation.

Should be evaluated according to:

CAPEX + OPEX + Maintenance + Lifetime

Where:

  • CAPEX: initial investment capital.
  • OPEX: operation costs.
  • Maintenance: maintenance costs.
  • Lifetime: mining life cycle.

For example, a system with a higher initial investment price but lower power consumption, fewer breakdowns and easier maintenance can yield a far better total cost of ownership.

So instead of asking:

“Which option is the cheapest?"

Project owner should ask:

“What is the most effective solution for the entire life cycle of the building?"


ESG GREEN HVAC is not just about the device

A high - performance unit is not enough to create a green HVAC system.

Operation string must be synchronized:

Right design → Right selection → Right construction → Right calibration → Right control → Right operation → Right maintenance.

When done well, HVAC systems can contribute to:

  • Reduce your electricity consumption.
  • Reduce waste.
  • Improve your IAQ.
  • Improve your work environment.
  • Extend equipment life.
  • Increase operational control.
  • Supporting the sustainable development goals of enterprises.

This is also the foundation of orientation:

HRT – ESG GREEN HVAC.


The works that are suitable for general contractor HVAC HRT solutions

HRT can access groups of works such as:

  • Production plant.
  • Industrial factory.
  • Industrial park.
  • Kho logistics.
  • Office building.
  • The mall.
  • Supermarket.
  • Showroom.
  • The hotel.
  • Resort.
  • Service works.
  • Existing buildings need HVAC renovation.
  • The project needs to optimize energy.
  • The system needs TAB and Commissioning.

Why does the project owner need a unit that can see the entire HVAC system?

In a project, the Chiller may be right but the Pump is wrong.

AHU may be correct but airflow rate is wrong.

Air duct can be beautiful but the pressure is not enough.

ERV may be good but pressure head selection is inappropriate.

BMSs may be modern but the control strategy is not optimal.

So the value of a general contractor HVAC lies in its ability to connect all parts into one complete system.

From:

Cooling → Ventilation → IAQ → Control → Energy

All of this has to work as a single system.


HRT – general contractor HVAC towards long-term operation efficiency

HRT is oriented to accompany project owners throughout:

Consulting → Design → Supply → Construction → acceptance testing → operation → maintenance → Optimization.

The end goal is not just to complete an HVAC system.

The goal is to create a system that:

Efficiency – Stability – Safety – Savings – Sustainability.