VRV air conditioning maintenance needs to start from the actual problem of the work and end with the verifiable result. CEO Đoàn Văn Hoàng – HRT share how to define scope of work, prioritize risks, control costs and evaluate quality after maintenance.
VRV air conditioning maintenance: Cost control, active operation risk

Before signing a VRV air conditioning maintenance contract, the project owner often asks: “How much does it cost for one implementation?”
But there's a more important question:
After this maintenance, what issues will be solved and what to take to confirm the results?
A “all equipment cleaned" record does not answer whether the room is in good condition, how much old faults have been dealt with and what items still need to be monitored.
Periodic maintenance plays a role in maintaining the equipment status, detecting problems early and supporting operation cost control. However, the value of the work should not be judged solely by the number of machines cleaned. Daikin
From the management perspective of CEO Đoàn Văn Hoàng – HRT, it is necessary to move from ordering by operation to managing by results:
Identify the right problem. Deliver to the right scope. Check the right data. Follow up until conclusions are reached.
Determine goals before planning VRV maintenance
It is not recommended to start a maintenance cycle with an existing list of tasks and apply it the same way to all projects.
HRT proposed project owner clarify the three goals from the beginning.
Maintain agreed conditions of use
It is necessary to identify which areas are not meeting the requirements and when the phenomenon occurred.
Instead of “room not cold enough”, it should be specifically described: meeting rooms do not reach the required temperature when using sufficient space; the western area is hot in the late afternoon; or an indoor unit group often stops unexpectedly.
This description helps the engineering team have clear questions to check, instead of just getting a generic request for “servicing the machine".
Reduces malfunctions affecting operations
Project owner should agree on priority areas, time allowed to stop the system and the focal point of decision when detecting damage.
An item serving an important area needs to have its own treatment plan. It is not recommended to have all equipment arranged at the same priority level by default just because they are under the same contract.
Transparency of costs and responsibilities
Each task should be identified as part of the periodic maintenance, repairs arising or renovation out of scope.
Detecting additional problems does not mean being automatically replaced components.
The arising proposal should state the current status, technical bases, handling plans and costs for the project owner to consider before deployment.
Surveying the current status: Finding causes before intervention
Record how the system is operating
VRV uses variable fluid flow rate control and can serve multiple air conditioning zones. Therefore, the assessment should be placed in the context of the system operation, not only observed separately an indoor unit. Daikin
Before cleaning or adjusting, the status quo should be documented including equipment code, service area, operation mode, temperature setting, time of occurrence of phenomenon and related repair history.
For works with electricity data or central control, it is necessary to save information before intervention. This data will be used as a basis for comparison later.
Turn user reflection into test request
Survey information may be organized according to the following table:
| Initial reflection | Information to add |
|---|---|
| Room does not reach temperature | Time, number of users, real temperature measured, door status and air conditioning mode |
| Indoor unit appearance water dripping | Location, time, operation conditions and scene photos |
| Abnormal stop device | Error code, time, scope of influence and executed operation |
| Increased power | Time interval, operation hours, change of power and meter data |
This table is a collection tool, not a conclusion table.
A phenomenon that needs to be tested with data before it can be resolved.
Prioritize safety ahead of schedule
When there are signs such as burning smell or electrical abnormalities, must handle according to the safety instructions of the equipment and contact the professional unit. Do not continue operation only to complete the use schedule. The inspection and in-depth repair work should be carried out by qualified personnel. Daikin
Four technical groups to control when maintaining VRV air conditioner

