What is AHU? Choose the right machine, make the right system | HRT

Machine-translated from Vietnamese. Read the original in Vietnamese

What is AHU? Choose the right machine, do the right system | HRT

What is AHU and how to choose the right equipment for the project? CEO Đoàn Văn Hoàng – HRT sharing how to choose the AHU synchronized with the cold source, wind and control, and clarifying maintenance requirements, acceptance testing so that the system meets the needs of use.

What is AHU? Choose the right device, do the right system

AHU

AHU, short for Air Handling Unit, is an air handling unit. Depending on configuration, the AHU performs filtration, cooling or heating, dehumidification and delivers air through a distribution system to the area of use. The unit can be combined with cold water or direct refrigerant use systems. 

When considering an AHU proposal, I don't start with the question of which brand the machine is from or how much power it has.

I want to know what the device was tasked with in the construction.

An office floor needs to be served during working hours. A meeting room can gather crowds at private times. A production area has environmental requirements associated with the operation of the line. Before selecting equipment, these differences need to be agreed by users and design teams.

From an HRT operator perspective, I consider the purchase of an AHU to be part of the decision to invest in the system. In the browser scheme, the device must be placed next to the refrigeration source, wind line, control and takeover plan.

Choosing the right machine is a necessary condition. Doing the right system is the goal to follow to the end.

Where is the AHU located in the HVAC system?

What is AHU

To understand the role of an AHU, it is necessary to distinguish the cold source generation section from the air handling section.

In a refrigerated water system, the chiller cools the water; the water is fed to the AHU's coil—the heat exchanger—to receive heat from the air. Then, the water returns to the system for further cooling. The air and water exchange heat through the coil, not mixing with each other. With the DX configuration, the refrigerant passes through the coil instead of the cold water. 

Therefore, it is not recommended to call the AHU Chiller, nor should any AHU be defaulted to connect to Chiller. The source of refrigeration must be determined according to the equipment configuration and design of the project. 

What I'm asking for in the file is to clearly show the responsibility of each part: which appliances provide the cold source, which AHUs process the air to what state and where does the distribution network take that wind.

If there is an item outside the scope of supply, specify the unit in charge. Do not let commissioning detect that each party assumes that the missing part is the responsibility of another party.

Service range is more important than machine size

AHUs can serve one area or multiple spaces through ductwork. Configuration may also vary in humidity control, noise level, air quality and how flow rate is adjusted. 

So when discussing AHU applications for offices, hotels or factories, I suggest starting from the scope of service.

What areas share the same equipment? Do they have the same schedule? When a part of the building is closed, how will the other option work?

This is also how I want the project team to approach when comparing AHUs with FCUs or other solutions: putting the options on the same page requires usage, rather than just comparing the shape and nominal power.

Understand the structure of AHU through the tasks of each department

HRT

A basic AHU usually has filters, coils, fans and motors. When more complex construction is required, the equipment can add corresponding handling and control components. 

But for the person who approves the investment, knowing the names of the parts is just the beginning. What it takes to understand is how they work together.

In the mixing configuration, outdoor and return air is received, adjusted and processed. With other configurations, the task and organization of the airflow may change. There is no single layout that applies to every AHU. 

The filter retains particles according to the filtration characteristics; the coil exchanges heat with air; the fan creates a flow of movement through the equipment and distribution network. The fan can be located before or after the coil, depending on the design. So the schematic diagram needs to reflect the actual configuration, not just copy a familiar illustration sequence. 

Having cold coil is not enough to commit to humidity control

When the coil surface temperature is lower than the dew point of passing air, water vapor can condense, reducing the amount of moisture in the air. However, the ability to maintain the humidity of the space depends on the design and control mode, especially when the system works at low loads. 

So if the building has a humidity requirement, I want that to be included in the design task.

It is not recommended to write “AHU has moisture separator function” and then consider it solved. The planner must explain what conditions the device will meet and how the result is tested.

