Xuân Phương, Hanoi
hvac@hrt.vnContact us
HVAC GREEN – HVAC equipment, spare parts and solutions Sales hotline0995.895.555 Cart0

VRV/VRF Air Conditioner Installation Standards

Machine-translated from Vietnamese. Read the original in Vietnamese

Standards for VRV/VRF Air Conditioner Installation

Installation of VRV/VRF air conditioners requires synchronous control from cooling load, equipment location, pipeline, thermal insulation, condensate, electricity – communication to leak testing, vacuum evacuation and commissioning. HRT synthesizes important technical points to help project owners, engineers and supervisory units control system quality before acceptance testing.

Why does VRV Quality Belong To Many Construction?

VRV/VRF air conditioner is a system using a pipeline network connecting one or more outdoor units to many indoor units.

The equipment may be very good, but if it is not done correctly the entire system may still have problems.

Problems usually appear only after the work operation for a while:

Irregular cold → gas leakage → condensation → water runoff → communication failure → heavy operation compressor → difficult maintenance → power surge.

Therefore, the standard of VRV installation should not be understood only as:

“Machine pops up and has cold”

A satisfactory system must be controlled throughout:

Design → equipment → pipe solvent → thermal insulation → condensate → electricity → control → test → commissioning.

Photo used here

Set the created master image:

“TECHNICAL STANDARDS FOR INSTALLATION OF VRV/VRF"

ALT:
Technical standards for installation of VRV VRF HRT air conditioners

Caption:
HRT controls VRV system from survey, construction to commissioning.


5 Core Principles When Installing VRV/VRF

Proper design before construction

If the cooling load, equipment location or technical route is wrong from the beginning, it is difficult to correct by construction methods.

Before bringing materials to the site, it is necessary to clarify:

Cooling load → equipment model → pipeline → outdoor unit position → indoor unit position → condensate → power supply → outdoor air → door visit.


Do not manually change the pipe design

Pipe diameter, gas splitter, length and height difference should comply with the technical documentation of the system in use.

Do not change just because:

“This pipe off-site is available”

or:

“Doing smaller still runs”

VRV is a very tightly controlled liquid flow rate system. Wrong diameter or wrong distributor can affect the liquid distribution and stability.


Construction must keep the circuit clean

Inside the pipeline should be maximum restrictions:

  • Dust.
  • Water.
  • Oxide.
  • Metal dust mites.
  • Foreign objects.

Clean pipeline is one of the important foundations for protecting electronic valves and compressor.


System must be tested before closing ceiling

Do not wait for the finishing of the interior to detect:

Gas leak → water leak → lack of insulation → wrong communication line.

The hidden items should be checked and acceptance testing first.


Commissioning is required if stable operation is desired

Commissioning isn't just about turning on the machine.

It's a process of verifying that the whole system works as designed.


Standards Before Starting Construction

Calculate cooling load instead of selecting capacity by m2

Area is just one of many inputs.

Cooling load also depends on:

Sunlight direction + glass + texture + number of people + equipment + lighting + outdoor air + utility + life time.

For example:

The same two 50 m2 rooms but a 25 person meeting room and a 6 person office will not have the same cooling load.


Zone according to function

VRV has the advantage of independent control over each area.

Therefore, zoning should be based on:

  • Direction of the building.
  • Time of use.
  • Human density.
  • Functional.
  • Load level.
  • Require temperature.

It is not recommended to pair areas with too different load profiles just to reduce the number of devices.


MEP coordination before deployment

Before construction, it is necessary to coordinate at least:

Air conditioner → electricity → water supply and drainage → fire protection → structure → ceiling → lamps → interior.

A nice pipeline on HVAC drawings but conflicting with beams or sprinklers is still an incomplete design.


What does an outdoor VRV unit need to control?

Avoid hot wind return

Outdoor unit must be able to release heat into the environment.

If the hot air after passing through coil is sucked back into machine:

The suction temperature increases → the heating capacity decreases → the system works more adversely.

Especially note with the cluster of multiple outdoor units:

  • On the roof.
  • Trong louver room.
  • In the engineering well.
  • High wall.
  • Face each other.

Specific distances must follow the instructions of the correct model.


Structural and anti-vibration test

Outdoor unit pedestals should ensure:

Flat → firm → enough loading → good drainage → have suitable anti-vibration solution.

With the roof of the work must also consider:

Strong wind + waterproofing + transportation of equipment + the possibility of later replacement.


Leave maintenance space

A medium-fitting outdoor unit does not mean that the location is good.

Leave space for the technician to check:

Fan → coil → control board → compressor → valve → solvent connector → electrical.


Installation Standards indoor unit

Check the wind distribution location

Do not place the blower or inlet at the location where:

Wall → cabinet → curtain → lamp → ceiling shock level

hinder.

For indoor unit connecting air duct, must check more:

ESP + flow rate + air duct size + air outlet.


Hanging device sturdy and balanced

Indoor unit needs to be hung at the right height and stable.

