What is air duct HVAC?

HVAC air duct is used to transport supply air, return air, outdoor air and exhaust air. Proper design, sealed construction and satisfactory insulation help the system operate stably, save energy.

Air duct HVAC: Classification, Materials And Construction Standards

Air duct HVAC Air supply system connects AHU, FCU, fans and other areas used in the building. Depending on the function, the pipeline can transport supply air, return air, outdoor air or exhaust air.

Properly designed air duct will help the air distribute evenly, limit noise and reduce pressure drop. On the contrary, pipeline misdimension, leakage, thermal insulation opening or too much layout can cause the system insufficient airflow, condensation and additional power consumption.

So the efficiency of HVAC system depends not only on the equipment capacity but also greatly on the quality of pipe design and construction.

1. Role of air duct in HVAC system

 

Each pipeline in the air conditioning ventilation system undertakes a separate task.

Air supply line

Air supply lines take air that has been cooling, heating or moisture treatment from the AHU, FCU to the room.

The flow rate at each branch must be consistent with thermal load and use capacity of the area.

Air return route

Return air collects room air to AHU or FCU for further circulation and processing.

Inappropriate return lines can reduce air circulation and cause room temperature differences.

Outdoor air route

Outdoor air brings the outside air into the building to improve indoor air quality.

The system should be calculated according to the number of people, functions and actual use time.

Air exhaust line

Exhaust air lines remove odors, heat, dust or contaminated air from toilets, kitchens, technical rooms and production areas.

Supply air and exhaust air should be coordinated reasonably to avoid pressure imbalance or odor spread between areas.

2. What parts does an air duct system consist of?

Air duct HVAC

The complete system not only has straight pipe sections, but also includes many accessories and control devices.

Main Pipeline

The main pipe delivers large volumes of air from the AHU, feed fan or exhaust fan to distribution areas.

This gland is usually large and significantly affects the total pressure loss of the system.

Distribution Branches

Branch ducts deliver air from the main line to each room, VAV Box or air outlet.

Branch size must be selected according to the flow rate design to avoid the situation of excess wind at the beginning of the line but shortage of wind at the end of the line.

Colic, quail, numbness and passage

These accessories are used to change direction, branch off or resize pipes.

The transfer section is too short, too tight or layout multiple accessories in a row can increase pressure drop and noise.

Damper

System can use:

  • Balancing valve flow rate.
  • Van VCD.
  • Motor-controlled valve.
  • Fire damper.
  • Smoke control valve.

Valves should be installed in the right direction, in the right position and have enough space to check and adjust.

VAV Box

VAV Box adjusts airflow rate according to the needs of each area.

The device usually combines actuator, sensor and BMS to change the wind volume according to temperature or actual load.

Visiting door

The access door provides access to the damper, VAV Box, sensor and other cleaning locations.

If not arranged from the design stage, maintenance after closing the ceiling will be very difficult.

Air outlet

The feed mouth, gable mouth, grille and diffuser are the end points of the air distribution system.

The right type of filter will help to limit drafts, noise, and distribute air more evenly.

Suspension System

Suspension bars, brackets and link fittings keep pipelines at the correct elevation, limiting vibration, sag or deformation.

Insulation layer

Thermal insulation is used for cold wind routes or locations where condensation is at risk.

The insulation helps limit heat loss and protects the ceiling and surrounding equipment from condensate buildup.

3. Classify HVAC air duct according to shape and function

Air duct HVAC

Air duct square or rectangular

This is common in offices, hotels, hospitals, malls, and factories.

Advantages:

  • Easy to arrange in engineering ceiling.
  • Conveniently connect to AHU and wind box.
  • Can change the width and height ratio according to space.

However, these tubes should be reinforced as required to avoid vibration or deformation.

Air duct round

Round pipe has good rigidity, suitable pressure resistance and is used in many industrial air supply, exhaust or ventilation systems.

This type is also suitable for works that expose pipes because of its good aesthetics.

Air duct twist

A twisted tube is a round shape of pipe that is manufactured in a continuous spiral.

Products are often found in factories, gyms, restaurants or industrial style buildings.

Flexible air duct

Flexible hose is mainly for short connection between hard pipeline and air outlet.

Do not stretch the tube too long, sagging, twisting or folding as this will reduce cross section and increase pressure loss.

Acoustic or soundproof pipe

Acoustic noise suppression tubes are used in areas where airborne noise control is required.

However, the acoustic layer and internal components can increase the pressure drop so it should be calculated with fan pressure.

4. What materials are commonly used to produce air duct

Galvanized Steel

Galvanized steel sheet is a widely used material due to its ease of processing, suitable durability and reasonable cost.

The thickness of corrugated iron should be selected according to the pipe size, pressure and requirements of design documentation.

Inox

Stainless steel air duct is suitable for environments with high humidity, grease, mild chemicals or high hygienic requirements.

This material is often used for industrial kitchens, cleanrooms and some specific production areas.

Aluminum

Aluminum is light in weight and corrosion resistant under certain conditions.

The selection should consider the mechanical strength, installation environment and bonding method.

Insulation material

Common insulation materials include:

  • Glass wool.
  • Vulcanized rubber.
  • Specialized insulation material.
  • Silver layer or outer protective layer.

Materials must be sealed, not torn, moistureproof and not overly compressed.

5. Factors that determine the pipeline efficiency

Pipe Size

Pipes too small increase the velocity and pressure drop. Pipes too large take up more space and increase investment costs.

