VRV wiring faults: what to verify before switching on power
Machine-translated from Vietnamese. Read the original in Vietnamese

CEO Đoàn Văn Hoàng – HRT share the way of VRV electrical connection fault control from power supply, terminal, communication wire, grounding to cross check step before power supply and commissioning.
VRV power failure: Do not power on untested

Imagine a situation at the construction site.
Outdoor unit set. Indoor unit connected. Telecommunications team completed wiring. Progress awaiting commissioning.
One person said:
“Close CBs and check them out."
This is the moment I want the project team to stop.
It's not because the system is bound to fail.
It's because... powering is the moment when previous flaws begin to produce actual consequences.
A wrong terminal connection can affect communication. An incorrect connector can generate heat. A power source misplaced in the signal position can cause damage to electronic components. An incomplete earthing system can create safety risks.
The original HRT also indicates that the VRV electrical part is not only power supply. The system also has communication wires, grounding and protection devices; errors can lead to no start-up, no indoor unit reception, communication errors, CB impact or unstable operation.
In terms of operating HRT, I want to change the question from:
“Are you done yet?"
To:
“Is there enough grounds to supply the power yet?"
Before looking at the wire, confirm the correct device
One of the most dangerous mistakes on a construction site does not start with wiring.
It starts with an assumption:
“This model must be the same as the previous one”
I don't want the tech team working on memory like that.
The terminal position, terminal function and connection diagram may vary between devices. The original article HRT also emphasized to check in accordance with the actual model and wiring diagram, do not take the diagram of a similar device to apply directly when not confirmed.
So my first step is always to compare:
Model on device.
The corresponding wiring diagram.
Power required.
Power Terminal.
Communication Terminal.
Terminal relay.
Connection points of related accessories and controls.
Right wire, but wrong schematic is still wrong.
Don't look at a familiar symbol and fight the habit.
In some VRV systems, F1/F2 is used for transmission wiring between devices.
But I don't want the technician to see F1/F2 and then assume that all devices have the same connection.
Must check terminal function on the right diagram.
Especially with multiple outdoor units or central control, the communication network can have many branches and many different tasks. The original article HRT also warned that the communication terminal can take on different roles depending on the configuration.
Experience makes it faster. The right document makes the right decision.
I want the source and signal to be recognized as two different systems
One power cord and one communication cord can be located in the electric box area together.
But the task is completely different.
Power source carries energy.
Transmission wiring carries control signals and information between devices.
Without differentiation right from the construction, the risk of confusion increases very quickly when there are many teams working together.
This is why I want the string to be labeled at both ends.
Don't just write down a number.
I would like to know:
Where did the wire come from?
Go where.
What's the function?
Which device.
A mistake at terminal can turn into a control board error
The original HRT considered the introduction of power voltage into a communication terminal to be one of the most serious errors because it could cause electronic damage.
I want to control this error with process, not with personal care.
Before power supply:
Labeling → Diagram collation → Terminal validation → Cross checking → Newly powered.
If the system is large, the last checker should not be just the one who wired it.
A second set of eyes can detect what the performer is too used to doing and should miss.
The right rope but going the wrong way can still create problems

When talking about VRV electrical faults, people often think of the wrong wiring.
I want the tech team to look broader.
How is the wire organized?
Is the power and transmission arranged according to the requirements of the equipment?
Is the rope stretched?
Did it rub against the metal edge?
Is it fixed before going into terminal?
The original HRT note that power cords are capable of creating electromagnetic interference and the inappropriate power-communication arrangement may make the communication system unstable or difficult to diagnose when commissioning. It is also not recommended to use a fixed distance for all models that require comparison of actual equipment documentation.
That's how I want the project team to work.
Don't use one word of mouth for every building.
The line must be secured to the point of connection
I don't want to see wire going through the corrugated hole or edge of electrical box without proper protection.
A wire may be completely normal at acceptance testing date.
But vibration and friction for months can damage the insulation.
Then the error may appear as:
Electrical leakage.
Touch the shell.
Short circuit.
CB impact.
And when the problem is intermittent, it's much harder to find a cause.
A good line doesn't just have to be right at the terminal. It has to be protected across the entire line.
Do not select the wire cross section using the HP of the air conditioner