Deviations can affect:

  • Condensate.
  • Vibration.
  • Noise.
  • Bare aesthetics.

Required to think about maintenance as soon as design

The entrance door should allow access:

Filter → electric box → condensate pump → fan → connector → sensor.

A VRV system without good maintenance space will be very costly after handover.


Chemical Pipeline is “The Circuit” of VRV

Right pipe size according to carrier document

Do not manually select spool based on indoor unit capacity.

Need to rely on:

Series VRV → outdoor model → piping branch → total power behind the branch → engineering data.


Length and height difference must be within limits

Each VRV has its own limits:

  • Total length of pipe.
  • The length is equivalent.
  • The furthest route.
  • Distance after splitter.
  • High difference outdoor unit – indoor unit.
  • High difference between indoor units.

Therefore, a common number should not be used for all models.


Gas Divider Not Optional Replaceable Accessories

REFNET, joint or solvent splitter must be correct:

Type → size → mounting direction → position → branch flow rate.

Wrong splitter can cause unequal distribution of solvent.

This is a small detail but it directly affects the functioning of the entire system.


Why welding copper tubing Must Blow Nitrogen?

This is one of the most important points in VRV construction.

When welding copper at high temperatures, the oxygen inside the tube can react to form oxides.

The oxide layer can then peel off and travel along the solvent circuit.

Potential consequences:

Dirt → electronic valve → refrigeration oil → compressor → reduce system reliability.

Construction principles

During Brazing:

Blow Nitrogen flow rate is small → maintain throughout when welding → avoid oxidation of inner surface.

Nitrogen used in the welding process is different from pressurization for leak testing.


Preserve copper tubing Before And While Installing

A simple but very common mistake is to leave the end of the pipe open.

The unconnected pipe end must be:

Sealing → avoid water → avoid dust → avoid insects → avoid building materials.

Don't leave the hose open on the site for days.


Thermal insulation VRV Continuous Sealed

Thermal insulation line solvent has two main tasks:

Limit heat transfer and... condensation prevention.

Positions to be checked carefully:

  • The coupling.
  • Co.
  • Numbness.
  • Joint.
  • Van.
  • Gas splitter.
  • Position through the wall.

Even a neatly insulated 20 m pipe run can develop condensation at a single gap in the insulation.


No Pressure Crushing insulation layer

Drawstrings, hanging straps or brackets should not be so tight that they lose their insulation thickness.

Pressed points can create:

Thermal bridge → cold surface → condensation.

This is a minor but common error in the finished ceiling.


Condensate – Easily Appealed Items After Handover

Flow water from indoor unit can do:

Golden tube ceiling → mold → paint peeling → interior damage.

So the drain line has to be controlled from the beginning.

Guaranteed slope

For self-flowing systems, the route should be arranged so that the water goes continuously to the outlet.

Avoid:

Hammock → upside down → multiple contractions → water accumulation point.


Do not abuse condensate pump

Some indoor units have a built-in pump.

But the lifting height is still limited according to the model.

Do not arrange the line too high just because you think:

“The machine has a pump already”


Water test before ceiling closure

This is the checkpoint to perform.

Testing:

Water into the tray → drain evenly → no leakage → no spillage → pump operation → point of flushing through.


VRV Power System Needs Separate Control

The electricity system must ensure:

Right source → right protective device → right cross section → grounding → clear marking.

Don't pick a cable out of habit.

Need Base:

  • Equipment capacity.
  • The current.
  • Line length.
  • Mounting method.
  • Approved electrical records.

Transmission Wiring – A Small Error Can Make The System Fail

VRVs use communication between multiple devices.

If the match is wrong:

D1/D2 – F1/F2 – communication line

or mixed with the dynamic wire, the system may appear communication error.

Therefore, it is necessary to:

Matching terminal correctly → right schematic → marking → continuity check if needed → pre-check power supply.


Does VRV Replace outdoor air?

No, no, no.

VRV handles thermal load in the room but does not mean the system has met ventilation requirements.

With works such as:

Office – meeting room – school – hotel – showroom

need to calculate additional system:

Outdoor air → PAU → DOAS → HRV/ERV

depending on the requirement.

A room that reaches 24°C but has high CO2 is still not a good environment.


VRV System Test Sequence Before operation

A control sequence should follow:

Finishing piping → leak testing → leak test → vacuum drying → loading additional solvent → electrical testing → installation → test operation → commissioning.

Don't reverse the steps or skip the intermediate test.


Leak testing Does Not Mean Has vacuum evacuation

The two jobs are completely different.

Leak testing

Objectives:

Leakage detection.

Vacuum evacuation

Objectives:

Remove air and moisture from the inside of your pipes.

Hence:

Leak testing achieved does not mean that vacuum evacuation can be abandoned.


No refrigerant charging Only By Feeling

VRVs usually have a built - in solvent in the outdoor unit.

However, this amount only meets certain pipeline conditions.

Additional gas must be calculated according to:

Actual length + pipe diameter + system configuration + manufacturer's formula.