The size must be selected according to the flow rate, velocity and pressure head allowed.

Routes

The longer the tube and the more contractions, the greater the total pressure loss.

The design should limit sudden direction changes and early coordination with structure, electricity, water and fire protection.

Airtightness gas

Leakage at flanges, joints and inlets causes air loss before reaching the use area.

This makes it difficult to balance the system and the fans have to work harder.

Maintenance capability

Damper, VAV Box, sensor and the visit door should be arranged at the accessible position.

A system that cannot be conveniently maintained will quickly deteriorate and be difficult to calibrate after handover.

Noise level

High speeds, flexing the valve, excessive valve closing, or uncertain suspension can all cause noise.

Noise control should be done from the design, not just after the system is complete.

6. HVAC air duct construction process

Processes

Step 1: Review the drawings

Construction team needs to check:

  • Dimensions and altitude.
  • Material and thickness of corrugated iron.
  • Valve Position, VAV Box and Gate Visit.
  • Requires thermal insulation.
  • Intersection with other systems.

Any changes should be checked and approved before they are made.

Step 2: Processing pipes and fittings

The pipe, shrink, numb and transfer sections are processed according to the approved drawings.

The size, squareness, flanges and reinforcement should be controlled before putting on the installation.

Step 3: Install the suspension system

The brackets should be firmly mounted, with the correct height and design distance.

Do not let the pipeline create a direct load onto the AHU, FCU or fan.

Step 4: Pipe assembly

Pipe segments are connected by flanges, gaskets and fittings accordingly.

Connections should be tight, straight and not deform the pipe cross section.

Step 5: Install equipment on line

Damper, fire damper, VAV Box, sensor and visit door must be installed in the right direction and in the right position.

Need to leave operational space for operations team.

Step 6: Thermal insulation

The insulation must be continuous over the entire line.

Flanges, brackets and joints should be handled carefully to avoid condensation.

Step 7: Inspection and cleaning

Before handing over, it is necessary to remove dust, corrugated iron pieces and excess material inside the pipeline.

Pipe ends waiting for installation should also be covered during construction.

Step 8: Measurement and balance

After the system is complete, it is necessary to measure flow rate, pressure and damper correction.

Actual results must be compared with design parameters before acceptance testing.

7. Eight important notes when constructing

Note

Comply with approved shop drawing

Do not arbitrarily change the size or route just for convenience of construction.

Any changes can affect flow rate, pressure and maintenance capacity.

Seal all joints

Flanges, joints and inlets should use gaskets or suitable airtight sealant.

Suspension is strong

Pipeline must not sag, deviate in pitch or vibrate when the fan is working.

Reduce the urgency of quail

The redirecting segments should be of the right shape for more stable gas flow.

Leave space for valves and gates

Do not cover the VAV Box, actuator or sensor behind the ceiling.

Thermal insulation sealed and continuous

Every gap can become a condensation site.

Use flexible hose in the correct length

Flexible hose should be used for short connection only, not to fold or distort.

Cleaning before handover

Dust and excess material in the pipeline can be dispersed into the room when the system is operating.

8. Common mistakes on the site

Some common errors include:

  • Fitting the wrong size compared to the drawing.
  • Minimize the cross section to avoid conflict.
  • The junction is open.
  • Lack of air tight gasket.
  • Flexible hose lasts too long.
  • No reinforcement of large size pipes.
  • The supporting distance is not suitable.
  • Thermal insulation is torn or gaped.
  • No Visiting Doors for Valves and VAV Box.
  • Piping should not be cleaned before running the machine.
  • Do not measure flow rate after completion.

These errors can cause the building to lack wind, generate noise, condensation and increase operational costs.

9. When should the pipeline be inspected or renovated?

The system should be checked when appearing:

  • Some rooms don't have enough wind.
  • Temperature between areas is uneven.
  • Air outlet emits a hiss.
  • Pipelines vibrate or make noise.
  • Ceiling appears dampness or condensation.
  • The exhaust system is weak.
  • The building has changed its layout.
  • AHU or fan is replaced.
  • Electricity increased but efficiency did not improve.

Do not only speed up the fan when the condition of pipeline, damper, filter and coil has not been determined.

10. Air duct system solution at HRT

HRT deploys piping in connection with the entire HVAC system, from equipment to air distribution.

The implementation process includes:

Survey: Inspect the site plan, route and construction conditions.

Design: Calculate the flow rate, size, velocity, pressure and thermal insulation.

Coordinate: Check for conflicts with electricity, water, fire protection and structure.

Construction: Controlling materials, machining, joints, suspension and thermal insulation.

Testing Measurement: Check flow rate, pressure and airtightness.

Calibration: Balance flow rate by branch and area.

HRT towards the system is implemented right from the start, clear responsibility and convenient for long-term operation.

Conclusion

Air duct HVAC is the decisive part of air distribution capacity in ventilation air conditioning system.

A satisfactory system should have the right size, reasonable route, sealed joints, strong suspension, continuous thermal insulation and adequate maintenance conditions.

Correct design but wrong construction can still cause poor system performance. Therefore, pipelines need to be controlled from drawings, materials, machining, installation to measurement and balance after completion.

HRT – Green Breath for All Buildings

True – Clear – Dedicated

Source: Publisher’s English edition · Vietnamese original on doanvanhoang.com