Similarly, filters should be selected with the same differential pressure level and accessibility for replacement. The EPA recommends monitoring differential pressure through filtration, while ensuring airtightness to limit air going around the filter element.

AHU construction is only meaningful when each component is selected to meet a confirmed requirement.

The AHU selection table must be accompanied by the conditions that the project provides

A cooling capacity line cannot replace the entire selection profile.

According to ASHRAE's coil selection guidelines, the input air temperature and humidity, cooling source, air flow rate and cooling load, pressure drop and control requirements should be considered. Selection results should be compared with the air state to be reached after the coil.

From there, I asked the machine selection table to have the calculation conditions included.

If the AHU uses cold water, compare the coil selection parameter with the water condition the system is expected to provide. If DX is used, there must be grounds for compatibility between the coil, cold source and control.

It is not recommended to browse the device just because the announced power is greater than the calculated load, while the two numbers are determined under different conditions.

Flow rate must be read at the same pressure

Fan should be selected according to the flow rate and pressure loss system. Racan-Carrier's manual distinguishes the external pressure drop of the device from the internal pressure loss, including coil and related parts. These parts must be determined when selecting the fan. 

Therefore, a quotation stating flow rate m3/h but not clarifying the pressure condition is still not sufficient for technical comparison.

I suggest the tester confirm the value being reported as external static pressure or other parameters. What loss is calculated in the machine, what part of the pipe network and what is the filter condition used to calculate?

If different providers use different expressions, convert to the same baseline before comparing.

At the approval step, I didn't want the project team to fill in a “pass" sign just because the two lines of specifications looked equivalent.

The backup part must have a reason

When proposing an increase in capacity or flow rate, the maker needs to explain what the increase serves.

Is the load confirmed, scalability planned or assumptions unproven? If there is no extension later on, how is the system expected to work?

I am not opposed to redundancy. I am opposed to adding capacity to quotations without clarifying the conditions of use.

A good machine selection table must help the approver understand the selection grounds, not just see a proposed model.

How the operation should be closed before ordering

When I selected the AHU, I asked the project team to describe a day of operation for the building.

In the morning, which areas need to be ready in advance? During the day, how do needs change? At the end of the hour, what part is still occupied? When the work is suspended from exploitation, are there any requirements to continue to maintain?

These situations will become the subject of control design and commissioning plans.

Do not just prove the system at high load

Trane's technical documentation separately considers dehumidification at full and partial loads, as well as the effects of flow rate adjustment, air supply temperature and external wind handling options. This shows that humidity control needs to be evaluated in multiple working modes, not just at one design point. 

For the specific project, I wanted the design team to point out situations that needed further testing.

For example, when the room is nearing temperature but still needs ventilation, what components will the system adjust? If the flow rate is reduced, which areas are affected? When a sensor shows abnormal signs, how is the operator warned?

The answers must become a description of the control sequence, not to depend entirely on the experience of the operator.

“Having BMS” is not a complete description of the control

Some Daikin AHU configurations integrate temperature sensors, humidity, CO2 and controllers to manage water valves, damper, fans, variable-frequency drive and monitoring signals. The specific range depends on the configuration selected. 

So in the proposal, I want to clarify what data the BMS building management system will receive and what functions it is allowed to control.

If only the signal is on, off and fault alarm, write that range correctly. If there is adjustment according to the need for use, it must state the input signal, how to react and test conditions.

Control must help operation team understand and manage the system, not only make the screen have more icons.

The engine room must have room for both equipment and maintenance

Before closing the AHU location, I suggest checking the incoming line simultaneously, how to assemble and maintain operations later.

Just because a device fits on the ground doesn't mean it's complete.

The EPA stresses accessibility to HVAC parts for operation, maintenance; including filter access doors and condensate trays. Racan-Carrier guidelines also require consideration of additional coil removal space in addition to the usual servicing void. 

In the coordination session, I want the person in charge of operation to directly indicate where to stand for operation, the direction to open the door and the way to take the replacement out.

If a pipeline occupies the filter draw, it must be processed on the coordinate drawing. If the transportation line is limited, it is necessary to agree on the delivery configuration and mounting plan before laying the machine.