This is a habit I want to get rid of.
Cooling capacity is not the only data to decide wiring.
According to the original HRT article, wire selection must also take into account the equipment current, line length, current carrying capacity, voltage drop, installation method, ambient temperature, number of common wires and requirements of electrical design.
So when receiving a table of electrical supplies, I want to know the basis of selection.
Not only:
“This machine X HP should use Y wire”
I want the designer or the electrical person to explain:
What is the design line?
What is the length of the gland?
How is the pressure drop controlled?
What are the installation conditions?
Does the protective device coordinate with wires and equipment?
Impact CB does not mean CB must be larger
This is especially important.
If CB is frequently impacted, I don't want the first reaction to be to increase the rated current.
CB is reporting conditional systems to be tested.
Could be related to overcurrent.
Short circuit.
Electrical leakage.
Insulation failure.
Connection.
Or the device itself.
HRT also recommends changing the protective gear only when grounded in the design and specifications of the device.
The protective device does not cause problems just because it has detected the problem.
Terminal must be tight enough, not as tight as possible
I consider the terminal one of the most critical points to check before powering.
If Tightened Liquid:
Contact resistance may increase.
Temperature rises.
Oxidation junction.
Exposure continues to deteriorate.
The system may still run in the early stages, but the risk of heat emission increases over time. The original HRT article lists signs such as hot terminal, discolored cosine head, insulation deformation, burning odor or CB impact.
But the opposite is also not true.
Tight squeezing is not quality control.
Tightening beyond the required can deform the terminal, damage the cosine head, damage the thread or screw.
If the manufacturer specifies torque, I want the construction team to use the correct value of that terminal.
Do not take a familiar torque and apply it to the whole system.
The cosine and terminal must be a matching pair
I also want to check the quality of cos head.
Is there an extra copper core?
Is Cos the right size?
Does the wire bear direct force onto the terminal?
After squeezing, is the wire secured?
A good electrical splice must remain quality even when the equipment vibrates or when the maintenance person opens the electrical box later.
Grounding is not the category “with green and yellow wire is done”

When running progress, the construction team usually focuses on power and communication as these two parts determine whether the machine runs or not.
I want to check the grounding with the same seriousness.
Need confirmation:
PE rope.
Terminal Ground.
Contact point.
Continuity of the protective wire.
Requirements of the grounding system.
The original article HRT emphasizes that grounding must comply with electrical design and regulations applicable at the work.
I don't want to take the fact that the machine is working as proof that the grounder was right.
The running device and the safety system are two different conclusions.
Before closing CB, I want a “verification checkpoint”
This is the part where I want to make the most dramatic changes in how we work on the site.
Closing the power is not a natural operation after the telegraph team "done".
It's a... hold point.
Only move on when the required conditions have been confirmed.
I hereby request the pre - supply electricity supply inspection slip, which must include at least:
Correct model and wiring diagram.
Power source right.
Right power cord.
Transmission right route and terminal.
Grounders checked.
The right protective gear.
Terminal and cosine terminals are satisfactory.
The wire is secured.
No abnormally open copper core.
The line is not subject to mechanical impact is not suitable.
The original HRT also included these contents in the pre-resource testing process and recommended an independent cross-check.
The last checker should not just ask “Is there electricity yet?"
I want them to check how the system is prepared.
Because after power supply, a power failure may manifest as a device fault.
A transmission error can lead the engineering team to check the control board.
A loose terminal may only appear symptomatic after a while.
Pre-power testing is often much cheaper than diagnosis after the building has been ceiling - closed and put into use.
System does not start: do not conclude control board first
When VRV is not initiated, the progress pressure can lead to a quick conclusion:
“Bo errors”
I don't agree with that approach if the electrical part isn't already excluded.
I want the diagnostic sequence to start from the basics:
Input source.
CB or fuse.
Pha.
Terminal.
Transmission.
Device status.
Then we go deeper.
The original HRT also identified a simple problem at the source that could produce device - like behavior.
A good diagnosis does not begin with the most expensive component. It begins with the elimination of the cause in sequence.
Outdoor unit does not receive indoor unit: please follow the communication network

