What is FCU? Principle, How to Choose and Solution FCU for Chiller System
Machine-translated from Vietnamese. Read the original in Vietnamese

FCU – Fan Coil Unit is an important terminal in the central air conditioning system of Chiller. Learn how FCU works, selection criteria, technical errors to avoid and the process of deploying FCU systems at HRT.
What role does FCU in the central air conditioning system play?
In the central air conditioning system using chiller, the cold source is usually created in the engine room and transmitted to the area of use through the chilled-water pipe network.
In each room or zone, FCU – Fan Coil Unit responsible for heat exchange with air before returning the processed airflow back into space.
Can visualize the sequence of operations:
Chiller → chilled-water pump → CHW pipeline → FCU → Air conditioning space → Water return to Chiller
Therefore, FCU should not be viewed as an independently operating device. The actual performance of FCU depends simultaneously on:
- Cold water source.
- Water flow rate.
- Hydraulic balance.
- Airflow rate.
- Fan pressure.
- Control system.
- Coil and filter status.
- Quality of condensate road construction.
This is also the reason a FCU with a suitable catalog capacity is still possible not reaching room temperature if the whole rear system has not been properly designed and calibrated.
What is FCU?
FCU stands for Fan Coil Unit, an air handling equipment has two main functional parts:
Fan – fan: create air flow.
Coil – heat exchanger: heat exchanger between cold water and air.
In Chiller system, cold water passes through FCU's coil. The air in the room is exhausted fan through filter, goes through coil surface to reduce temperature, then is returned to the used space.
Simply understood:
FCU uses the cold source from the central system to process air for each room or each area.
FCUs are not self - cooling devices in the way of a conventional DX air conditioning system.
What parts does a FCU consist of?
Instead of just interested in cooling capacity, when choosing FCU need to understand the function of each component inside the device.
FCU Fan
The fan determines the circulation and distribution of air.
Important parameters include:
- Airflow rate.
- Number of speed levels.
- Engine power.
- ESP – External Static Pressure.
- Vibration levels.
- Noise level.
For FCU concealed ceiling connector air duct, ESP is particularly important. If the fan pressure is not enough to win the pressure loss of the air duct system, the actual flow rate at the air outlet will be low.
Coil Heat Exchanger
Coils are usually composed of a water pipe coupled with a heat exchanger blade.
The cold water from Chiller passes through the coil while air passes through the surface of the coil.
Heat exchange efficiency depends on:
- Temperature chilled-water supply.
- Return-water temperature.
- Water flow rate.
- Air flow rate.
- Coil area.
- Cleanliness of coil surface.
In many Chiller systems, the condition 7/12°C usually used as a reference design parameters, but the actual selection must be based on project requirements and equipment catalog.
Filter – filter
Filter retains dust before air flows through the coil.
When the filter is too dirty:
Pressure loss increases → airflow rate decreases → Heat exchange capacity decreases → Long-term cold room.
This is one of the simplest but common causes when FCU operations are unsatisfactory.
Condensate Tray and Line
When the coil surface has a temperature lower than the dew point, moisture in the air will condense into water.
Condensate needs to be collected and drained out continuously.
If the construction lacks slope, clogged pipes or unsanitary water trays, the following may occur:
water spill – water leakage – arising odor – ceiling damage.
Cold Water Valve
The valve controls the amount of water passing through the coil according to load requirements.
Depending on the system can use:
- Two-way valve.
- Three-way valve.
- Linear control valve.
- PICV or other balance and control solutions.
Thermostat and Controller
Thermostat measures room temperature and sends signals to control a fan or valve for cold water.
With large construction, FCU can be integrated into BMS to monitor status, temperature, operation schedule or alerts.
How does FCU cooling air?
The FCU principle can be summarized by a simple cycle:
Room air → Filter → Coil refrigeration → Fan → Air conditioning space
The process takes place in the following steps:
Air is sucked to FCU
Fan differential pressure to suck room air into the device.
Air passes through the filter
Dust is retained before the airflow comes into contact with the coil.
Heat Exchanger at Coil
Cold water from Chiller runs inside the coil.