It is recommended to record the amount of addition to:

Commissioning minutes and as-built documentation.


9 Errors When Installing VRV HRT Tips To Avoid

 VRV

Here are points that should be used as a quick QC checklist at the site:

01 – Choose capacity by m2 without calculating load.

02 – Set outdoor unit in the hot wind recovery area.

03 – Self-resize copper tubing.

04 – Welding pipe without blowing Nitrogen.

05 – The gas splitter is in the wrong position or the wrong type.

06 – Thermal insulation at the joints.

07 – Condensate line lacks slope or fails water test.

08 – Fighting the wrong communication line.

09 – Ignore commissioning, only check “machine with cold"

In particular, the 4th error needs to be controlled right during the construction process because oxide forming inside the pipe is difficult to handle after the entire piping network has been completed.


What Does Commissioning VRV Need to Check?

A system should not acceptance testing solely based on room temperature sensations.

Commissioning needs synchronous inspection:

Device → piping → gas → power → communication → drain → airflow → controller → alarm → interlock → operating parameters.

Check each indoor unit

Don't just run a few indoor units.

Need confirmation:

Each indoor → each controller → each zone.


Full System Testing

After individual test, it is necessary to run the system in appropriate modes to evaluate the coordination between outdoor unit and branches.


Record Parameters

The commissioning data forms the baseline operation.

Later when there is a problem, the technician can compare with the original data to identify the problem.


When Can the Ceiling Be Closed?

This is an important question at the site.

Ceiling closures should only be done after inconspicuous items have been inspected.

Minimum of:

Piping correctly → leak testing reached → thermal insulation finishing → drain water test reached → electrical wire and communication test → as-built photograph.

Once the ceiling is closed, repairs become more difficult and expensive.


Process Control VRV Installation At HRT

 VRV

Instead of quality checks at the end of the building, HRT splits up into multiple checkpoints.

Overall Chain:

Surveying → Calculating load → Designing → Shop Drawing → Equipment selection → Construction → QC → Testing → Commissioning → acceptance testing → Handover → maintenance.

Phase 1 – Before construction

Confirm:

Cooling load → model → position → pipeline → outdoor air → power → condensate → MEP coordination.


Phase 2 – In-Construction

Control:

Piping → joint → brazing → nitrogen → insulation → drain → wiring → communication → support → access panel.


Stage 3 – Before closing ceiling

This checkpoint focuses on items that will be obscured.

Perform:

Linear test → sealed test → drain test → thermal insulation test → as-built photo → acceptance testing hidden.


Phase 4 – Before operation

Perform:

Vacuum → refrigerant charge → electrical check → addressing → setting → test operation.


Stage 5 – Handover

Finishing:

Commissioning → training operation → as-built → technical records → maintenance schedule.


Checklist acceptance testing VRV For project owner

Before signing acceptance testing, project owner or consultant can quickly check the following groups:

Groups Contents of the inspection
Equipment Correct model, capacity, location
Outdoor unit Clear span, maintenance, anti-vibration
Indoor unit Altitude, Door Visit, Airflow
Copper tubing True size, gland, splitter
Welding Controlled Nitrogen
Thermal insulation Sealed at the whole joint
Drain Right slope, water tested
Electricity Source, Protection, Grounding
Communication Correct terminal and diagram
Test Leak testing, vacuum
Refrigerant Additional amounts are indicated
Commissioning Have records and data
Profiles As-built, test record, tutorial

This checklist does not replace the carrier manual but is useful for detecting basic deficiencies before handover.


What should be in the VRV handover record?

A good profile does not just serve acceptance testing.

It also supports operations many years later.

Should be saved:

As-built drawing → equipment schedule → piping diagram → electrical diagram → test record → vacuum record → gas charge → drain test → commissioning → equipment documentation → maintenance plan.

If renovation or expansion is needed after 3–5 years, this is a very valuable source of data.

 


HRT – Control VRV According to the principle “True From the beginning”

For HRT, the VRV quality is not in a single device.

It's in the whole sequence:

Right loading → right picking → right design → clean construction → full test → right commissioning → clear handover.

HRT implements solutions:

VRV/VRF – Water Chiller – AHU – FCU – PAU – HRV/ERV – Packaged/Rooftop – BMS – outdoor air – exhaust – air duct – air outlet.

Our motto:

Understand - Clear - Dedicated.

Right From the Start – Clear To the End – Green Sustainable.


Conclusion

A quality VRV system cannot be judged solely by:

“Turning the machine on feels cold”

Need Synchronous Control:

Design → outdoor → indoor → copper piping → REFNET → brazing → nitrogen → insulation → drain → electrical → communication → test → vacuum → refrigerant → commissioning.

In it, all specific parameters about:

Pipe diameter – length – differential – test pressure – gas charge

must be compared with the document of correct device model.

That is the foundation for VRV to achieve three goals:

Stable operation – easy maintenance – long-term efficiency.

HRT – Green Breath for All Buildings

Source: Publisher’s English edition · Vietnamese original on doanvanhoang.com