VRV Air Conditioning Construction

Machine-translated from Vietnamese. Read the original in Vietnamese

VRV Air Conditioner Construction

A good VRV system needs to be controlled synchronously from design, equipment, pipeline, condensate, insulation, electrical control to leak testing, vacuum evacuation and commissioning.

Construction of VRV air conditioners is not only installed outdoor unit and indoor unit

A central air conditioning VRV system may consist of dozens of indoor units connected to one or more outdoor unit clusters.

This means that even a small error in the copper pipework, gas splitter, condensate, insulator or control wire can affect an entire area of the building.

There are actually systems that after installation still run, still have cold but after a while appear problems such as:

  • Lack of cold or uneven cold.
  • Leakage of the solvent.
  • Flowing water to the ceiling.
  • Report communication errors.
  • Outdoor unit poorly cooling.
  • High power consumption.
  • Difficult to access when maintenance.
  • Life expectancy compressor decline.

So HRT does not simply assess the quality of VRV by “turn on the cold machine”, which controls the entire deployment lifecycle.


5 workgroups that determine the quality of a VRV system

Instead of just looking at VRV construction as individual steps, it is possible to divide the entire process into 5 main control groups:

Group 1: Survey – calculation of load – selection of solutions

This is the stage that determines whether the system was chosen correctly from the start.

Group 2: Design – Shop Drawing – MEP coordination

Solve equipment location, ceiling space, pipeline and technical conflicts before construction.

Group 3: Installation of equipment and piping systems

Including outdoor unit, indoor unit, copper tubing, Refnet, condensate, thermal insulation and electrical system.

Group 4: QA/QC – leak testing – vacuum evacuation

This is the stage of controlling cleanliness, airtightness and quality of pipe networks.

Group 5: Installation – commissioning – commissioning – handover

Make sure that the system is not only running, but that it is operating as designed.


Phase 1: Survey and determine actual cooling load

Survey is the foundation before any VRV option.

The engineer should identify:

  • Area and height of each area.
  • Room function.
  • Number of users.
  • Sunlight direction and glass area.
  • Heat source from the device.
  • The amount of outdoor air.
  • Time of operation.
  • Requires independent control.
  • Equipment layout space.
  • Conditions of transportation and maintenance.

Should not choose VRV power only by area

Two rooms of the same 50 m2 area do not necessarily have the same cooling load.

Large meeting rooms, with lots of glass and electronics, are loaded with other things than small offices.

Therefore, applying a single coefficient of W/m2 may result in underload or overload.

The goal of the load calculation is to find capacity suitable for actual using condition, not to choose the device as large as possible.


Stage 2: System design and Shop Drawing implementation

After determining the cooling load, the engineer selects the appropriate outdoor and indoor unit configuration.

Shop Drawing drawing must fully show:

  • Outdoor unit location.
  • Location of each indoor unit.
  • Gas pipeline and liquid pipeline.
  • Diameter of each section.
  • Refnet/Y-branch position.
  • Condensate glands.
  • Electrodynamics.
  • Communications cable.
  • Controller.
  • The rack.
  • Installation pitch.
  • Maintenance visit door.

MEP coordination before construction

VRV does not exist independently in the technical ceiling.

Pipelines should coordinate with:

Systematic Content to control
Architecture and Ceiling, wall, door visit
Structure Beam, floor, penetration position
PCCC Sprinkler, Fire Alarm
Electricity Cable tray, electrical cabinet
Ventilation Air duct, outdoor air, exhaust
Water Supply and Drainage Condensate drainage
Interior Design Lamps, Ceiling And Finishes

Principle: conflict resolution on drawings is always more effective than processing after construction.


Stage 3: Inspection of materials and equipment before installation

Before putting equipment into the works, it is necessary to compare:

  • Model.
  • Capacity.
  • The number.
  • Accessories.
  • Refnet.
  • Controls.
  • Type of copper tubing.
  • Thermal insulation.
  • Electrical wires and communication wires.

