Industrial Air Conditioning System Design Packaged Water Cooled: True From the Start To Sustainable Operation

Designing Water-Cooled Package AC System Is Not Just Choosing Machine

Designing Water-Cooled Package AC System Is Not Just Choosing Machine

In many factories, manufacturing plants, logistics centers, industrial parks and other large cooling loads, the Water-Cooled Package AC is an effective solution thanks to its strong cooling capacity, stable operation and easy maintenance.

However, the effectiveness of the system does not lie in choosing a machine with high power.

A Packaged system that wants to operate stably for years must be properly designed from the beginning, from survey, cooling load, equipment selection to piping design, electrical control and construction drawings.

At HRT, we approach Packaged system design According to the philosophy:

Right from the beginning – Clear to the end – Sustainable Green.


Step 1: Survey the Works and Collect Input Data

Step 1: Survey the Works and Collect Input Data

Every effective HVAC design begins with properly understand the construction.

Engineers need to survey and clarify:

  • Type of construction.
  • Uses.
  • Production characteristics.
  • Actual operation conditions.
  • Requires temperature and humidity.

Especially for industrial factories, it is necessary to determine:

  • Machines generate heat.
  • A heating device.
  • Dust - producing areas.
  • Areas requiring temperature control.

Architectural parameters to collect:

  • Area of use.
  • The height of the work.
  • Sunny side.
  • Covering material.
  • Glass ratio.

This is the foundation for accurate cooling load calculation.


Step 2: Calculate cooling load Accurately

Step 2: Calculate cooling load Accurately

This is the most important step of the whole project.

If cooling load is wrong:

  • If it's too small, it won't be cold enough.
  • Machines that are too big will be a waste of investment.
  • Increased power consumption.
  • The equipment life is reduced.

The cooling load is usually calculated as follows:

  • TCVN 5687:2010.
  • Carrier HAP.
  • Daikin Heat Load.
  • Trace 700.
  • Revit MEP HVAC.

The results to be determined include:

Cooling load total

Unit:

  • kW
  • RT
  • Btu/h

Supply airflow

Unit:

  • m³/h
  • CFM

Thermal load visible and thermal load hidden

Helps control:

  • The temperature.
  • Moisture.
  • Quality of working environment.

A standard HVAC design always starts with the standard cooling load problem.

HRT always adheres to: 5 HRT Business Ethics Commitments


Step 3: Select the Main Equipment

Step 3: Select the Main Equipment

After cooling load, the engineer proceeds to select equipment.

Choose Water Cooled Packaged Machine

The selected machine needs:

  • Meet cooling load calculations.
  • Have appropriate capacity reserve.
  • Ensure required airflow rate.
  • Suitable for actual operation conditions.

Generally, 5% to 10% of the patients should be given prophylaxis.

Should not be too large redundancy because will increase the cost of investment and operation power.

Select cooling tower

Cooling tower must be able to discharge the entire heat from the system.

Principle of selection:

Cooling tower capacity = cooling capacity + Compressor power capacity

The choice of lack of power will increase condensate temperature and reduce cooling performance.

Select Water condenser pump

Need to calculate:

  • Water flow rate required.
  • Pressure drop pipeline.
  • Loss through condenser coil.
  • Losses through cooling tower.

From which determine:

  • pump flow rate.
  • Pressure head pump.
  • Engine power.

Step 4: Design the air duct system

Step 4: Design the air duct system

Industrial Packaged Machines often have large airflow rates.

Therefore, the air duct system must be carefully calculated.

The contents to be implemented:

Air outlet layout

Determine:

  • Air outlet level.
  • Air outlet return.
  • Blow direction.

Objectives:

  • Distribute gas evenly.
  • Do not create a hot zone.
  • Do not create dead zones.

Calculation Air duct Size

Commonly used:

  • Equal Friction Method.
  • Ductulator.

Simultaneous Control:

  • Pressure drop.
  • Noise level.
  • Wind velocity in the tube.

Insulation Design

Air duct must be insulated to:

  • Resist condensation.
  • Reduce cold losses.
  • Increase energy efficiency.

Step 5: Design the water condenser system

Step 5: Design the water condenser system

This is the system that connects:

  • Packaged Machine.
  • Condenser water pump.
  • Cooling tower.

The design items include:

Pipeline water condenser

Includes:

  • Feeding lines.
  • The return line.

Calculate Pipe Diameter

Based on:

  • Water flow rate.
  • Economic velocity.

Normally:

  • 1.2 m/s to 2.4 m/s.

Helps limit:

  • Noise.
  • Vibration.
  • Corrosion of pipes.

Auxiliary Equipment

Includes:

  • Stop valve.
  • Balancing valve.
  • One Way Valve.
  • Filter the Y.
  • Pressure gauge.
  • The temperature clock.
  • Water treatment system.

These are small components but have a huge effect on system durability.


Step 6: Electrical and Control Design

Step 6: Electrical and Control Design

A Packaged system that wants to operate safely must have a synchronous electrical and control design.

Items to be calculated:

Electrodynamic System

Includes:

  • Packaged Machine.
  • Condenser water pump.
  • Cooling tower fan.

Selection:

  • MCCB.
  • MCB.
  • Contactor.
  • Electrical cables.

Follow the boot and operation lines.

Interlocking Control

Mandatory principle:

  1. Pump condenser water works.
  2. Cooling tower fan working.
  3. New Packaged compressor allowed to boot.

Conversely when stopping:

  1. Compressor stop first.
  2. Pump and tower keep running for a period of time.
  3. Then, completely disconnect it.

This is the important condition to protect compressor and condenser coil.


Step 7: Complete the Drawing

Step 7: Complete the Drawing

After completing calculations and selection of equipment, the engineer deploys design documentation.

The standard dossier set shall include:

  • Equipment layout plan.
  • Ductwork ground.
  • Pipeline condenser water level.
  • P&ID Principle diagram.
  • Electrical control diagram.
  • Installation details.
  • Anti-vibration machine pedestal details.
  • Valve and accessory details.

The clearer the drawing, the more accurate the construction and reduced the arising.


HRT Designs Packaged Systems Following the Right Philosophy From the Start

HRT Designs Packaged Systems Following the Right Philosophy From the Start

At HRT, we don't start by picking machines.

We start by understanding the right construction, calculating the right cooling load, selecting the right equipment and controlling the entire system from design to operation.

Each Packaged project is reviewed simultaneously:

  • Cooling effect.
  • Investment costs.
  • Electricity costs.
  • Operation stability.
  • Maintenance capability.
  • Equipment life.

That's how HRT creates efficient, energy-efficient and sustainable HVAC operation systems throughout the building life cycle.

HRT – Green Breath for All Buildings

Source: Publisher’s English edition · Vietnamese original on doanvanhoang.com