If the outdoor unit does not receive enough indoor unit, I want the technical team to redraw the communication line on the right diagram.
Go from outdoor unit.
In each branch.
To each indoor unit.
Testing:
The wire.
The junction.
Terminal.
Branching.
Configure.
The number of devices.
Wiring diagram.
The original HRT also recommends not replacing the board before confirming that the network is functioning properly.
I am particularly interested in intermittent errors — when there is, when there is not.
This is usually the group of failures that take the most time because the system can function normally at the time a technician comes to check.
The clearer the data and diagram, the shorter the delineation time.
Communication Error Codes are just instructions where to check
An error code helps narrow down the range.
It doesn't automatically prove that a component is broken.
The transmission error may stem from:
Bad terminal.
The wire's broken.
Loose junction.
The wire is not working.
Noise.
Invalid configuration.
Or the electronics of the device.
The original HRT also emphasized that the fault code should be read according to the documentation of the correct model and perform the corresponding diagnostic procedure.
I want the technical report to say:
What's the check?
How'd it go?
What causes have been ruled out?
What's the basis for the next proposal?
If there is insufficient evidence to conclude a board failure, write:
“Insufficient grounds for conclusions"
That's a more professional way to write than just replace parts by guesswork.
I want the error to be prevented from pulling the rope, not waiting for commissioning
Electrical VRV quality control should not start at commissioning date.
It has to start from the moment the construction is organized.
Labeling from scratch
Don't wait until the wires are in the box to find which end and which end.
Label both ends.
Distinguish POWER and TRANSMISSION
Don't just use different colors.
The profile and the route arrangement must also be clear.
Use the right tools
Cosine tension.
Wire harness.
Measuring equipment.
Matching screwdriver.
Torque screwdriver if required.
The original HRT also included the correct use of tools and cross-checks into measures to limit errors from the site.
First Man vs. Second Man
I think it's a simple solution, but it's very valuable.
Especially at the system has many indoor units.
A repeated error across dozens of devices would create enormous repair volumes if detected only after power supply.
Electrical safety must be ahead of schedule
VRV uses inverters and power electronic circuits.
Therefore, I do not accept terminal operations just because the remote is turned off.
The original HRT requires power isolation, confirmation of power failure, compliance with standby time according to manufacturer instructions, voltage testing and use of appropriate protection before operation.
This is the part of the job that must be done by someone with expertise.
There's no milestone worth saving.
A fault detected before closing the ceiling is always cheaper than a fault after handover
This is why I want the electrical quality to be controlled from the beginning.
While the construction is still in progress, the technician can see the wire line.
Can open the electric box easily.
Can confirm each branch.
After the work is handed over, an unstable transmission error may force the engineering team to:
Open the ceiling.
Look for the cord.
Check multiple indoor units.
Stop the system.
Coordinate with management units.
The original HRT also determines the cost and complexity increase significantly if errors are only detected after handover.
So I want the project team to remember:
Correct from drawing – correct when connecting – check before operation.
CEO view Đoàn Văn Hoàng: I'm not acceptance testing wiring, I'm acceptance testing a condition for the system to be powered.
When I look at a fully - fledged VRV, I don't want to just see the wires going neatly.
I would like to know:
Is the source correct?
Transmission was right?
Terminal correct?
- Did the grounders confirm?
Is CB the right design?
Is the squeeze torque grounded?
Is the wire secured and fixed?
Has the second person checked?
If the answer isn't clear, I don't want power.
That's how I apply the spirit True – Clear – Dedicated.
Understand Correctly model, diagram and function of each line.
Clearly about terminal, wire label, test standard and responsible person.
Dedicated follow up until the system is verified before power supply and a grounded diagnosis if errors arise.
With... VRV electrical connection errorThe target doesn't have to deal with it quickly after the system fails.
The better goal is:
Do not let an error detectable before power closing become a problem after power closing.
Electrical VRV Testing Interchange with HRT
With commissioning preparation system, should prepare equipment model, wiring diagram, electrical drawings, CB catalogue, source information and transmission diagram.
For the system in trouble, it is necessary to add error codes, affected devices, the time of generation and recent changes on the system.
From there, the examination can go in sequence:
Power supply → Protection device → Terminal → Transmission → Configuration → Control → Device → operation.
CEO Đoàn Văn Hoàng | HRT
True – Clear – Dedicated
Right from the beginning – Clear to the end – Sustainable Green.
HRT Contact: 0909 326 888