Heat Exchanger And Wind Line
The scope of inspection should cover filters, heat exchange surfaces, fans and air circulation conditions. These are also the contents that appear in Daikin's maintenance VRV form. my.daikin.eu
Project owner should request a report showing the status before and after the processing, rather than just confirming “cleaned".
For areas where there is a reflection of cooling capacity, it is necessary to spend time checking again under suitable use conditions. The completion of cleaning should not automatically be considered as having resolved the customer's reflection.
Condensate and insulation
Condensate drainage, trays and other locations where condensation is at risk should be checked. With equipment with condensate pumps, the scope should include relevant functional testing according to model instructions. Daikin documentation requires confirmation of smooth drainage and control of pipeline insulation. Daikin
Regarding work management, each processed point should have a clear identification location, status image and re-test results.
It is not recommended to close a “water run-out treatment” request only with the photo outside the dry indoor unit.
Refrigerator circuit
Do not load the solvent by default during maintenance.
The Daikin operation manual states that the fluid in the system is normally leak-free. When a leak is detected, it should be handled and verified by a qualified personnel before further use. Daikin
If the amount of the solvent should be intervened, it should be based on the actual configuration and manufacturer's procedure. VRV installation documentation should provide instructions for determining the amount of addition according to the pipeline and controlling the fill volume; a common pressure value should not be used to replace this procedure. Daikin
For arising dossiers, the reasons for intervention, jobs performed, types and quantities of used substances and post - treatment inspection results should be clearly inscribed.
Electrical, control and data operation
Electrical connections and operating status should be checked in accordance with the equipment. Maintenance should not be limited to mechanical parts; Daikin's technical services also include system diagnostics and testing reports. my.daikin.eu
For projects with central controllers or building management connections, project owners should include reviewing operation schedules, settings and control feedback into the agreed scope.
Any changes to settings should be recorded: what changes were made, why, who made them and the results of the tests. It is not recommended to hand over the system with a new configuration but lacking information to the operation team.
Schedule VRV maintenance according to the conditions of use
Don't take a single cycle and apply it to your entire system.
Daikin documents note that it is necessary to consider shortening maintenance cycles when equipment is working in dusty, salt-vapor, adverse environments, long operation times or frequently shut down. Daikin
HRT proposed to build the plan in two layers.
Periodic work class is prepared based on equipment documentation, construction requirements and scope of contract. This class ensures that necessary items are not neglected.
Checking class by status added from reflection of usage, fault history and results of previous checks.
For example, when an area is constantly experiencing the same phenomenon, it is necessary to open a request to check the cause instead of just waiting for the next cleaning.
On the contrary, changing cycles should be grounded. Do not extend the maintenance distance yourself just because the device has not reported errors.
The maintenance schedule is a plan that needs to be updated, not a form that you sign once and then use forever.
Acceptance testing after maintenance: Requires proof, not just signatures
Unify the output profile before implementation
Project owner can organize handover documents in four groups:
| Group profile | Suggested content |
|---|---|
| Scope of implementation | Code of equipment, location, work done and item not yet done |
| Testing results | Parameters, measurement conditions, time and performer |
| Interventions Arise | Components, supplies, substances or installations have changed |
| Job Open | Existing problems, persons in charge, deadlines and ways of confirming completion |
The key to controlling is retrieval: when the phenomenon returns, the operation team can know what it checked last time and what conclusions it draws on.
A report that only states “normal operation” but does not state the scope, conditions and test results will be difficult to use for the next evaluation.
Distinguish work completion from problem solving
It is possible to complete the entire hygiene item in the contract but the feedback of users has not been resolved.
In that case, the minutes should clearly state two states:
Scope work is completed. Operational issues still need further investigation or resolution.
Don't equate two things to close your application early.
For the work to be monitored after handover, it must be agreed on the time of monitoring and the person who confirms from the beginning.
Testing power in comparable conditions
To assess electricity savings, weather, usage, loads, and operation schedules should be taken into account. The U.S. Department of Energy's Verification and Measurement Guidelines also require consideration of these factors when adjusting background data to determine savings. The Department of Energy's Energy.gov
Therefore, the decrease in electricity bill after maintenance is not enough to attribute the entire reduction to the work just done.
Example illustration, not HRT project figures:
Assuming the expected power according to the adjusted background data on conditions of assessment period is 12.000 kWh, while the actual electricity is 10.800 kWh. The corresponding difference is 1.200 kWh, i 10% compared to the adjusted background level.
This figure is only meaningful within the measurement range and the stated assumptions. If there are simultaneous changes to the operational schedule, installation temperature or usable area, the report must clarify the effect of such changes before making a separate conclusion on maintenance efficiency.
Control costs with a clear work scope
To compare VRV maintenance quotes, it is recommended to ask for the same range offering units before comparing totals.
HRT proposes clarifying three groups of costs.
Periodic maintenance costs: Specific works on each type of equipment, access conditions, time for implementation, requirements for protection of the site and handover dossier.
Repair costs incurred: Intensive diagnosis, repair, component replacement or environmental intervention beyond routine scope. This group needs its own browser mechanism.
Cost of inspection and post - treatment monitoring: The re-examination, data collection or additional assessments have been agreed upon by the two parties.
Also specify the unincluded part, such as ceiling opening and return work, special access equipment, or off - list repairs.
A clear quotation of exclusions is more useful than a “package" commitment but does not define the boundaries of responsibility.
Before making a selection, check your ability to provide documentation, work plans and how to handle the work that still exists. These are the things that should be included in the evaluation along with the offer price.
CEO view Đoàn Văn Hoàng: Each maintenance must create a clear conclusion

From the perspective of my technical and business executives, I don't want my customers to end up with more questions than they started with.
What is the system in place? What problems have been solved? What has not been completed? Where should the next budget be devoted?
Maintenance reports must help answer those questions.
Understand the Right: Identify the problem before proposing a solution
Don't start with a list of parts to replace.
Let's start with the phenomenon, conditions of occurrence, test data and conclusion bases. For insufficient information, it is necessary to specify what to check further.
Clear: Every job has a scope and who is responsible
Project owner needs to know what content he or she is spending money on.
The techs need to know what to deliver.
Operations needs to know how to keep track.
Clarity should be on file, not just in the exchange at the scene.
Dedication: Do not leave the work without conclusions
Being committed doesn't mean committing to getting everything done right.
Being committed to informing your limits, coming up with a plan, and keeping an eye on the open work until you reach a conclusion.
Do the right thing today, and help your clients know what to do next.
Frequently Asked Questions About VRV Air Conditioner Maintenance
What if the room still doesn't reach the temperature?
Request the engineering unit to follow up with the correct system guidelines, rather than by default continuing cleaning or adding a cleaning agent. The report should separate the completed work from the unknown cause; system diagnosis is a separate technical scope in service operations. Daikin
Can internal operation personnel maintain themselves?
Only perform what is permitted by the equipment documentation and has been safely instructed. For example, the Daikin FXFA documentation allows users to clean some external parts, but requires professional maintenance done by a qualified unit. This permission should not be extended to all models. Daikin
When should major repairs or renovations be considered?
A separate review should be initiated when the problem continues to recur, the work function has changed, or the scope of work beyond normal maintenance.
HRT recommends comparing the options according to their ability to meet the requirements of use, investment level, time of interruption, operation cost and remaining limitations. It is not recommended to decide to replace the entire system from only one test lacking data.
Actively manage VRV system with HRT
Before the next maintenance, prepare a list of equipment, fault history, latest reports and a list of areas that are reflected.
From this information, the project owner and the technical unit can agree on the scope of testing, priority order, acceptance testing conditions and subsequent processing plan.
Do not just schedule the cleaning of equipment. Aim to control the system.