Copper pipework must be kept clean

The unused end of the tube should be sealed.

Dust, water or moisture entering the refrigerant pipeline network can directly affect the long - term reliability of the refrigeration system.

Simply put:

A clean refrigeration system must start from a clean pipeline.


Stage 4: Installing outdoor VRV unit

Outdoor unit must be located at:

  • Clear the air.
  • Good heat exchange.
  • Have enough technical distance.
  • Have a maintenance approach.
  • Strong stand or platform.
  • Take appropriate measures to prevent vibration.

Hot wind return should be avoided

When multiple VRV modules are placed close together, the hot air released can return to the inlet.

This phenomenon increases the temperature of air entering the coil condenser, from which it is possible:

  • Reduce your cooling down.
  • Decreased performance.
  • Increase the condensing pressure.
  • Effect on operation ability when high load.

Outdoor unit location should therefore be considered right from the design stage.


Stage 5: Install indoor unit

Indoor unit needs to be installed properly:

  • Location.
  • The pitch.
  • Wind supply direction.
  • Space maintenance.
  • Standard mount.

With concealed ducted indoor unit, in addition to cooling capacity must also control:

  • Static pressure.
  • Air duct supply.
  • Air duct return.
  • Acute mouth.
  • An ileum.
  • Pressure drop.
  • Noise.

Indoor unit right capacity but the wrong design wind line can still cause the room to lack cold or uneven temperature distribution.


Phase 6: VRV pipework copper construction

Copper tubing is one of the most important items of VRV system.

Engineer need control:

  • Pipe diameter.
  • Total length of pipe.
  • High gradient.
  • Length between splitters.
  • Length from Refnet to indoor unit.
  • Permissible limits of each model.

Do not arbitrarily change the diameter or gland of pipe outside the design.

Weld control

The weld needs:

  • Closed.
  • Clean.
  • Technically correct.
  • Limit the amount of oxide you create in the lumen.

After finishing the pipe network, must conduct airtightness test before vacuum evacuation.


Stage 7: Install Refnet/Y-Branch correctly

Refnet is responsible for distributing the solvent to the indoor unit branches.

Wrong Refnet at one location can affect the whole rear indoor unit.

Need Control:

  • The right accessory model.
  • The right size.
  • Correct installation direction.
  • Follow the proper posture as instructed by your technician.
  • Do not arbitrarily replace with other fabricated accessories.

Stage 8: Condensate construction

Condensate is one of the common causes of complaints after interior finishing.

Pipelines need:

  • Have the right slope.
  • No hammocks.
  • Do not create a water bag.
  • No backflow.
  • There is thermal insulation at the necessary locations.

For indoor unit using condensate pump, water lifting height limit of the equipment must be complied with.

Water should be tested before closing the ceiling

Checking the drainage when the ceiling is open is much simpler than dealing with leaks after the building is complete.


Stage 9: thermal insulation system

Thermal insulation helps:

  • Limit heat loss.
  • Prevent condensation.
  • Protect your pipeline.

Need to check carefully:

  • The insulator junction.
  • Refnet location.
  • Point through the wall.
  • Nearby indoor unit area.
  • Positioning, quail.
  • Thermal insulation points are squeezed or torn.

Even a small gap can create a heat bridge and cause water to pool.


Phase 10: Electrodynamics and VRV communication

VRV uses a control system that connects multiple devices.

Therefore, it is necessary to control:

  • Power supply.
  • Voltage.
  • Cross section.
  • CB guard.
  • Grounders.
  • Communications cable.
  • Terminal connection.
  • Network map.

Incorrect connections may cause the indoor unit to be unrecognized or the system to give communication errors.


Stage 11: leak testing of the pipeline

After finished the whole network copper tubing, need to check the airtightness.

Points to focus on:

  • The weld.
  • Connector.
  • Van.
  • Flare.
  • Refnet.
  • Other accessories.

If the pressure drops abnormally, the cause must be determined before proceeding.

Do not skip leak testing just to shorten the construction progress.