The hotter air passes through the coil and transfers heat to the cold water stream.
Results:
- The air temperature drops.
- A portion of the moisture may condense.
- The cold water receives heat and returns to the chiller system.
Air is fed back to the room
The fan brings the air after treatment through the air outlet into the space to be used.
Thermostat keeps monitoring the temperature and adjusting the operation state according to the control logic of the system.
Common types of FCU in the construction
FCU concealed ceiling connector air duct
This is a popular choice for:
- The hotel.
- The office.
- Luxury apartments.
- Areas that require aesthetics.
FCU is placed above the ceiling and connected to air outlet through air duct system.
Advantages:
- High aesthetics.
- Flexible air outlet position.
- Easy to coordinate the interior.
Points to note:
Got ta get the pressure head right outside ESP.
FCU cassette
Ceiling mount device, mask exposed below.
The solution is suitable when direct air supply is needed without the need to use complex air duct network.
FCU floor or ceiling pressure installation
Often selected for renovation works or areas with specific architectural conditions.
FCU 2 Tubes And FCU 4 Tubes
2 Tube System: one level line and one return line.
The advantage is simple, reduce the number of pipes.
4 Pipe System: It has its own cold and hot water circuit.
The advantage is more flexible control when the zones have different heating and cooling needs.
What buildings usually use FCU?
Hotels & Resorts
This is a very typical application of the Chiller – FCU system.
Each room can have:
- Separate FCU.
- Separate thermostat.
- Independent temperature control.
Meanwhile, Chiller provides centralized refrigeration for the whole building.
Office Buildings
FCU is suitable for areas where zone division is required:
- Meeting room.
- Leadership room.
- Office work.
- Independent leased area.
- Spaces have different operation schedules.
Luxury apartments
The central chiller system can supply cold water to many apartments while each apartment still controls the FCU according to its own needs.
Business Center
FCU can serve:
- Small shop.
- The management office.
- Functional room.
- Area requires separate control.
Larger spaces are often coordinated with AHUs or other air handling systems.
Hospitals and special projects
FCU can be used in suitable areas.
However, with the required room:
- Differential pressure.
- Cleanliness.
- Control the humidity.
- Control cross-contamination.
- Precision outdoor air level.
need to evaluate the entire HVAC system instead of just reviewing the FCU separately.
FCU and AHU: When to use which device?
| Content | FCU | AHU |
|---|---|---|
| Full name | Fan Coil Unit | Air Handling Unit |
| Scale | Small – Medium | Medium – Large |
| Range of service | Room or zone | Large Area |
| Air duct | Short Or Medium | Usually large and complex |
| Outdoor air | Limited processing capacity | Can be processed centrally |
| Air Filter | Basics | Can be multilevel |
| Moisture Treatment | More restrained | Can be intensive |
| Installation Space | Small | Bigger |
| Control each room | Advantageous | Partition Dependencies |
Do not understand that must choose FCU or AHU.
In many projects:
AHU/PAU outdoor air handling + FCU local cooling load handling
is a common option.
Selecting FCU should not start from the room area
A relatively common mistake is to simply convert:
Room area → FCU capacity.
This does not fully reflect the actual cooling load.
Two rooms of the same size but can differ greatly in:
- Sunny side.
- Glass area.
- Number of people.
- Electrical equipment.
- Illuminate.
- Outdoor air.
- Uses.
- Time of operation.
HRT therefore recommends a minimum evaluation of the following parameters.
Cooling capacity
Must be based on cooling load calculation of each zone.
Airflow rate
Enough to meet the load and reasonable air distribution.
ESP
Especially important for FCU connector air duct.
ESP must be sufficient to win the total pressure loss of:
air duct + co co quail + damper + wind box + filter + air outlet
Noise level
Careful inspection is required for:
- The bedroom.
- The hotel.
- Meeting room.
- High-end office.
Cold water condition
Catalogue capacity is only meaningful when properly collated:
- Supply-water temperature.
- Return-water temperature.
- Water flow rate.
- Condition of air inlet.
Maintenance capability
FCU fits on the ceiling does not mean good design.
Enough space is needed to:
- Remove the filter.