Don't wait for the equipment to arrive at the site to discuss how to put it in place.

Condensate must also have complete plan

For coils that have a process of separating moisture, water should be collected and carried out of the unit. ASHRAE refers to the arrangement of collection troughs, drainage lines, sanitary locations and insulation of the relevant parts in the design of coil assemblies.

At the project, I requested to compare the drainage solution with the documentation of the correct equipment and installation conditions.

Drawings must show connection points and necessary space. Inspection plans must determine ways to certify water drainage capacity before completing hard - to - reach areas.

Don't let a sub-detail in your list become unaccounted for.

Acceptance testing AHU must go from functionality to place of use

The U.S. Department of Energy describes commissioning as the process of verifying that a system is installed and operated according to the criteria in the design documentation. For HVAC, commissioning includes control functions, schedules, installation parameters, and ventilation responsiveness. 

That's how I want to run acceptance testing AHUs: validating tasks from the start.

I recommend commissioning plans that are aligned with each region and operation mode. Results such as flow rate, humidity temperature conditions, cold source status and control responses should be recorded according to the agreed range.

Do not use the right direction of rotation to represent the ability to distribute wind. Do not use the temperature at one location to conclude the entire area has met.

Each measurement results need context

In the log, specify which devices are being tested, what mode the system is running in, and what state the area is in.

If a part of the work is not yet completed, it should be stated which part is not eligible for assessment. If the time of testing does not represent the identified disadvantage situation, keep that content in the additional verification plan.

I do not want a limited result to be interpreted as a commitment to all operational conditions.

The signer needs to know exactly what he or she is approving.

Handover must help the operator take over

Along with commissioning results, I require records showing the service area, connection diagram, settings parameters and operation sequence.

Changes made on the scene must be updated. Existing open issues must be handled by a person and rechecked within a time limit. Instructions should be made on the actual system, not just transferring a set of documents.

An AHU that has not been taken over clearly should not be considered closed.

When the system is not reached, correct the correct part before deciding to replace the machine

If the appearance reflects a lack of wind or unstable room conditions, I suggest starting by identifying the phenomenon's range.

Is the problem a whole area or a branch? Is it frequent or hourly? Has the building changed its interior, activity schedule, or settings recently?

From that information, the new technical team sets up the corresponding test content. Refrigeration source, coil, wind line, valve, sensor and control all need to be considered according to the actual sign, instead of defaulting the cause lies in the AHU capacity. 

On the approval side, I ask for a correction proposal that clearly answers: what abnormality has been confirmed and which part of this intervention will be directly addressed?

If the replacement is proposed, it should be explained why the existing system adjustments or fixes have not met the requirements. If only one part is changed, it must be determined which parts are relevant to recheck.

I don't aim to keep the old machine at all costs. I want the investment decision made after understanding the problem, not before.

CEO's view Đoàn Văn Hoàng: The value of AHU lies in the results of the work received

When project owner asks What is AHUI want answers that help them read a technical proposal and know what to ask for clarification.

Equipment must be selected from the needs of use. Parameters must have accompanying conditions. Installation plans must take into account the maintenance person. Commissioning results must reflect the correct scope of inspection.

I want the interpreter to be selected. The builder knows what needs to be kept. The operator understands how to take over. The approver has grounds for decision.

That's how I define the spirit. True – Clear – Dedicated in the workplace.

An unknown cold source proposal should be added. A non-maintenance space option should be reviewed. An untested function should be noted as unconfirmed.

Do not end up selecting an AHU at a model code. Follow until the device and system meet agreed tasks.

Exchange AHU plans with HRT

When preparing for investment, project owner should gather the utility site, operation schedule, temperature – humidity requirements and expected cold source information.

For the work in use, add a current drawing, operation data and specific reflections. From there, the parties can agree on the scope of survey before deciding to adjust, renovate or replace equipment.

Contact HRT: 0909 326 888. HRT

CEO Đoàn Văn Hoàng | HRT