A small leakage after closing the ceiling can cause huge repair costs.


Stage 12: Vacuum evacuation VRV

Vacuum evacuation helps to eliminate:

  • The air.
  • Steam.
  • Moisture.

This is one of the most important steps in determining the reliability of your refrigeration system.

Do not just smoke for a fixed period of time and conclude the system reached.

Measurement and evaluation equipment should be used in accordance with the technical standards applicable to the specific system.


Stage 13: Calculation and loading of additional solvents

The amount of additional gas depends on:

  • Model outdoor unit.
  • Diameter of each section.
  • Actual length.
  • Configure the system.

The refrigerant charging must be based on technical calculations.

Do not load the liquid by feeling or relying solely on a pressure gauge.

Additional gas information should be saved in as-built documentation and commissioning.


Stage 14: Control system installation

After completing the electrical and piping, the technician proceeds to:

  • Recognize indoor units.
  • Check the address.
  • Check your remote.
  • Check the central controls.
  • Check communication.
  • Check for BMS if available.

All devices must be properly identified before the test run.


Stage 15: commissioning and commissioning

Commissioning isn't just about turning on the machine to see if it's cold.

Need to check simultaneously:

  • The temperature.
  • Airflow rate.
  • Condensate.
  • Noise level.
  • Vibration.
  • Controls.
  • Status error.
  • The operational capacity of each indoor unit.
  • System-wide operation capability.

For indoor unit connecting air duct, it is necessary to evaluate the ability to distribute wind at the feed mouth.


Checklist acceptance testing VRV system

Before handover, quick checklist can be checked as follows:

Equipment correct → copper tubing correct → Refnet correct → condensate well → thermal insulation sealed → Electricity correct → leak testing reached → vacuum evacuation reached → Gas correct → Controlling correct → commissioning reached → There is as-built documentation.

Also check accessibility of equipment during maintenance.

A good system can not be maintained conveniently, nor is it an optimal design.


8 common mistakes when applying VRV air conditioners

VRV air conditioner construction

1. Select the capacity according to the machine area

Bypassing people, glasses, sun-facing, equipment and outdoor air can lead to wrong cooling load.

2. Driving pipeline beyond technical limits

Length or height differences beyond the limit may affect the ability to distribute the solvent.

3. Uncooled weld

Increased risk of gas leakage and system contamination.

4. Refnet improper mounting

Affects the ability to distribute the substrate to branches.

5. condensate not enough slope

Can cause water stagnation, overflow and ceiling seepage.

6. Leakage of insulation

Causes condensation, small water and energy loss.

7. Leak testing or vacuum evacuation fails

Can directly affect the reliability and life of the system.

8. No space left for maintenance

The technician may need to remove the ceiling or furniture when repairs are needed.


A good VRV system needs 4 factors simultaneously

It is impossible to judge the quality of VRV based solely on the brand of the device.

A stable system needs:

Right Design + Right Materials + Right Construction + Right Commissioning.

Lack of one of the four factors can reduce the effectiveness of the whole system.


VRV deployment process at HRT

HRT controls projects in series:

Survey → Load analysis → Solution selection → Design → Separation → Shop Drawing → Equipment supply → Construction → QA/QC → leak testing → vacuum evacuation → refrigerant charging → Installation → commissioning → TAB/Commissioning → acceptance testing → Handover → maintenance & optimization.

The goal is that the system not only operates at the time of acceptance testing but also:

Stable – Economical – Easy maintenance – Sustainable.


Why choose HRT for VRV air conditioning project?

HRT provides HVAC solutions throughout from consulting to operation:

Survey – Design – Supply – Execute – acceptance testing – maintenance – Optimization.

Solutions are implemented for:

  • The office.
  • The hotel.
  • The factory.
  • The mall.
  • School.
  • The villa.
  • Commercial buildings.
  • Industrial buildings.

HRT aims to the principle:

Understand - Clear - Dedicated.

And the motto:

Right From the Start – Clear To the End – Green Sustainable.