- Clean the coil.
- Check the fan.
- Remove the engine.
- Check the valve package.
- Clean the tray.
- Condensate drainage.
9 common errors when designing and operating FCU

1. Choose FCU by area, no cooling load
The consequence may be a lack of power or an excess of capacity.
2. Select the wrong fan pressure
FCU has sufficient cooling capacity but the actual flow rate at air outlet is still low.
Consequences: Weak wind, cold rooms.
3. Lack of cold water flow rate
Causes can come from:
- Pump.
- Van.
- Pipeline.
- Hydraulic balance.
Consequences: FCU fans still running but cooling capacity decreased.
4. Unbalanced water branches
The FCU near the source can receive more water, while the one at the end of the line is missing flow rate.
Consequences: temperature of the areas is uneven.
5. Condensate line lacks slope
Consequences: standing water, tray overflow, bare leakage or odor arising.
6. thermal insulation non-sealed
Cold water road surfaces, valves or fittings may be subjected to condensation.
Consequences: small water and impact ceiling finishing.
7. No visit door arrangement
FCUs can operate but cannot be maintained favourably.
Consequences: must remove the ceiling when repairing.
8. Filter and coil dirty
Pressure loss on the wind side increases and heat transfer capacity decreases.
Consequences: cold weakness and increase the operating time.
9. Unsuitable load control
Thermostat, valve or fan speed does not respond to actual needs.
Consequences: temperature fluctuation and energy waste.
Why does FCU run but the room is still not cold?
When this condition is encountered, it should not be rush to conclude that the FCU is broken.
Can be tested in series:
Cold Source → Water → Coil → Wind → Control → Space
Some common causes:
- The chiller fails to reach supply-water temperature.
- Water flow rate through low FCU.
- The control valve did not open properly.
- Dirty coil.
- Filter dirty.
- Fan's low.
- ESP is not enough.
- The wind line has too much pressure loss.
- Temperature sensor sai.
- FCU lacks power compared to real load.
If multiple FCUs are weakly cold, priority should be given to testing center system and hydraulic network, instead of processing each device separately.
What should FCU maintenance check?
FCU maintenance is not simply cleaning filter.
A suitable procedure should test four groups simultaneously.
Air side
- Filter.
- Coil.
- Fan.
- Motor.
- Airflow rate.
- Vibration.
- Noise.
Cold water side
- Valve package.
- The junction.
- Leakage.
- Supply-water temperature – return.
- Water flow rate as needed.
Condensate System
- Water tray.
- Exhaust pipe.
- The slope.
- Obstructive conditions.
Controllers
- Thermostat.
- Actuator.
- Sensor.
- Valve opening/closing signal.
- Connect BMS if available.
After maintenance should check again:
Inlet – outlet wind temperature + ability to reach setpoint + airflow rate + condensate + vibration and noise.
How does HRT implement the FCU system?

The principle of implementation of HRT is:
Do not select equipment before understanding the construction problem correctly.
Step 1 – Survey
Rating:
- Functional.
- Architecture.
- Engineering ceiling.
- Equipment placement space.
- Maintenance conditions.
- Operational needs.
Step 2 – Calculate cooling load
Loads are determined by area or zone, rather than choosing FCUs solely by area.
Step 3 – Select your device
Simultaneous Testing:
Cooling capacity – airflow rate – ESP – Noise level – water flow rate – Size – Maintenance capacity
Step 4 – Design coordination
FCU must be coordinated with:
- Cold water system.
- Valve package.
- Condensate.
- Air duct.
- Air outlet.
- Electricity.
- Controls.
- BMS.
- Architecture.
- Finished ceiling.
Step 5 – Construction and inspection
Check location, altitude, water connection, thermal insulation, condensate drainage line, air duct and control signals.
Step 6 – TAB & Commissioning
Confirm:
- Water flow rate.
- Airflow rate.
- Thermal gap.
- Operate the valve.
- Thermostat.
- Actual operation conditions.
A good FCU only works when the entire system behind it is properly designed, constructed and calibrated.
Source: Publisher’s English edition · Vietnamese original on doanvanhoang.com